  1. 10.3 Reviewing a task when it is underway
  2.  
  3. If  a  task  is underway and the work done so far has been  recorded
  4. then there is an option which will assist with the recalculation  of
  5. the  tasks  schedule. The "Review calculation" menu  option  on  the
  6. "Task"  menu  allows  the end, work or rate,  as  indicated  by  the
  7. "End/work/rate"  menu option to be re-estimated. It  is  similar  to
  8. using  the  enter key to change the current task details which  also
  9. recalculates the tasks schedule. The difference is that this  option
  10. allows the work done so far to be taken into consideration.
  11.  
  12. The  dialog which appears when selecting this option will  show  the
  13. work  planned and the work done for comparison, along with the  date
  14. the  work  done was recorded up to. These values may not be  changed
  15. here.  It  is important for the calculation that the work  done  and
  16. date  are  accurate, failing to do this will result  in  incorrectly
  17. recalculated values. The remaining options which may be  updated  on
  18. the  review  calculation  dialog depend upon  what  value  is  being
  19. calculated:
  20.  
  21. End               The  remaining  work and resource work  rates  are
  22.                   displayed. The remaining work shows how much  work
  23.                   is  left  to do to complete the task (equals  work
  24.                   planned  minus the work done). The remaining  work
  25.                   rates are initially set to be equal to the current
  26.                   planned  work rates. Updating either the remaining
  27.                   work  and/or rates will set the work equal to  the
  28.                   work   done   plus   the  remaining   work,   will
  29.                   recalculate the end of the task and will  set  the
  30.                   resource rates for the task to be the average work
  31.                   rates  taking  into account the start,  and  newly
  32.                   calculated end and total planned work values.
  33.  
  34. Work              The   end  date  and  remaining  work  rates   are
  35.                   displayed. The remaining work rates are  initially
  36.                   set  to  the current planned work rates.  Updating
  37.                   either the end date and/or rates will set the work
  38.                   equal   to  the  work  done  plus  the  calculated
  39.                   remaining work and will set the resource rates  to
  40.                   be  the average work rate taking into account  the
  41.                   start, end and newly calculated planned work.  The
  42.                   remaining  work  is calculated by looking  at  the
  43.                   duration between the date indicated as being  when
  44.                   the work done was recorded up to and the end date,
  45.                   taking into account the remaining work rates.
  46.  
  47. Rate              The remaining work and end date are displayed. The
  48.                   remaining work shows how much work is left  to  do
  49.                   to  complete  the task (equals work planned  minus
  50.                   the work done). Updating either the remaining work
  51.                   and/or  end  will set the work equal to  the  work
  52.                   done  plus  the remaining work and  will  set  the
  53.                   resource rates appropriately.
  54.  
  55. 11. MEMOS
  56.  
  57. A  memo, or Psion Word document may be associated with each task. To
  58. create a new memo select the "Edit memo" menu option from the "Task"
  59. menu. This will activate the Psion Word Application. Enter the  memo
  60. and exit Word to return to Plan. Once a memo has been created a memo
  61. symbol will appear next to the description for the task in the  task
  62. list view. To subsequently view or edit the memo use the "Edit memo"
  63. option.
  64.  
  65. To remove a memo use the "Delete memo" menu option.
  66.  
  67. Memos are stored in a sub-directory below the directory in which the
  68. plan  file is stored. The sub-directory will have the same  name  as
  69. the  plan  file.  Each memo will be stored as a separate  Word  file
  70. within  the sub-directory. Memo filenames are constructed using  the
  71. task  Id  and  therefore  task Id's should be  restricted  to  valid
  72. filenames.
  73.  
  74. If  a plan file is deleted, moved or renamed, remember to update any
  75. sub-directory which contains memo files, otherwise Plan will not  be
  76. able to find the memos.
  77.  
  78. 12. RESOURCES
  79.  
  80. Plan  allows any number of resources to be created, subject to Psion
  81. memory  limitations. The work hours for each day  of  the  week  are
  82. stored  in  the form of start and end times. There is also  a  three
  83. year  calendar  which indicates the resources holidays  or  non-work
  84. days.
  85.  
  86. By default when first using Plan only one resource will be available
  87. called  "General".  This  will be constructed  using  the  following
  88. rules:
  89.  
  90.  - The  current  year  is used as the start of  the  three  year
  91.    calendar period.
  92.  - The  work/non-work days for the three year calendar  are  set
  93.    according to the work days which have been set in the Psion  Time
  94.    application.
  95.  - The start and end time for each work day will default to 9:00am
  96.    and 5:00pm respectively.
  97.  
  98. When  creating  additional  resources the  work  hours  and  holiday
  99. settings  are  copied from the "General" resource.  Consequently  it
  100. will  save time by setting common work hours and public holidays  in
  101. the "General" resource before creating any additional resources.
  102.  
  103. The  holidays set for the "General" resource should be common public
  104. or  bank  holidays. Changing the holidays for the "General" resource
  105. will  update  the equivalent days for all other existing  resources,
  106. e.g. if 25 December is changed to a holiday then all other resources
  107. will  be  updated to ensure that the 25 December is also a  holiday.
  108. Individual  resource holidays may subsequently be  overridden  on  a
  109. resource by resource basis.
  110.  
  111. To  create  a  new  resource use the "Make"  menu  option  from  the
  112. "Resource" menu. This will prompt for a resource name which must  be
  113. unique.  To  delete a resource select the "Kill" menu  option.  This
  114. will  display  a  dialog prompting for the name of the  resource  to
  115. delete.  Any  existing  tasks which use the resource  will  then  be
  116. switched to use the "General" resource.
  117.  
  118. There  is a concept of a current resource in the same way that there
  119. is  a  current task. The current resource is the resource  which  is
  120. displayed  in  the resource usage and holiday views. To  change  the
  121. current  resource use the "Switch to" menu option on the  "Resource"
  122. menu,  or  press  the  tab or shift-tab key  to  cycle  through  the
  123. available resources in the resource based views.
  124.  
  125. 13. PREFERENCES
  126.  
  127. The  following  preferences may be set using the "Preferences"  menu
  128. item on the "Special" menu:
  129.  
  130.                              PERT chart
  131.  
  132. Task top text     None,   Description,  Start,  End,   Work,   Rate,
  133.                   Resource, Done, Labour, Fixed, Total, Value, Text,
  134.                   Saved Start, Saved End, Saved Work, Dependencies
  135.  
  136. Task bottom text  None,   Description,  Start,  End,   Work,   Rate,
  137.                   Resource, Done, Labour, Fixed, Total, Value, Text,
  138.                   Saved Start, Saved End, Saved Work, Dependencies
  139.  
  140.                              Gantt chart
  141.  
  142. Task bar text     None,   Description,  Start,  End,   Work,   Rate,
  143.                   Resource, Done, Labour, Fixed, Total, Value, Text,
  144.                   Saved Start, Saved End, Saved Work, Dependencies
  145.  
  146. Holiday shading   Use general, Resource specific
  147.  
  148. Shading control   None, Day zoom, Week zoom, Month zoom
  149.  
  150. Saved start/end bar    Yes, No
  151.  
  152.                              Calculation
  153.  
  154. New tasks         End, Work, Rate
  155.  
  156. Recalculation     Automatic or Manual
  157.  
  158.                                Display
  159.  
  160. Dates/times       Dates & times, Dates only
  161.  
  162. Grey graphics     Yes, No
  163.  
  164.                               Resources
  165.  
  166. Average work day  Time in hours and minutes
  167.  
  168. The  PERT chart task top and bottom text options control which items
  169. appear above and below the task boxes in the PERT chart.
  170.  
  171. The  Gantt chart task bar text controls what is displayed at the end
  172. of each task bar in the Gantt chart.
  173.  
  174. The Gantt holiday shading option controls the shading of holidays in
  175. the  Gantt chart. If set to "Resource specific" any non-working days
  176. will  be  shaded  grey  for  the particular  resource  the  task  is
  177. allocated  to.  The  "General" resource will  be  used  if  multiple
  178. resources are assigned to one task. If set to "Use general" then all
  179. shading will use the holidays for the "General" resource. The  later
  180. option will result in much faster redraws of the Gantt chart.
  181.  
  182. Note  that shading can be time consuming when zoomed out, hence  the
  183. "Shading  control"  option allows it to be  turned  on  at  suitable
  184. scales.
  185.  
  186. The  Gantt chart saved start/end bar option controls whether one  or
  187. two  bars are used for each task in the Gantt chart. If one  bar  is
  188. used  (the "No" option) then the bar indicates the start and end  of
  189. the  task. If two bars are used (the "Yes" option) then a lower  bar
  190. is  also  displayed which indicates the equivalent  dates  from  the
  191. saved  start  and  end fields. This is useful  for  seeing  how  the
  192. current plan compares with the original estimates.
  193.  
  194. The  new  task calculation item controls whether for new  tasks  the
  195. end, work or rate of work is calculated. For existing tasks this may
  196. be controlled individually using the "End/work/rate" menu option.
  197.  
  198. If  the  recalculation option is set to automatic then if  any  task
  199. changes  any  tasks which are dependent upon the task will  also  be
  200. recalculated.  This  implies that it should never  be  necessary  to
  201. force  a recalculation unless resource details change. When  set  to
  202. manual  only the task which is edited will be recalculated, in  this
  203. case the tab key or "Recalculate all" menu option should be used  to
  204. recalculate all tasks when required.  Note that the critical path is
  205. not  automatically updated even if the calculation option is set  to
  206. automatic. The "Recalculate all" or the "Critical path" menu options
  207. should be used to update the critical path when required.
  208.  
  209. The  dates/times  preference  setting  controls  whether  times  are
  210. entered  and displayed. If it is set to "Dates & times"  then  start
  211. and  end  dates  will include a time component. If  the  setting  is
  212. "Dates only" then start and end dates will have no time component.
  213.  
  214. The  grey  graphics  option controls whether a grey  plane  is  used
  215. within Plan. This provides an enhanced display at the expense of  an
  216. extra 10K of memory.
  217.  
  218. The  average work day option defines the duration of one normal work
  219. day.   This  unit of work is used when entering work and  work  done
  220. values.  Typically this should be set to the length  of  an  average
  221. working day, including any breaks.
  222.  
  223. The  preference settings are saved in the plan and resource file and
  224. so will be restored the next time the files are opened by Plan.
  225.  
  226. 14. PRINTING
  227.  
  228. The  task  list may be printed using the print options available  on
  229. the  "File" menu from the task list view. The output from the  print
  230. option  is  sent  to the device specified using the  "Printer"  menu
  231. option  accessed from the "Control" menu on the Psion system screen.
  232. This  may be set to use a printer attached to the serial or parallel
  233. port or a file. If the given destination is not ready, e.g. a serial
  234. cable is not connected then an error message will be displayed.
  235.  
  236. The  print  output  may also be sent through a  PC  to  an  attached
  237. printer  via Psion's PsiWin software. Note that PsiWin  is  a  Psion
  238. software product and is not supplied with Plan.
  239.  
  240. The  "Print Setup" menu option on the "File" menu controls the paper
  241. size,  orientation,  printer type, etc. This  option  also  provides
  242. control  over the range of fields or columns which are to be printed
  243. from  the  task list and the width of the description and user  text
  244. fields.  Where the specified printer cannot handle the  printing  of
  245. all  the  fields  from  the task list across the  page  it  will  be
  246. necessary  to use the print option more than once with  a  different
  247. range  of  fields each time. The task Id and description fields  are
  248. always  printed on the left of the page, the range of fields printed
  249. on the right may be specified.
  250.  
  251. The  "Print preview" menu option may be used to take a look  at  the
  252. overall page layout prior to printing.
  253.  
  254. There  is  an  optional postscript printer module for  printing  the
  255. Gantt and PERT charts (see "Modules" section).
  256.  
  257. 15. MODULES
  258.  
  259. A  number of plug in modules are available with Plan. These  modules
  260. consist of files with an OPO file extension which are located  in  a
  261. sub-directory  called  PLAN  below  the  directory  where  the  main
  262. PLAN.OPA  file  is kept. When these modules are available  the  "Run
  263. module"  menu  option  on  the  "Special"  menu  will  display   the
  264. additional  facilities supplied by the optional modules.  Each  Plan
  265. module will appear as a separate item within the modules dialog.  To
  266. access  a  module select the corresponding item in  the  run  module
  267. dialog.
  268.  
  269. The currently available modules are:
  270.  
  271. MPX.OPO           Allows  data to be transferred between  the  Psion
  272.                   Plan  application and Microsoft  Project  3.0  and
  273.                   4.0.
  274.  
  275. PS.OPO            Provides a postscript print facility for the Gantt
  276.                   and PERT charts.
  277.  
  278. AGN.OPO           Allows  tasks  to be exported to  a  Psion  Agenda
  279.                   file.
  280.  
  281. 15.1 Microsoft Project MPX module
  282.  
  283. The  MPX  module allows task and resource data to be exchanged  with
  284. Microsoft  Project  3.0  and 4.0. To transfer  data  into  Microsoft
  285. Project:
  286.  
  287.  - Ensure  that the MPX.OPO module is installed in  a  directory
  288.    called \APP\PLAN on any drive.
  289.  - Ensure the plan to be transferred is open.
  290.  - Select the "MPX transfer" option from the "Run module" menu
  291.    item.
  292.  - Select "Export".
  293.  - Enter the name of the MPX export file which is to be created.
  294.  - The file will be generated.
  295.  - Transfer the MPX file to the relevant host machine.
  296.  - Start  up Microsoft Project and select the open file  option.
  297.    Choose  the MPX 1.0, 3.0 or 4.0 file type rather than the Project
  298.    file type (it does not matter which version of MPX file is used).
  299.  - If  asked whether the file should be merged into the  current
  300.    project  choose "No". It is not possible to merge a plan into  an
  301.    existing Microsoft Project plan.
  302.  
  303. To transfer a project from Microsoft Project into Psion Plan:
  304.  
  305.  - Save the file as an MPX file (any version) and transfer it to
  306.    the Psion.
  307.  - Create  a new Psion plan and resource file. The data  may  be
  308.    merged into an existing plan and resource file provided the incoming
  309.    task Id and resource initials are equivalent to any old ones.
  310.  - Select the "MPX transfer" option in Plan.
  311.  - Choose "Import".
  312.  - Select the MPX import file which is to be read.
  313.  - The  file  will  now be read. Look for any warning  or  error
  314.    messages in the output. Press any key when complete to continue in
  315.    Plan.
  316.  
  317. Note  the  following points before attempting to  import  data  into
  318. Plan:
  319.  
  320.  - Plan expects numbers to be in a given format, as specified by
  321.    the "Number formats" menu option on the "Control" menu of the Psion
  322.    system  screen.  For  example, if you have a  German  version  of
  323.    Microsoft Project then in general numbers will include a comma for a
  324.    decimal point rather than a dot. The number format settings on the
  325.    Psion  should match the international settings on the  PC  before
  326.    exporting/importing MPX files.
  327.  - Avoid  modifying  the  standard Export  tables  in  Microsoft
  328.    Project.
  329.  - Plan  expects a date format of the form "31/12/95", "31/12/95
  330.    12:33am" or "31/12/95 12:33". The date order is not important, e.g.
  331.    92/12/31 may also be used. Ensure the date format is set correctly
  332.    in Microsoft Project preferences before creating the MPX file. In MS
  333.    Project 4.0 the date format may be set as above from the "Options"
  334.    menu item on the "Tools" menu and in the "View" section.
  335.  - Plan  uses the resource initials field for the resource name,
  336.    these should be set in Microsoft Project.
  337.  - Plan ignores dependencies of the type Finish-Finish and Start-
  338.    Finish.
  339.  - Plan  assumes a holiday lasts all day so avoid holidays which
  340.    are less than a full day in Microsoft Project.
  341.  
  342. 15.2 Postscript module
  343.  
  344. The  postscript module may be used to print the Gantt or PERT  chart
  345. on  a postscript printer. Selecting the print postscript menu option
  346. from  the  "Run module" dialog will display a dialog which  controls
  347. which chart to print along with the page size and orientation.
  348.  
  349. The  output  from the postscript module will be sent to  the  device
  350. specified using the "Printer" menu option on the "Control"  menu  on
  351. the Psion system screen. If the given destination is not ready, e.g.
  352. a  serial  cable  is  not connected then an error  message  will  be
  353. displayed.
  354.  
  355. The  custom width and height apply only if the page size is  set  to
  356. "Custom".   These   give  the  smallest  and  largest   measurements
  357. respectively  of the paper in centimetres. The margin item  controls
  358. the width of the margin around the edge of the paper.
  359.  
  360. When  printing  the  Gantt chart a second dialog will  appear  which
  361. allows the date range to be specified. This may be set to either the
  362. entire  project, derived from the current Gantt view, the  remaining
  363. part of the project, or a specified date range. The custom start and
  364. end  dates  are  used only when the range item  is  set  to  "custom
  365. dates".  The  Gantt chart will be paginated if necessary,  the  PERT
  366. chart will always be printed on one page.
  367.  
  368. When  printing  the  PERT chart a second dialog  will  appear  which
  369. allows  a  section of the PERT chart to be printed. If set to  "All"
  370. then  all  the PERT chart will be printed on one sheet of paper.  If
  371. set  to  "Pert  view" then the top left corner of the printout  will
  372. match the top left corner of the current view in the PERT chart.  In
  373. this  case the "Pert view screens" option controls the amount to  be
  374. printed,  a value of 1 implies that the printout will correspond  to
  375. the PERT chart.
  376.  
  377. Note  that printouts may be sent to a printer connected to a PC  via
  378. the  RPRINT  utility and a 3Link cable. RPRINT is  included  in  the
  379. freely  available  RCOM package developed by  Psion  which  is  also
  380. supplied with PsiWin.
  381.  
  382. Users without access to a postscript compatible printer may like  to
  383. investigate  the  facilities  available  with  the  software  called
  384. Ghostscript. This allows postscript output to be viewed and  printed
  385. on most printers connected to a PC. Aladdin Ghostscript and a front-
  386. end   called  Ghostview  may  be  obtained  via  the  Internet  from
  387. ftp.cs.wisc.edu in the directory /pub/ghost.
  388.  
  389. 15.3 Agenda module
  390.  
  391. The Agenda module provides a mechanism for transferring task details
  392. to  the Psion Agenda application. Plan will create a new agenda file
  393. which contains a dated to-do entry for each task in the current open
  394. plan.  The due date of each to-do item will be the end date for  the
  395. corresponding task. The start date of the task will be used  as  the
  396. date from which the to-do will be displayed in the day/week view  of
  397. Agenda.  The interface also provides a facility to set an alarm  for
  398. each  to-do entry which will activate at the given time on  the  end
  399. date for the task.
  400.  
  401. Once  the  agenda  file  has been created  there  are  two  possible
  402. techniques for using the file:
  403.  
  404.  - Maintain the file as a separate Agenda file and open it as  a
  405.    separate Agenda process.
  406.  - Merge the file into an existing Agenda file.
  407.  
  408. 16. COMMAND SUMMARY
  409.  
  410. Menu      Name            Key      Purpose
  411.  
  412. File      New             psion-n  Create new plan file
  413.           Open            psion-o  Open existing plan file
  414.           Save as         psion-a  Save plan under a new name or
  415.                                    save plan as a text file (comma
  416.                                    separated, tab separated or
  417.                                    space padded)
  418.           Save            psion-s  Save plan and resource file
  419.           Revert          psion-v  Revert plan and resource files
  420.                                    to last saved versions
  421.           Print setup     psion-y  Print configuration (paper
  422.                                    size, orientation, printer,...)
  423.           Print preview   psion-*  Preview output from print
  424.                                    option
  425.           Print           psion-p  Print task list to the serial
  426.                                    or parallel port or a file. Use
  427.                                    the system screen printer
  428.                                    control option to set-up the
  429.                                    print destination and
  430.                                    parameters
  431. Edit      Copy            psion-c  Copy current task into a buffer
  432.           Insert          psion-i  Re-insert task from buffer
  433.           Delete          psion-J  Delete current task (see also
  434.                                    Delete key)
  435.           Edit memo       psion-M  Create or edit memo associated
  436.                                    with current task
  437.           Delete memo     psion-D  Delete memo associated with
  438.                                    current task
  439. Task      End/work/rate   psion-r  Change current task calculation
  440.                                    to end, work or rate
  441.           Dependencies    psion-d  Change current task
  442.                                    dependencies
  443.           Cost & data     psion-b  Change cost and user data
  444.           Set work done   psion-W  Enter/update work done field
  445.                                    for current task
  446.           Review          psion-R  Re-estimate end/work/rate for
  447.           calculation              current task taking into
  448.                                    consideration work done so far
  449.                                    and remaining work
  450.           Pert Move       psion-A  Move current task in PERT chart
  451.                                    dynamically using cursor keys,
  452.                                    any key exits mode
  453.           Pert X/Y        psion-Y  Set current tasks x, y PERT
  454.                                    position
  455. Resource  Make            psion-m  Make a new resource
  456.           Kill            psion-k  Delete a resource
  457.           Switch to       psion-w  Change current resource and
  458.                                    display resource histogram
  459.                                    display
  460.           Rename          psion-j  Rename a resource
  461.           Settings        psion-u  Set current resource maximum
  462.                                    units, charge rate and work
  463.                                    hours.
  464.           Over-           psion-L  Checks for cases where
  465.           allocated?               resources have been allocated
  466.                                    too much work. Displays tasks
  467.                                    associated with over-allocated
  468.                                    resources
  469.           Holiday count   psion-h  Count non-public holidays
  470.                                    between two dates for current
  471.                                    resource
  472.           Start year      psion-K  Set year for start of three
  473.                                    holiday calendar for all
  474.                                    resources
  475. Plan      Set fields      psion-E  Set saved fields or set user
  476.                                    text field to a W.B.S
  477.                                    identifier
  478.           Critical Path   psion-/  Recalculate critical path
  479.           Recalculate     psion-   Force recalculation of tasks
  480.           all             minus    (see also tab)
  481.           Totals          psion-e  Calculate and display summary
  482.                                    of totals for current plan
  483.                                    (work planned, done, % done,
  484.                                    start and end dates, costs)
  485. View      Zoom font in    psion-z  Alter size of font
  486.           Zoom font out   psion-Z  Alter size of font
  487.           Zoom in         psion-z  Change scale on time axis
  488.           Zoom out        psion-Z  Change scale on time axis
  489.           Field order     psion-t  Customise order of fields in
  490.                                    task list view
  491.           Mask tasks      psion-B  Controls which tasks are
  492.                                    visible in Task list, Gantt and
  493.                                    PERT charts
  494.           Sort tasks      psion-S  Sort tasks
  495.           Layout PERT     psion-l  Automatically layout tasks in
  496.                                    PERT chart
  497.           Refresh         psion-F  Refresh screen
  498.           Cursor off      psion-C  Turn cursor off until any key
  499.                                    pressed (useful in combination
  500.                                    with psion-control-shift-s
  501.                                    which saves current screen to a
  502.                                    file)
  503. Special   Preferences     psion-q  Set preferences
  504.           Find text       psion-f  Find given text in task id,
  505.                                    description or user text fields
  506.           Find again      psion-g  Find next occurrence of text
  507.           About Plan      psion-V  Display information about Plan.
  508.           Register        psion-Q  Register Plan using a
  509.                                    registration key.
  510.           Run module      psion-   Run optional Plan module
  511.                           plus
  512.           Exit            psion-x  Exit Plan
  513. Diamond   Task view       psion-N  Switch to task view
  514.           Task list       psion-T  Switch to task list view
  515.           Gantt chart     psion-G  Switch to Gantt chart view
  516.           PERT chart      psion-P  Switch to PERT chart view
  517.           Resource usage  psion-U  Switch to resource usage view
  518.           Holidays        psion-H  Switch to holiday view
  519. (Keys)                    Tab      Force recalculation of all
  520.                                    tasks
  521.                           Enter    Edit current task details
  522.                           Shift-   Insert a new task above current
  523.                           Enter    task
  524.                           Delete   Delete current task
  525.                           Help     On-line help system
  526.                           Space    Re-centre Gantt or PERT display
  527.                                    on current task
  528.                           Esc      Abort recalculate all
  529.  
  530. 17. HISTORY
  531.  
  532. Version (Date)     Notes
  533.  
  534. 1.0.1 (May. `94)   Restricted alpha 1 release for evaluation
  535.               purposes only.
  536.  
  537. 1.1.1 (July `94)   Restricted alpha 2 release for evaluation
  538.               purposes only.
  539.               Minor bug fix to dependency dialog.
  540.  
  541. 1.2.1 (Sep. `94)   Restricted alpha 3 release for evaluation
  542.               purposes only.
  543.               Added critical path option.
  544.               Enhanced PERT task display to allow text above and
  545.               below task boxes to be set independently. Also added
  546.               resource, rate and status to list of options for PERT
  547.               task texts.
  548.               Adjusted positioning of tasks with auto PERT layout
  549.               and position of texts above task boxes.
  550.               Increased maximum number of tasks from 74 to 99.
  551.               Increased maximum x-shift on PERT chart.
  552.  
  553. 1.3.1 (Sep. `94)   Bug fix to zoom option in Gantt view when using
  554.               new project.
  555.               Changed duration to work.
  556.               Made building of default calendar faster.
  557.               Added optional modules menu.
  558.               Created MPX transfer module.
  559.  
  560. 2.0.2 (Oct. `94)   First public release.
  561.               Change in file formats.
  562.               Added extra task fields for work done, costs and user
  563.               data.
  564.               Renamed some of the menus and rearranged some of the
  565.               menu key activation's.
  566.               Added recalculation and tracking options.
  567.               Amended MPX module to work with extra fields.
  568.               Added border to all views.
  569.               Changed print option to use system screen print set-
  570.               up.
  571.               Added shareware registration.
  572.  
  573. 2.1.2 (Nov. `94)   Minor bug-fix, check for \PLN directory failed.
  574.  
  575. 2.2.2 (Jan. `95)   Added options to shade holidays in Gantt chart,
  576.               (enabled from the preferences setting).
  577.               Milestones now drawn differently in Gantt chart.
  578.               Shift-diamond works in opposite direction to diamond
  579.               key.
  580.               Refresh can now be interrupted by diamond key.
  581.               Tasks can now be sorted by a number of fields.
  582.               New postscript printer module.
  583.               New module providing interface to Agenda.
  584.               A few other minor changes.
  585.               Fixed a few bugs.
  586.  
  587. 3.0.3 (Mar. `95)   Major new release.
  588.               File formats changed.
  589.               Maximum number of tasks increased to 200 from 99.
  590.               Description field length increased from 30 to 255.
  591.               Maximum number of dependencies per task increased from
  592.               4 to 8.
  593.               Added summary/outline tasks.
  594.               4 font sizes now available using standard psion-z
  595.               keys.
  596.               PERT chart now zoomable and with vertical scroll.
  597.               Added extensive on-line help.
  598.               Speed of core algorithm improved.
  599.               Speed of holiday shading in Gantt chart improved.
  600.               Added facility to allow field order in task list to be
  601.               user definable.
  602.               Memos may be associated with each task.
  603.               Added support for 24 hour time format.
  604.               Added code to get around OPL limit on long choice
  605.               lists when have many tasks and resources.
  606.               Menus are now view sensitive, i.e. inappropriate
  607.               options do not appear.
  608.               Added support for 8 character currency symbols.
  609.               Added option for year symbol in Agenda interface.
  610.               Agenda interface now creates a named to-do list.
  611.               Various minor enhancements and bug-fixes.
  612.  
  613. 3.1.3 (Aug `95)    Added mask option to control which tasks are
  614.               shown (mask by level, resource, date,...).
  615.               Option to display a task field at the end of each task
  616.               bar in the Gantt chart.
  617.               Sort tasks by Id field.
  618.               More information in plan totals display.
  619.               Updating general holidays affects holidays for all
  620.               other resources.
  621.               Added option to count a resources holidays between 2
  622.               dates.
  623.               Some changes to MPX module to better support MS
  624.               Project 4.0 and German MPX file format.
  625.               Now looks for registration file, plan.reg, on disks
  626.               A:, B: and M:.
  627.               Displays date at top of holiday view.
  628.               Option to specify project specific or common resource
  629.               file when creating a new project.
  630.               Bug fix so that if update task doesn't delete any
  631.               attached memos.
  632.               Bug fix to postscript print module so that uses
  633.               correct shading when printing full project.
  634.               A few other minor changes.
  635.  
  636. 3.2.4 (Oct `95)    Added resource maximum units data.
  637.               Option to find over-allocated resources.
  638.               Added saved start, end and work fields so that the
  639.               latest dates can be compared with the initial
  640.               settings.
  641.               New "Set fields" menu option to set saved fields or to
  642.               set user text field to a W.B.S identifier.
  643.               New mask options on start and end date field mask
  644.               which compares fields to saved fields.
  645.               New find option.
  646.               Implemented proper Psion print setup, print preview
  647.               and print options for task list. Previous print
  648.               options are now available under the menu option "Save
  649.               as".
  650.               New preference option which controls whether dates and
  651.               times are used or just dates.
  652.               Menus reorganised to be more consistent with other
  653.               Psion applications and make room for more options.
  654.               Tab and shift-tab can now be used in holiday and usage
  655.               views to cycle through resources.
  656.               Pressing space in Gantt and PERT chart will alter zoom
  657.               to display current task.
  658.               CTRL-up and CTRL-down move to top/bottom of task list.
  659.               Improved interrupt to refresh of screen on specific
  660.               keys.
  661.               Current view, task and resource is saved when the plan
  662.               is saved.
  663.               Save option now always saves, instead of saying the
  664.               plan has not changed.
  665.               Various improvements to MPX module.
  666.               A few other minor enhancements and bug-fixes.
  667.               
  668. 4.0 (Apr `96)      Backed out some of the changes made to do with
  669.               the dates/times preference setting to avoid rounding
  670.               errors. This option now only affects the input/display
  671.               of times not the internal calculation.
  672.               Plan now uses an external message file so that it can
  673.               be translated into a number of languages.
  674.               Multiple resources may be assigned to one task.
  675.               Grey plane option.
  676.               Description and dependencies may now be shown in the
  677.               Gantt and PERT charts.
  678.               The print setup is now saved with the plan.
  679.               Postscript output greatly improved.
  680.               New Plan start up title screen.
  681.               Mask sub-tasks option.
  682.               Memory handling completely different, (now uses less
  683.               memory for small plans).
  684.               Completed tasks now crossed out in PERT chart.
  685.               A few minor bug-fixes.
  686.  