  1. #2671
  2. @001 Enter the name of the OWNER:
  3. ~Enter the full name of all the owners of the property. 
  4. ~If the contracting job is being done on behalf of a tenant
  5. ~enter the name of the tenant instead.
  6. @002 Enter the name of the CONTRACTOR:
  7. ~Enter the full name of the contractor.
  8. @100 Enter the description of the work to be performed:
  9. ~Enter a full and complete description of the work to be
  10. ~performed. This should include if at all possible drawings.
  11. @101 Enter estimated completion schedule:
  12. ~Enter the schedule for the work to be performed. 
  13. !102 Enter the contract price:
  14. ~Specify the full price for the job in numerals. Do not
  15. ~use the "$" sign or commas. For example: 5000.00 is a valid
  16. ~entry.
  17. #2672 Do you want to specify materials to be used?
  18. ~Enter the description of the type of materials to be used.
  19. ~This should include brand names. General descriptions like 
  20. ~"first class" are not useful.
  21. #if#2672
  22. @300 Enter type of materials to be specified:
  23. ~Enter the materials for which a detailed specification will
  24. ~be provided by type. For example: roofing shingles. The next
  25. ~choice will allow the exact specifications to be entered.
  26. @301 Enter specifications:
  27. ~Enter the brand name and models to be used.
  28. #endif
  29. #2673 Will the contractor pay for permits?
  30. ~Select yes if the contractor has included the costs of the
  31. ~permits in the contract price, no otherwise.
  32. #2674 Will contractor be required to provide proof of insurance?
  33. ~All reputable contractors have insurance and are willing to
  34. ~provide proof of insurance.
  35. #if#2674
  36. !103 Enter insurance limits required (in numerals):
  37. ~Enter in numerals, without the "$" sign or commas the amount
  38. ~of insurance that the contractor must carry.
  39. #endif
  40. #2675/#2676/#2677 Draws will be based on:
  41. ~We provide three choices for the payment schedule.
  42. 1/3 Rough in;1/3 inspection;1/6;1/6
  43. Weekly draw on per centage of completion
  44. Joint checks on materials; 1/3;1/3- 1/6,1/6 on labor
  45. #2678 Is contractor required to remove trash?
  46. ~Contracts vary as to whether the contractor removes the
  47. ~construction debris or the owner does so. Select the proper
  48. ~choice.
  49. #2679
  50. #end control section
  51. #2671
  52. /* Para. 2671: Contract for remodeling, large */
  53.  
  54.  
  55.                       CONTRACTING AGREEMENT
  56.  
  57.  
  58.  
  59. @001, referred to as OWNER, and @002, referred to as CONTRACTOR, 
  60. agree as follows:
  61.  
  62.  
  63.  
  64. CONTRACTOR shall perform the following services for OWNER:
  65.  
  66.  
  67. @100
  68.  
  69.  
  70. on the following estimated schedule:
  71.  
  72.  
  73.  
  74. @101
  75.  
  76.  
  77.  
  78. for the following price: $ @102 (!102 dollars)
  79.  
  80.  
  81.  
  82. Contractor shall be responsible for the following in addition to 
  83. the workman like performance of the work stated above:
  84.  
  85.  
  86. #2672
  87. /* Para 2672: Spec of materials */
  88.  
  89.  
  90. The materials used for the following areas:
  91.  
  92.  
  93. @300
  94.  
  95.  
  96. shall meet the following respective specifications, or be 
  97. equivalent to the following manufacturer's product lines 
  98. described:
  99.  
  100.  
  101. @301
  102.  
  103.  
  104.  
  105. #2673
  106. /* Para 2673: Permits */
  107.  
  108.  
  109. Provision of all permits required for the services to be performed 
  110. above.
  111.  
  112.  
  113. #2674
  114. /* Para 2674: Insurance*/
  115.  
  116.  
  117. Provision of worker's compensation insurance, general liability 
  118. insurance in a minimum amount of $ @103 (!103 dollars).   
  119.  
  120.  
  121. #2675
  122. /* Para. 2675: Draw sked */
  123.  
  124.  
  125. The stipulated contract price shall be paid as follows:
  126.  
  127.  
  128. 1/3 on rough in; 1/3 on first inspection and 1/6 on final
  129. inspection and 1/6 on final inspection and completion of all
  130. appearance/punch list in items.
  131.  
  132.  
  133.  
  134. #2676
  135. /* Para. 2676: Weekly draw based on per centage of completion*/
  136.  
  137.  
  138.  
  139. The stipulated contract price shall be paid as follows:
  140.  
  141.  
  142. A weekly draw based upon per centage of completion, less a
  143. retainage of 10% per cent, which shall be paid on final
  144. inspection and completion of appearance/punch list items.
  145.  
  146.  
  147.  
  148. #2677
  149. /* Para. 2677: Bills for materials */
  150.  
  151.  
  152. The stipulated contract price shall be paid as follows:
  153.  
  154.  
  155. When bona fide bills for materials are presented the same shall
  156. be paid directly by the OWNER within the terms provided. Labor
  157. shall be paid as follows:
  158.  
  159.  
  160. 1/3 on rough in; 1/3 on inspection; 1/6 on completion; 1/6 on
  161. final inspection and completion of appearance/punch list items.
  162.  
  163.  
  164. #2678
  165. /* Para. 2678: Removal of trash */
  166.  
  167.  
  168. The CONTRACTOR shall daily remove all trash and debris from the
  169. premises.
  170.  
  171.  
  172.  
  173. #2679
  174. /* Para. 2679--- closer */
  175.  
  176.  
  177. This is the entire agreement between the parties and this 
  178. agreement may only be altered in writing.
  179.  
  180.  
  181.  
  182.  
  183.  
  184.  
  185. Dated: _________________________
  186.  
  187.  
  188.  
  189.  
  190.  
  191.  
  192.  
  193.  
  194. ____________________________________________________
  195.  
  196. @001
  197.  
  198.  
  199.  
  200.  
  201.  
  202.  
  203.  
  204. ____________________________________________________
  205.  
  206. @002
  207.  
  208.