  1. Arkwright (44 MW nominal)
  2. * this is a QUEST configuration file
  3. 2 one HP and one IP turbine, w/o reheat
  4. * Tb    Pb      Fb     BP
  5.  880.  856.   381556. 1.00
  6. *HP turbine stages
  7.  3
  8. *HP turbine type
  9.  1
  10. *HP turbine generator connection
  11.  1
  12. *HP turbine flow factor(s)
  13.  482.5
  14.  259.1
  15.   86.40
  16. *HPT throttle leak to SSR
  17.       0.
  18. *HPT HP seal leak to SSR
  19.       0.
  20. *HPT HP seal leak to open feedwater heater
  21.       0.
  22. *HPT HP seal leak to HPT exit/reheater inlet
  23.       0.
  24. *HPT LP seal leak to open feedwater heater
  25.       0.
  26. *HPT LP seal leak to SSR
  27.     600.
  28. *cross-over pressure drop factor
  29.   45.00
  30. *IP turbine stages
  31.  2
  32. *IP turbine type
  33.  5
  34. *IP turbine generator connection
  35.  1
  36. *IP turbine flow factor(s)
  37.   26.14
  38. *IPT LP seal leak to open feedwater heater
  39.       0.
  40. *IPT LP seal leak to SSR
  41.       0.
  42. *last stage annulus area in square feet (single flow)
  43.   26.20
  44. *number of annuli
  45.  2
  46. *FP turbine stages
  47.  0
  48. *generator 1 type
  49. 1 3600-rpm conventionally cooled
  50. *generator 1 rated KVA
  51.    45000.
  52. *makeup flow
  53.  -13107.
  54. *makeup injection
  55. D=deaerator
  56. *boiler pressure drop and efficiency
  57. 15.0  88.5
  58. *heat exchanger type, TTD, DCA, shell pressure drop
  59. * type 1: no drain inlet, type 2: drain inlet, type 3: open
  60. *type  TTD  DCA   DP
  61.    1   5.0   .0  5.0
  62.    3    .0   .0  5.0
  63.    1   2.8   .0  5.0
  64.    2   5.0   .0  5.0
  65. NO, last heat exchanger before GSC does not drain to condenser
  66. *boiler feedpump efficiency
  67.  85.0
  68. *SSR flow to GSC
  69.     600.
  70. *SSR flow to condenser
  71.       0.
  72. *service load (+KW or -%)
  73.     -5.00
  74.