home *** CD-ROM | disk | FTP | other *** search
/ NetNews Usenet Archive 1993 #3 / NN_1993_3.iso / spool / sci / space / news / 2916 < prev    next >
Encoding:
Text File  |  1993-01-27  |  2.1 KB  |  49 lines

  1. Newsgroups: sci.space.news
  2. Path: sparky!uunet!enterpoop.mit.edu!usc!elroy.jpl.nasa.gov!ames!dont-send-mail-to-path-lines
  3. From: baalke@kelvin.Jpl.Nasa.Gov (Ron Baalke)
  4. Subject: Mars Observer Update - 01/26/93
  5. Message-ID: <27JAN199301165056@kelvin.jpl.nasa.gov>
  6. To: sci-space-news@ames.arc.nasa.gov
  7. Followup-To: sci.space
  8. News-Software: VAX/VMS VNEWS 1.41    
  9. Keywords: Mars Observer, JPL
  10. Sender: digester@news.arc.nasa.gov
  11. Nntp-Posting-Host: kelvin.jpl.nasa.gov
  12. Organization: Jet Propulsion Laboratory
  13. Date: Wed, 27 Jan 1993 01:16:00 GMT
  14. Approved: sci-space-news@ames.arc.nasa.gov
  15. Lines: 32
  16.  
  17. Forwarded from the Mars Observer Project
  18.  
  19.                      MARS OBSERVER STATUS REPORT
  20.                           January 26, 1993
  21.                             1:00 PM PST
  22.  
  23. Flight Sequence C6 B is active.  Magnetometer/Electron Reflectometer and
  24. Gamma Ray Spectrometer are taking data.
  25.  
  26. Digital Tape Recorder 1 is being played back today, with DTR3 playback
  27. scheduled for tomorrow.  DTRs 1 and 3 contain the Geotail measurement
  28. data collected in December.
  29.  
  30. The Spacecraft Team reports that the spacecraft is performing nominally
  31. in Array Normal Spin.  Uplink and downlink are via the HGA (High Gain
  32. Antenna); uplink is at 125 bps; the downlink rate is at the
  33. 4 kilobits/second Science and Engineering data rate, with an approximate
  34. 2 hour telecom configuration at the 85 K rate planned between 1:00 PM and
  35. 3:30 PM today, after which downlink will be returned to 4K.
  36.  
  37. Flight sequence C7 is being updated with final TCM-2 (Trajectory
  38. Correction Maneuver #2) parameters as developed by the Navigation and
  39. Spacecraft teams.  TCM-2 will provide a velocity change of approximately
  40. 10 meters/second.  Uplink of C7 is scheduled for February 6 with sequence
  41. activation and the maneuver to take place on February 8.
  42.      ___    _____     ___
  43.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  44.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  45.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Every once in a while,
  46. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | try pushing your luck.
  47. |_____|/  |_|/       |_____|/                     |
  48.  
  49.