home *** CD-ROM | disk | FTP | other *** search
/ ftp.msan.hr / ftp.msan.hr.tar / ftp.msan.hr / Drivers / HP / Server / ml150g2supportCD.nrg / Utility / Tools / ml150winasm-2.12.00build811-1.exe / data1.cab / _37935C6F11C74BE4B3E65618195F5F9B < prev    next >
Text File  |  2004-07-16  |  4KB  |  87 lines

  1. <!doctype html public "-//w3c//dtd html 4.0 transitional//en">
  2. <html>
  3. <head>
  4.  
  5. <meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1">
  6.  <meta name="keywords" content="verify, schedule, scheduling, scheduling verification, scheduling a verification">
  7.  
  8. <title>Verifying logical devices</title>
  9.  
  10. <base target="_top">
  11. <link rel="stylesheet" href="basicpg.css">
  12. </head>
  13. <body text="#000000" bgcolor="#FFFFFF" link="#0000FF" vlink="#333399" alink="#0000FF">
  14.  
  15. <h1><img src="images/l_logdr.gif" width="28" height="28" alt="Logical device"> Verifying
  16.   logical devices</h1>
  17.  
  18. <p>Use this action to check redundant logical devices for inconsistent or bad data.
  19.   Verification is similar to <a href="csynchld.htm">Verify with fix</a>, except
  20.   that the Adaptec Storage Manager does not repair the drive if bad data is found.</p>
  21. <p> Verification can be a lengthy operation. You cannot perform any other actions
  22.   on the controller until the verification is completed. You can verify the logical
  23.   drive immediately or schedule it for another time. You can also schedule the
  24.   verification as a recurring task. A recurring task starts at the initial start
  25.   time, then runs periodically according to the given interval: the same time
  26.   each day, the same time each week, or the same time each month.</p>
  27. <p><IMG height=17 src="images/note.gif" width=15><B> Note:</B> You cannot perform
  28.   any other actions on the controller until the verification is completed. For
  29.   example, you cannot schedule a verification if another logical device verification
  30.   is in progress.</p>
  31. <h2>An example</h2>
  32. <p>You schedule a verification task with an initial start time of Sunday, December
  33.   21, 2003 at 2:00 AM. It recurs weekly. It will run again on Sunday December
  34.   28, 2003 at 2:00 AM.</p>
  35. <p><img src="images/note.gif" width="15" height="17"><b> Note:</b> Do not turn
  36.   off the %SERVER% while verification is in progress.</p>
  37. <p>To verify a logical device: </p>
  38. <ol>
  39.   <li>In the <a href="cusegui4.htm">Logical devices view</a>, click <img src="images/s_logdr1.gif" width="28" height="20" alt="Logical device">
  40.     (logical drive).<br>
  41.     <br>
  42.   </li>
  43.   <li> Right-click <b>Verify</b>. <br>
  44.     <br>
  45.   </li>
  46.   <li>Click <b>Yes</b> to verify the logical device immediately (now). The Adaptec Storage Manager
  47.     displays <img src="images/buildnew.gif" width="28" height="20">(in animation)
  48.     in the Logical devices view, indicating that the operation is in progress.<br>
  49.     <br>
  50.   </li>
  51.   <li>Or click <strong>Schedule</strong> to schedule the verification for a later
  52.     date and time. The Adaptec Storage Manager displays the Scheduler pane:<br>
  53.     <ul>
  54.       <li>From the drop-down lists and calendar display, select the day, month,
  55.         year, and time you want the task performed.<br>
  56.       </li>
  57.       <li>From the Recurring drop-down list, select the interval at which you
  58.         want the task to recur: Never, Daily, Weekly, Monthly. <br>
  59.       </li>
  60.       <li>Click <strong>OK</strong> to schedule the task; click <strong>Cancel</strong>
  61.         to cancel the scheduled task and return to the initial confirmation pane.
  62.         <br>
  63.       </li>
  64.     </ul>
  65.   </li>
  66. </ol>
  67. <h2>More information</h2>
  68.  
  69. <ul>
  70.   <li><a href="csynchld.htm">Understanding logical-drive verification</a></li>
  71.   <li><a href="ctskschd.htm">Understanding scheduled tasks</a></li>
  72.   <li><a href="mtskmain.htm">Using the Task Manager</a></li>
  73. </ul>
  74.  
  75. <div align="center">
  76.   <hr>
  77.   <a href="gportal.htm">Glossary</a> | <a href="menutoc.htm">Contents</a></div>
  78. <p> </p>
  79. <p align="right">x-0373-ASM-00-08-EN </p>
  80.  
  81. </body>
  82.  
  83.  
  84.  
  85.  
  86. </html>
  87.