home *** CD-ROM | disk | FTP | other *** search
/ TAP YIPL / TAP_and_YIPL_Collection_CD.iso / PHREAK / GENERAL / MLT.TXT < prev    next >
Text File  |  1999-10-09  |  15KB  |  255 lines

  1.  
  2.                              MLT Test Sequence:
  3.                        Interpretation of MLT Test Results
  4.                                by Don McCarty
  5.              (This column first appeared in Outside Plant Magazine May 1998)
  6.  
  7. We receive many questions on the operation of the MLT machine when the field
  8. technician is staring at his access unit reading the words "Still Processing."
  9. We hope a review of the test sequence will help. Remember that the MLT takes a
  10. snapshot in time and gives the results. Also, MLT can be fooled. "Test OK" means
  11. that of the tests the MLT makes, those tests passed. It does not mean that there
  12. is no problem with the circuit.
  13. For you good folks who do not have computerized testing, there are some fine
  14. units out there. The ability of the field technician to do single ended testing
  15. justifies the cost of the equipment. Technicians can access the system to send
  16. tone, short the pair, open the pair, and so on. This eliminates the need for a
  17. second technician in the central office.
  18. MLT cannot test loop current, loss, circuit noise, power influence, slope,
  19. station ground, or circuit design. If there is a series resistance fault close
  20. to the customer, MLT will test OK even though the customer hears static.
  21. For those of you who do not use MLT, bear with me. We'll cover other CO test
  22. units at a later date.
  23. Following is the 19-step test sequence that takes place when someone requests a
  24. "Full Test" from the MLT system. I'll go over individual sequences in future
  25. columns.
  26. MLT Test Procedures
  27.     MLT makes decisions by comparing the present values on a circuit to ones
  28.     that it already knows about.
  29.     MLT is programmed with a list of DC and AC values that correspond to certain
  30.     line conditions. For example, the list specifies what a short looks like in
  31.     terms of DC resistance and what a POTS telephone set looks like in terms of
  32.     AC Resistance.
  33.     MLT "communicates" with the LMOSdatabase to get customer line records.
  34.     The user types the telephone number on the "Customer Request" portion of the
  35.     mask and "sends" that information.
  36.     MLT goes to the LMOS database to retrieve the customer line records. The
  37.     information MLT retrieves includes type of service, type of equipment and
  38.     central office switch.
  39. Once the line record information has been retrieved, MLT tests the line,
  40. interprets the test results and presents the interpretation via a VER Code.
  41. When anyone requests a full series of tests on a line, MLT begins testing in a
  42. particular sequence. MLT makes decisions about what to do next by comparing the
  43. results it gets with what it expects to see. For example, MLT expects a standard
  44. POTS line to have a certain AC resistance. If the line has the correct values,
  45. it decides there are no AC problems and moves onto the next test in sequence.
  46. However, if the values do not match, MLT determines there is a problem and moves
  47. to a different sequence of tests.
  48. This will be easier to understand as we look at the sequence of tests that MLT
  49. performs on a circuit.
  50.  
  51. For you good folks who do not have computerized testing, there are some fine
  52. units out there. The ability of the field technician to do single-ended testing
  53. justifies the cost of the equipment.
  54.  
  55. Test Sequence
  56. To begin, MLT connects a test trunk to a line and begins the following series of
  57. tests.
  58. 1. Access Test:Checks for high voltage on the line.
  59. If: Hazardous voltage is present,
  60. Decision: MLT drops access and stops testing.
  61. If: OK, goes on to next test.
  62. There are three basic causes of hazardous potential on a circuit:
  63.     Someone may be calling the customer at the time of the test. MLT does not
  64.     differentiate between the 105 volts of AC ringing current from the central
  65.     office and high voltage. VER 13, Hazardous Potential will be displayed. When
  66.     re-testing, if a good test is displayed, this was probably the cause of the
  67.     initial VER 13.
  68.     The customer may be fed by "C" rural wire, an unshielded wire used in rural
  69.     areas. This wire, because of its close proximity to power lines, may carry a
  70.     high AC potential.
  71.     There could be hazardous voltage entering the circuit from the customer's
  72.     premises.
  73. After re-test, if VER 13 continues to be displayed, a call to the Maintenance
  74. Center may be appropriate to advise a supervisor before you visit the customer's
  75. network interface. That way, if you are gone for too long, at least we know
  76. where to find the body.
  77. Remember:Use all safety equipment (voltage tester, rubber gloves, etc.) until
  78. you are satisfied that there is no hazardous voltage present at the network
  79. interface.
  80.  
  81. 2. Busy Line:Checks to see if the line is busy.
  82. If: Line is busy.
  83. Decision: MLT drops access.
  84. If: OK, not busy, MLT goes on to the next test.
  85. 3. Foreign Electromotive Force Test (FEMF): Checks for high voltage (not
  86. hazardous).
  87. If: Voltage exceeds certain level.
  88. Decision: MLT stops testing but stays connected to the line.
  89. If: OK, MLT goes on to the next test.
  90. MLT stops testing if voltage is over a certain level because high voltage will
  91. adversely affect the results of let er tests.
  92. 4. Line in Use:Checks for off-hook signature (each switch has a different
  93. off-hook signature).
  94. If: Off hook, MLT checks for conversations. If there is conversation,
  95. Decision: MLT drops access.
  96. If: OK (no conversation), MLT goes on to next test.
  97. 5. ROH: The ROH test distinguishes between a hard short and an off hook
  98. condition. MLT puts current on the line and waits for a signal that the current
  99. has passed through the telephone or other CPE. If there is a short, there is no
  100. signal. If the signal comes, MLT determines the receiver is off hook.
  101. If: Off-hook.
  102. Decision: MLT stops testing.
  103. If: OK (on-hook), MLT goes on to next text.
  104. 6. Intercept Test Intercept lines, lines that are purposely put out of service,
  105. have a distinctive signature.
  106. If: On intercept.
  107. Decision: MLT stops testing.
  108. If: OK (not on intercept), MLT goes on to next test.
  109. 7. DC Test MLT removes the line circuit from the line to measure DC resistance,
  110. short, and ring to tip ground.
  111. If: The fault is very low resistance, 3 K Ohms DC resistance on any one of the
  112. three sides, T-R T-G, R-G,
  113. Decision: MLT stops testing.
  114. If: OK or fault identified but not "very low resistance," MLT goes on to next
  115. test.
  116. 8. Voltage:DC voltage values are used to identify and cross to a work ing pair.
  117. There should be no voltage on a good line.
  118. If: Hard battery, 48 volts or more,
  119. Decision: MLT stops testing.
  120. If: OK or fault identified but not "very hard," MLT goes on to next test.
  121. 9. PBX Identification:DC resistance tests are also used to validate non POTS
  122. telephone signatures. MLT compares DC values it measures to those it expects to
  123. see via the LMOS line record. A PBX, for example, will have a value similar to
  124. the following:
  125.             K Ohms   Volts
  126.               100             T-R
  127.               12              T-G
  128.               400             R-G
  129.  
  130. When MLT measures these values and the line records indicate the presence of a
  131. PBX, MLT test results will show a valid PBX signature.
  132. If: Valid PBX signature,
  133. Decision: MLT stop testing. MLT does not do AC, Longitudinal Balance,
  134. Thermistor, or Open tests since the presence of a PBX on the line leads to
  135. inaccurate results from these tests.
  136. If: No PBX signature, MLT goes on to next test.
  137. 10. AC Signature:AC resistance is used to identify POTS and other terminations.
  138. The T-R value for a standard ringer is between 8 and 18 K Ohms. The T-G and R-G
  139. values are greater than 25 Ohms and are about equal.
  140. If: High AC resistance value (does not see a valid signature),
  141. Decision: MLT does an open test.
  142. If: Valid AC signature, MLT goes on to next test.
  143. 11. Longitudinal Balance Test:Measures how likely it is that the line is noisy.
  144. This test is performed only if a termination is seen and the line is unbalanced.
  145. The results are expressed in decibels (dB). If the balance is less than 40 dB,
  146. the line is probably very noisy. If the balance is above 60 dB, there should be
  147. no noise problem.
  148. Decision: MLT gives test results and goes on to next test.
  149. 12. Thermistor Test:Checks for the presence of a thermistor on the line. A
  150. thermistor is a resistor that is part of some PBX and key systems telephones. A
  151. thermistor test is done if the line records indicate that there should be a
  152. thermistor on the line.
  153. Decision: MLT gives test results and goes on to next test.
  154. 13. Open:AC capacitance is used to measure and analyze the location and type of
  155. open on a line. When MLT determines a line is open, based on results from the DC
  156. tests, AC signature test or thermistor test, it does an open test to determine
  157. if the open is in or out of the central of fice If the length of wire (tip or
  158. ring or both) is ''short" (less than 350 feet), the open may be in the central
  159. office. If the length of the wire is "longer," the open is out of the central of
  160. fice In the case of an open out, MLT also gives the distance in feet from the
  161. central office to the open.
  162. Decision: MLT gives test results and goes on the next test.
  163. 14. Capacitive Balance Measurement:MLT uses AC capacitance to compare the
  164. capacitance (length) of the tip wire to the capacitance (length) of the ring
  165. wire. For a good pair, the length of the wire is equal and the balance
  166. percentage is 100%. In this case, the MLT test result will be:
  167. Balance: Cap 100%
  168. This means that both sides of the loop are open at the same place. However, when
  169. the lengths are not equal (one wire is shorter than the other), more than likely
  170. the shorter wire is open. MLT determines which side is shorter and reports
  171. either "open tip" or "open ring."
  172. Decision: MLT gives test results and goes on to next test.
  173. 15. Line Circuit Test:This test checks for the proper arrangement of the battery
  174. and ground in the central office line circuit. The line circuit is the equipment
  175. that:
  176.     provides battery to the loop
  177.     detects the phone is taken off-hook
  178.     provides dial tone
  179.     connects the loop to the switching equipment
  180.     accepts dialed digits and switches the call to its destination.
  181. All of the tests described so far are conducted without the line circuit
  182. (battery and ground) present. Remember that MLT removes the line circuit at the
  183. start of the DC tests so that all the tests are made without the line circuit.
  184. At this point in the test sequence, MLT reconnects the line circuit to the loop.
  185. MLT expects to see 51 volts of battery on the ring side and central office
  186. ground on the tip side. If this is the case, MLT test results show the
  187. following:
  188. Central Office: LINE CKT OK
  189. If battery and ground are not present, MLT test results show "open in."
  190. Central Office: OPEN IN
  191. 16. Draw and Break Dial Tone:MLT simulates a telephone going off-hook and checks
  192. for the presence or absence of dial tone. Then it removes the simulated off-hook
  193. condition to ensure the dial tone breaks or stops.
  194. 17. Soak Test: The soak test measures DC resistance over time to determine if a
  195. fault is swinging. The term "swinging" comes from testing a circuit with a
  196. meter. When either the tip, ring, or both tip and ring wires have DC faults due
  197. to moisture, the meter needle jitters or moves slightly as the moisture affects
  198. the intensity of ground on the wire. Thus, when a ground is swinging, it means
  199. that moisture is present and is affecting the fault.
  200. 18. Ringer Test:This test determines the number of ringers on a line and whether
  201. the results are consistent with the line records.
  202. 19. Length of Loop Measurement:This test is the last performed in the series. It
  203. uses AC capacitance to measure the length of a good pair. It functions similar
  204. to the open test and reports the distance from the central office to the
  205. telephone. This test is run only on single-party POTS lines that have already
  206. been determined to be "test OK."
  207. All of the above tests, 1 through 19, are part of the full series MLT tests.
  208. Most MLT test requests run through all or some of these tests.
  209. Additional MLT Tests
  210. There are other MLT tests that are more specialized, requiring interaction with
  211. the customer. Let's take a look at these tests.
  212. Touch-Tone Test:This test checks the condition of the customer's touch-tone pad
  213. by analyzing the tones that are produced when the customer presses the buttons
  214. on the pad. MLT checks the tones and returns a signal to indicate whether the
  215. pad is good or not. This test is run whenever you suspect a problem with the
  216. touch-tone pad. For example, when the customer complains of getting wrong
  217. numbers.
  218. Coin Tests:There are two coin tests that check two primary mechanisms in the
  219. coin set: the totalizer and the coin relay. The totalizercounts the coins a
  220. customer puts in. The totalizer must be in a certain starting position when the
  221. coins are dropped into the phone. When the totalizer is in the correct position,
  222. it is said to be "homed." Each coin deposited causes the totalizer to send tones
  223. to the central office When the central office hears enough of the required
  224. tones, the customer is allowed to make a call.
  225. When a coin test is run, MLT looks for a short. If there is a short, MLT
  226. suspects the totalizer is not "homed" and attempts to "home" it. If MLT does not
  227. find a short, it checks the coin relay.
  228. The coin relay is the mechanism that returns or collects the coins deposited by
  229. the customer. The relay sends the coins to either the coin box or the return
  230. slot. If MLT sees a T-G fault, it suspects a problem with the relay. MLT
  231. attempts to operate the relay, measures the relay's timing and measures how much
  232. current was needed to operate the relay.
  233. Signing Off
  234. Most field technicians do not use MLT to its fullest capabilities. Learn the MLT
  235. test sequence, learn how to interpret the tests, and use the VER codes that
  236. accompany the tests. Your job will be easier in the field.
  237.  
  238. Let's Talk
  239. We have received a tremendous response from our readers about our free monthly
  240. newsletter.. We are I diligently working on it and the first) issue will be out
  241. soon. If you are I interested in the newsletter, call or e-mail us.
  242. I appreciate hearing from you with questions or comments on any topic that you
  243. think is of general interest to outside plant technicians and mangers. And, as
  244. always, I look forward to talking with experts in the field. That expert may be
  245. one damn good field technician whom you respect. So please call (408) 341-8990,
  246. e-mail dmccarty@mccartyinc.com, or send a fax (408) 341-8970 to me. (Our web
  247. site is in development and should be completed soon, so keep watch at:
  248. www.mccartyinc.com.)
  249.  
  250. Donald E. McCarty is president of McCarty & Associates, Inc., an international
  251. consulting firm offering classroom, on-site and field training courses in
  252. outside plant cable and fault locating. For more information on McCarty &
  253. Associates training seminars, please call (408) 341-8990.
  254.  
  255.