  1. Southern Company's Plant McDonough (250 MW nominal)
  2. * this is a QUEST configuration file
  3. 4 one HP and one IP turbine, with reheat
  4. * Tb    Pb      Fb     Tr    BP
  5. 1000. 2415.  1734000. 1000. 1.50
  6. *HP turbine stages
  7.  1
  8. *HP turbine type
  9.  2  high pres., 3600-rpm, noncondensing, 1-row governing stage
  10. *HP turbine generator connection
  11.  1
  12. *HP turbine flow factor(s)
  13.  345.30
  14. *HPT throttle leak to reheater exit/IPT inlet
  15.  -27551.
  16. *HPT throttle leak to SSR
  17.   -1069.
  18. *HPT HP seal leak to SSR
  19.       0.
  20. *HPT HP seal leak to deaerator
  21.       0.
  22. *HPT HP seal leak to HPT exit/reheater inlet
  23.       0.
  24. *HPT LP seal leak to deaerator
  25.   -9029.
  26. *HPT LP seal leak to SSR
  27.   -3204.
  28. *IP turbine stages
  29.  6
  30. *IP turbine type
  31.  5  reheat, 3600-rpm, condensing, w/o governing stage
  32. *IP turbine generator connection
  33.  1
  34. *IP turbine flow factor(s)
  35.  170.80
  36.   79.29
  37.   30.85
  38.   18.79
  39.   10.67
  40. *IPT LP seal leak to deaerator
  41.       0.
  42. *IPT LP seal leak to SSR
  43.       0.
  44. *last stage annulus area in square feet (single flow)
  45.   55.60
  46. *number of annuli
  47.  2
  48. *FP turbine stages
  49.  0
  50. *generator 1 type
  51. 3 3600-rpm conductor-cooled
  52. *generator 1 rated KVA
  53.   320000.
  54. *makeup flow
  55.  -17340.
  56. *makeup injection
  57. H=hotwell
  58. *boiler pressure drop and efficiency
  59. 20.0  89.0
  60. *reheater pressure drop and efficiency
  61. 10.0  89.0
  62. *heat exchanger type, TTD, DCA, shell pressure drop
  63. * type 1: no drain inlet, type 2: drain inlet, type 3: open
  64. *type  TTD  DCA   DP
  65.    1    .0 10.0  5.0
  66.    2    .0 10.0  8.0
  67.    3    .0   .0  8.0
  68.    1   5.0 10.0  8.0
  69.    2   5.0 10.0  8.0
  70.    2   5.0 10.0  9.0
  71. YES, last heat exchanger before GSC drains to condenser
  72. *boiler feedpump efficiency
  73.  74.8
  74. *SSR flow to GSC
  75.       1.
  76. *SSR flow to condenser
  77.    2500.
  78. *service load (+KW or -%)
  79.     -5.00
  80.