home *** CD-ROM | disk | FTP | other *** search
/ The World of Computer Software / World_Of_Computer_Software-02-385-Vol-1of3.iso / g / gde757_1.zip / LHARC1.EXE / 2671.BLD < prev    next >
Text File  |  1993-01-06  |  3KB  |  181 lines

  1. #2671
  2. @001 Enter the name of the OWNER:
  3. @002 Enter the name of the CONTRACTOR:
  4. @100 Enter the description of the work to be performed:
  5. @101 Enter estimated completion schedule:
  6. !102 Enter the contract price:
  7. #2672 Do you want to specify materials to be used?
  8. #if#2672
  9. @300 Specify areas specified:
  10. @301 Enter specifications:
  11. #endif
  12. #2673 Will the contractor pay for permits?
  13. #2674 Will contract be required to provide proof of insurance?
  14. #if#2674
  15. !103 Enter insurance limits required (in numerals):
  16. #endif
  17. #2675/#2676/#2677 Draws will be based on:
  18. 1/3 Rough in;1/3 inspection;1/6;1/6
  19. Weekly draw on per centage of completion
  20. Joint checks on materials; 1/3;1/3- 1/6,1/6 on labor
  21. #2678 Is contractor required to remove trash?
  22. #2679
  23. #end control section
  24. #2671
  25. /* Para. 2671: Contract for remodeling, large */
  26.  
  27.  
  28.                       CONTRACTING AGREEMENT
  29.  
  30.  
  31.  
  32. @001, referred to as OWNER, and @002, referred to as CONTRACTOR, 
  33. agree as follows:
  34.  
  35.  
  36.  
  37. CONTRACTOR shall perform the following services for OWNER:
  38.  
  39.  
  40. @100
  41.  
  42.  
  43. on the following estimated schedule:
  44.  
  45.  
  46.  
  47. @101
  48.  
  49.  
  50.  
  51. for the following price: $ @102 (!102 dollars)
  52.  
  53.  
  54.  
  55. Contractor shall be responsible for the following in addition to 
  56. the workman like performance of the work stated above:
  57.  
  58.  
  59. #2672
  60. /* Para 2672: Spec of materials */
  61.  
  62.  
  63. The materials used for the following areas:
  64.  
  65.  
  66. @300
  67.  
  68.  
  69. shall meet the following respective specifications, or be 
  70. equivalent to the following manufacturer's product lines 
  71. described:
  72.  
  73.  
  74. @301
  75.  
  76.  
  77.  
  78. #2673
  79. /* Para 2673: Permits */
  80.  
  81.  
  82. Provision of all permits required for the services to be performed 
  83. above.
  84.  
  85.  
  86. #2674
  87. /* Para 2674: Insurance*/
  88.  
  89.  
  90. Provision of worker's compensation insurance, general liability 
  91. insurance in a minimum amount of $ @103 (!103 dollars).   
  92.  
  93.  
  94. #2675
  95. /* Para. 2675: Draw sked */
  96.  
  97.  
  98. The stipulated contract price shall be paid as follows:
  99.  
  100.  
  101. 1/3 on rough in; 1/3 on first inspection and 1/6 on final
  102. inspection and 1/6 on final inspection and completion of all
  103. appearance/punch list in items.
  104.  
  105.  
  106.  
  107. #2676
  108. /* Para. 2676: Weekly draw based on per centage of completion*/
  109.  
  110.  
  111.  
  112. The stipulated contract price shall be paid as follows:
  113.  
  114.  
  115. A weekly draw based upon per centage of completion, less a
  116. retainage of 10% per cent, which shall be paid on final
  117. inspection and completion of appearance/punch list items.
  118.  
  119.  
  120.  
  121. #2677
  122. /* Para. 2677: Bills for materials */
  123.  
  124.  
  125. The stipulated contract price shall be paid as follows:
  126.  
  127.  
  128. When bona fide bills for materials are presented the same shall
  129. be paid directly by the OWNER within the terms provided. Labor
  130. shall be paid as follows:
  131.  
  132.  
  133. 1/3 on rough in; 1/3 on inspection; 1/6 on completion; 1/6 on
  134. final inspection and completion of appearance/punch list items.
  135.  
  136.  
  137. #2678
  138. /* Para. 2678: Removal of trash */
  139.  
  140.  
  141. The CONTRACTOR shall daily remove all trash and debris from the
  142. premises.
  143.  
  144.  
  145.  
  146. #2679
  147. /* Para. 2679--- closer */
  148.  
  149.  
  150. This is the entire agreement between the parties and this 
  151. agreement may only be altered in writing.
  152.  
  153.  
  154.  
  155.  
  156.  
  157.  
  158. Dated: _________________________
  159.  
  160.  
  161.  
  162.  
  163.  
  164.  
  165.  
  166.  
  167. ____________________________________________________
  168.  
  169. @001
  170.  
  171.  
  172.  
  173.  
  174.  
  175.  
  176.  
  177. ____________________________________________________
  178.  
  179. @002
  180.  
  181.