home *** CD-ROM | disk | FTP | other *** search
/ NetNews Usenet Archive 1993 #3 / NN_1993_3.iso / spool / sci / space / news / 2888 < prev    next >
Encoding:
Text File  |  1993-01-21  |  2.4 KB  |  54 lines

  1. Newsgroups: sci.space.news
  2. Path: sparky!uunet!cs.utexas.edu!sun-barr!ames!dont-send-mail-to-path-lines
  3. From: baalke@kelvin.Jpl.Nasa.Gov (Ron Baalke)
  4. Subject: Mars Observer Update - 01/20/93
  5. Message-ID: <21JAN199317204961@kelvin.jpl.nasa.gov>
  6. To: sci-space-news@ames.arc.nasa.gov
  7. Followup-To: sci.space
  8. News-Software: VAX/VMS VNEWS 1.41    
  9. Keywords: Mars Observer, JPL
  10. Sender: digester@news.arc.nasa.gov
  11. Nntp-Posting-Host: kelvin.jpl.nasa.gov
  12. Organization: Jet Propulsion Laboratory
  13. Date: Thu, 21 Jan 1993 17:20:00 GMT
  14. Approved: sci-space-news@ames.arc.nasa.gov
  15. Lines: 37
  16.  
  17. Forwarded from the Mars Observer Project
  18.  
  19.                     MARS OBSERVER STATUS REPORT
  20.                         January 20, 1993
  21.                           9:00 AM PST
  22.  
  23. Flight Sequence C6 B became active at 11:58 AM on January 18.
  24. Magnetometer/Electron Reflectometer, Gamma Ray Spectrometer, and
  25. Mars Observer Camera were powered on for instrument calibration
  26. activities.  The MOC test continues through noon Monday, January 25, while
  27. MAG/ER (Magnetometer/Electron Reflectometer) and GRS (Gamma Ray Spectrometer)
  28. calibrations continue beyond that date. The MOC PI (Principal Investigator)
  29. reports that the instrument is performing as expected, but will not have
  30. image information available until sufficient analysis has been performed.
  31.  
  32. Digital Tape Recorders 1 and 3 will be played back on January 26 and 27.
  33. DTRs 1 and 3 contain the Geotail measurement data collected in December.
  34.  
  35. Efforts to receive Ka band telemetry last week were successful.
  36.  
  37. The Spacecraft Team reports that the spacecraft is performing nominally
  38. in Array Normal Spin.  Uplink and downlink are via the HGA (High Gain
  39. Antenna); uplink is at 125 bps; downlink at the 2k engineering rate during 
  40. periods of minimal activity, the 4k Science and Engineering rate during 
  41. instrument calibration activities, and at 16K during DTR playback.
  42.  
  43. Today the spacecraft is 58,313,994 km (36,234,636 miles) from Earth,
  44. traveling at a velocity of 12.9012 kilometers per second (28,859 miles
  45. per hour) with respect to Earth. One way light time is approximately 195
  46. seconds.
  47.      ___    _____     ___
  48.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  49.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  50.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Every once in a while,
  51. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | try pushing your luck.
  52. |_____|/  |_|/       |_____|/                     |
  53.  
  54.