  1. Newsgroups: sci.space.news
  2. Path: sparky!uunet!think.com!ames!dont-send-mail-to-path-lines
  3. From: baalke@kelvin.Jpl.Nasa.Gov (Ron Baalke)
  4. Subject: Ulysses Update - 01/18/93
  5. Message-ID: <21JAN199318531661@kelvin.jpl.nasa.gov>
  6. To: sci-space-news@ames.arc.nasa.gov
  7. Followup-To: sci.space
  8. News-Software: VAX/VMS VNEWS 1.41    
  9. Keywords: Ulysses, JPL, ESA
  10. Sender: digester@news.arc.nasa.gov
  11. Nntp-Posting-Host: kelvin.jpl.nasa.gov
  12. Organization: Jet Propulsion Laboratory
  13. Date: Thu, 21 Jan 1993 18:53:00 GMT
  14. Approved: sci-space-news@ames.arc.nasa.gov
  15. Lines: 126
  16.  
  17. Forwarded from Peter Beech, Ulysses Mission Operations Manager
  18.  
  19. SUBJECT:  ULYSSES MISSION OPERATIONS REPORT No. 125
  20.  
  21. PERIOD:   12th January to 18th January 1993
  22.  
  23. 1.   MISSION OPERATIONS
  24.  
  25.      Experiment  reconfigurations  have  been  carried   out   as
  26.      required.
  27.  
  28.      A HUS (Solar X-ray instrument) calibration test was conducted on
  29.      12th January.
  30.  
  31.      A HED (Magnetic Field instrument) calibration was conducted on
  32.      13th January.
  33.  
  34.      A  KEP  EPAC  (Energetic Particles instrument) in-flight calibration
  35.      was  conducted  on  18th January.
  36.  
  37.      Routine Earth pointing manoeuvres were performed on 14th and
  38.      17th January.
  39.  
  40.      An  average of 92.06 % data recovery was achieved during the
  41.      reporting period.
  42.  
  43.      The percentage of data acquired as a function of bit rate is
  44.      as follows:
  45.  
  46.      1024 bps 49.63 %
  47.       512 bps 42.37 %
  48.  
  49.      The  lower  than  normal data recovery  for  this  reporting
  50.      period  was  due to a maser low noise amplifier  failure  at
  51.      Goldstone which caused a complete loss of a scheduled  pass.
  52.      The  outage was minimised by support being provided from the
  53.      Canberra  station.  A total of 10 hours of  real  time  data
  54.      were lost.
  55.  
  56. 2.   SPACECRAFT STATUS
  57.  
  58.      POWER
  59.  
  60.      Nominal.
  61.      Estimated S/C power consumption 257 watts.
  62.  
  63.      AOCS
  64.  
  65.      Nominal.
  66.      TTC
  67.  
  68.      The  spacecraft is currently configured with receiver  2  as
  69.      the  prime  unit  fed  via the high gain  antenna  and  with
  70.      receiver 1 as backup fed through the low gain antenna  (LGA-
  71.      F). The downlink is provided through EPC2/TWTA2.
  72.  
  73.      The  34  meter  ground stations are in use  to  support  TTC
  74.      operations.   Ranging  from  34  meter  ground  stations  is
  75.      performed when the spacecraft is configured for bit rates of
  76.      1024  bps  or  less.  Ranging passes from  70  meter  ground
  77.      stations are also being taken periodically.
  78.  
  79.      Received downlink level -138 dBm.(34 meter) X-band.
  80.  
  81.      (Variations of up to 10 db. can be expected as a  result  of
  82.      station  antenna  in  use,  local  weather  conditions,  and
  83.      spacecraft antenna off-pointing).
  84.  
  85.      Received uplink level -123 dBm.
  86.  
  87.      DATA HANDLING
  88.  
  89.      Nominal.
  90.  
  91.      THERMAL
  92.  
  93.      Nominal.
  94.  
  95. 3.   FLIGHT DYNAMICS
  96.  
  97.      Solar Aspect   The angle reduced from 9.85 on
  98.      Angle (deg.)   12th January to 9.24 on 18th January.
  99.  
  100.      Sun-Probe-Earth  The angle reduced from 9.81 on
  101.      Angle (deg.)     12th January to 9.12 on 18th January.
  102.  
  103.      Spin Rate               4.980 rpm.
  104.  
  105. 4.   ORBITAL DATA
  106.  
  107.      Data taken at 13:00 PDT on 18th January.
  108.      Distance from Earth                657,698,384 km.
  109.      Velocity relative to the Earth         124,022 km/hr.
  110.      Velocity relative to the Sun            34,220 km/hr.
  111.      Ecliptic latitude                         16.7 deg/south
  112.  
  113. 5.   PLANNED OPERATIONS
  114.  
  115.      Routine  data  gathering operations will  continue  together
  116.      with experiment reconfigurations as required.
  117.      On  19th  January  a KEP GAS (Interstellar Neutral Gas instrument)
  118.      monthly health  check  will  be carried out.
  119.  
  120.      On  25th  January a KEP EPAC in-flight calibration  will  be
  121.      carried out.
  122.  
  123.      Earth pointing manoeuvres will be performed on 20th and 23rd
  124.      January.
  125.  
  126.      Periods  of 2048 bps at low antenna elevations will continue
  127.      to  be  avoided to improve the signal to noise ratio.   This
  128.      will  slightly  reduce the percentage of 1024 bps  real-time
  129.      data received.
  130.  
  131. 6.   GROUND SEGMENT
  132.  
  133.      The  ground segment performed nominally during the reporting
  134.      period  with  the exception of the Goldstone  maser  problem
  135.      referred to above.
  136.      ___    _____     ___
  137.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  138.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  139.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Every once in a while,
  140. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | try pushing your luck.
  141. |_____|/  |_|/       |_____|/                     |
  142.  
  143.