home *** CD-ROM | disk | FTP | other *** search
/ NetNews Usenet Archive 1992 #23 / NN_1992_23.iso / spool / rec / autos / tech / 13866 < prev    next >
Encoding:
Internet Message Format  |  1992-10-11  |  2.9 KB

  1. Path: sparky!uunet!europa.asd.contel.com!darwin.sura.net!zaphod.mps.ohio-state.edu!pacific.mps.ohio-state.edu!linac!att!cbnewsc!cbfsb!att-out!pacbell.com!decwrl!netcomsv!spacebbs!howard.smith
  2. From: howard.smith@spacebbs.com (Howard Smith) 
  3. Newsgroups: rec.autos.tech
  4. Subject: hydridepg3
  5. Message-ID: <3865.1558.uupcb@spacebbs.com>
  6. Date: 10 Oct 92 23:50:00 GMT
  7. Distribution: world
  8. Organization: SPACE BBS - Menlo Park, CA - 10 Lines + 4gB - 415-323-4193
  9. Reply-To: howard.smith@spacebbs.com (Howard Smith) 
  10. Lines: 54
  11.  
  12. AHA-SV Page 3
  13.  
  14. 19. Cool the hydride storage tank down to 50 degrees F., maint-
  15.     taining the 300 psi hydrogen gas pressure.
  16. 20. Repeat 17, 18, 19.
  17. 21. Repeat 17, 18, 19. [ Three times should be sufficient ther-
  18.     mal  cycling to make the hydride absorb as much hydrogen  gas
  19.     as possible.
  20. 22. Seal the valves of the hydride storage tank and ship it to be
  21.     installed at the site of hydrogen use.
  22.  
  23. !INSTALLING THE HYDRIDE STORAGE TANK
  24.  
  25. When  installing make sure that the connection lines  are  purged
  26. with pure hydrogen gas right before connection, to ensure that as
  27. little as possible of air gets into the hydride storage tank. The
  28. Co,  Co2, and H20 vapor in the air can all poison the hydride  so
  29. they must be excluded.
  30.  
  31. Whenever recharging the hydride storage tank make sure that the
  32. hydrogen  gas is as pure as you can get it. (See the  article  on
  33. the  AHA  Electrolyser and its cleaning  systems.)  The  standard
  34. recharging sequence is:
  35.  
  36. 1. To connect a high pressure hydrogen hose from a compressed gas
  37.    source  or  directly  from  the  outlet  of  an   electrolyser
  38.    to  the  hydride storage tank. Taking care to purge  the  hose
  39.    during the process of connection.
  40.  
  41. 2. Hook  up the internal cooling system of the  hydride storage
  42.    tank and keep it as cool as possible as long as the hydrogen
  43.    gas is entering the tank. The hydriding reaction creates heat
  44.    and the hydride must be cooled or it will heat up and the
  45.    sponge action will not take place.
  46.  
  47. 2. Increase the hydrogen gas pressure to approximately 100 psi.
  48.     for  approximately ten minutes, to start the  hydriding  pro-
  49.     cess,  then  increase  it to 300 psi for  an  additional  ten
  50.     minutes to complete the process.
  51.  
  52. 3.  Disconnect the hose and make sure the inlet valve is  sealed.
  53.     ie.  quick disconnect. and replace the quick disconnect  back
  54.     into a clean protected storage holder.
  55.  
  56. The  hydride  storage tank will cycle between charging  and  dis-
  57. charging  some ten thousand times before the  ferrous,  titanium,
  58. manganese hydride decrepitates to such a small particle size that
  59. it  doesn't function very well. At that point bring  the  hydride
  60. storage tank back to the recycling station so that the  materials
  61. of  the hydride can be taken out and remelted and reused to  give
  62. another ten thousand cycles.
  63. ---
  64.  . SLMR 2.1a . Backup not found: (A)bort (R)etry (P)anic
  65.                                                       
  66.