  1. Alabama Power's Plant Miller Units 1-4 (660 MW nominal)
  2. * this is a QUEST configuration file
  3. 5 one HP, one IP, and one LP turbine, with reheat
  4. * Tb    Pb      Fb     Tr    BP
  5. 1000. 2400.  4449740. 1000. 3.50
  6. *HP turbine stages
  7.  1
  8. *HP turbine type
  9.  2
  10. *HP turbine generator connection
  11.  1
  12. *HP turbine flow factor(s)
  13.  121.9
  14. *HPT throttle leak to reheater exit/IPT inlet
  15.    3986.
  16. *HPT throttle leak to SSR
  17.    -885.
  18. *HPT HP seal leak to SSR
  19.   -4721.
  20. *HPT HP seal leak to open feedwater heater
  21.   -6581.
  22. *HPT HP seal leak to HPT exit/reheater inlet
  23.  -35615.
  24. *HPT LP seal leak to open feedwater heater
  25.   -7327.
  26. *HPT LP seal leak to SSR
  27.   -5783.
  28. *IP turbine stages
  29.  2
  30. *IP turbine type
  31.  6
  32. *IP turbine generator connection
  33.  1
  34. *IP turbine flow factor(s)
  35.   69.66
  36.   40.49
  37. *IPT LP seal leak to open feedwater heater
  38.       0.
  39. *IPT LP seal leak to SSR
  40.   -6076.
  41. *cross-over pressure drop factor
  42.    5.00
  43. *LP turbine stages
  44.  5
  45. *LP turbine type
  46.  6
  47. *LP turbine generator connection
  48.  1
  49. *LP turbine flow factor(s)
  50.   23.17
  51.   16.08
  52.    4.79
  53.    2.20
  54. *LPT LP seal leak to SSR
  55.       0.
  56. *last stage annulus area in square feet (single flow)
  57.   55.60
  58. *number of annuli
  59.  4
  60. *FP turbine stages
  61.  1
  62. *FP turbine type
  63.  8
  64. *FP turbine supply (1-7: HPT, 8-14:IPT, 15-21:LPT, 91:B, 93:R)
  65.  9
  66. *generator 1 type
  67. 3 3600-rpm conductor-cooled
  68. *generator 1 rated KVA
  69.   830000.
  70. *makeup flow
  71.  -44497.
  72. *makeup injection
  73. H=hotwell
  74. *boiler pressure drop and efficiency
  75. 15.0  88.5
  76. *reheater pressure drop and efficiency
  77. 10.0  88.5
  78. *heat exchanger type, TTD, DCA, shell pressure drop
  79. * type 1: no drain inlet, type 2: drain inlet, type 3: open
  80. *type  TTD  DCA   DP
  81.    1    .0 10.0  5.0
  82.    2    .0 10.0  8.0
  83.    3    .0   .0  5.0
  84.    1   5.0 10.0  8.0
  85.    2   5.0 10.0  8.0
  86.    2   5.0 10.0  8.0
  87.    2   5.0 10.0  8.0
  88. YES, last heat exchanger before GSC drains to condenser
  89. *boiler feedpump efficiency
  90.  86.3
  91. *SSR flow to GSC
  92.    2800.
  93. *SSR flow to condenser
  94.    2400.
  95. *SSR flow to LP turbine seals
  96.       0.
  97. *service load (+KW or -%)
  98.     -5.00
  99.