home *** CD-ROM | disk | FTP | other *** search
/ Unix System Administration Handbook 1997 October / usah_oct97.iso / rfc / 100s / rfc131.txt < prev    next >
Text File  |  1997-04-17  |  5KB  |  166 lines

  1.  
  2.  
  3.  
  4.  
  5.  
  6.  
  7. Network Working Group                                  E. Harslem - Rand
  8. Request For Comments: 131                              J. Heafner - Rand
  9.                                                               April 1971
  10.  
  11.  
  12.                  Response to RFC #116 (May NWG Meeting)
  13.  
  14. Phase One
  15.  
  16. Software Status of 360/65
  17.  
  18.      1) Our software is currently being changed to reflect the new NCP
  19. protocol delineated in RFC #107.  These changes will be completed
  20. before the end of May.
  21.  
  22.      2) We are implementing a logger that, after an automatic ICP
  23. dialog, can be driven from a local console.  Any desirable messages
  24. can be sent or received in EBCDIC, ASCII (8), or as binary streams.
  25. The purpose of the logger is to allow sites to checkout remote log in
  26. procedures.  Since no production-oriented services will be offered on
  27. the 360/65, the logger is for experimental purposes only.  It will be
  28. completed before the end of May.
  29.  
  30.      3) We have not planned a TELNET. We will, however, implement both
  31. server and user TELNETs once a specification is generally accepted.
  32. Implementation time will be on the order of two weeks.
  33.  
  34. Transition from 360/65 to PDP-10
  35.  
  36.      1) We plan to move from our 360/65 to a PDP-10.  Rand will offer
  37. Network services on the PDP-10.  The hardware and software status of
  38. the PDP-10 will be reported later.
  39.  
  40.      2) The 360/65 Network connection will remain for some time due to
  41. its production use by another ARPA-sponsored project at Rand.
  42. Maintenance of the 360/65 Network software will be provided for the
  43. lifetime of the connection but no new programs will be developed on
  44. the 360/65 after September.
  45.  
  46.  
  47.  
  48.  
  49.  
  50.  
  51.  
  52.  
  53.  
  54.  
  55.  
  56.  
  57.  
  58.                                                                 [Page 1]
  59.  
  60. Network Related Activities
  61.  
  62.      1) The UCSB/Rand Network activities were recently reported in RFC
  63. #113 and earlier in RFC #78.  The Climate Dynamics Project (CDP) at
  64. Rand will continue to use this facility (more heavily) in the future.
  65.  
  66.      2) In conjunction with the above facility, the Rand Network team
  67. has planned and implemented a front-end graphics program to allow the
  68. reduced data from UCSB to be displayed and interacted with locally as
  69. graphs, contours, plots, and lists.  This will be used in about three
  70. months after an intermediate program, being written by the CDP
  71. personnel, is completed.
  72.  
  73. Phase Two
  74.  
  75. Experimental Data Reconfiguration Service (Form Machine)
  76.  
  77.      1) A working session was held recently at Rand on the Data
  78. reconfiguration Service (DRS), the results of which have been drafted
  79. and are being edited by the participants.  These data will be
  80. published soon as an RFC.  Eric Harslem will be prepared to make an
  81. oral report at the NWG meeting on the DRS.
  82.  
  83. Protocol Manager
  84.  
  85.      1) We plan to submit a positional paper on a proposed Protocol
  86. Manager, which will allow flexibility in both experimental and
  87. production use of connection protocols.  This will be presented as a
  88. Request for Comments on a software package that Rand intends to
  89. implement for its use on the PDP-10.  For example, it should obviate a
  90. fixed logger on our forthcoming PDP-10.
  91.  
  92.  
  93.  
  94.  
  95.  
  96.  
  97.  
  98.  
  99.  
  100.  
  101.  
  102.  
  103.  
  104.  
  105.  
  106.  
  107.  
  108.  
  109.  
  110.  
  111.                                                                 [Page 2]
  112.  
  113. Phase Three
  114.  
  115. Comments on Goals and Organization of the NWG
  116.  
  117.      1) We have been proponents of the collective NWG as a forum to
  118. raise issues and as a general information transfer mechanism of what
  119. sites are doing and thinking.  More recently small working groups and
  120. committees have been formed to generate particular specifications such
  121. as TELNET, the new NCP protocol, etc.  We favor continuance of these
  122. methods as long as any site with a willingness, an interest, and
  123. contribution is not excluded from any group or committee.  We feel
  124. that these groups will limit themselves to a small functional size a
  125. priori because they are directed toward special interests.
  126.  
  127.      The long lead time between the formation of such a group and
  128. their final output (and subsequent implementation of the plan) has
  129. been accepted by the NWG Technical Chairman and is rather
  130. disconcerting.  The NCP glitch cleaning committee is an example of
  131. expedient work. UTAH, for example, has already implemented the new NCP
  132. protocol.  Other groups (including the DRS) have not been as
  133. responsive.  Perhaps the technical problems addressed by other groups
  134. are more complex and the needs for their solutions are not as
  135. immediate as the NCP glitches.  We offer no nice solution except that
  136. perhaps some guidelines should be established concerning timely
  137. publication of reports.
  138.  
  139.      2) Regarding long range goals of the NWG, we do not think that
  140. the NWG is the right body to establish the long range goals.  By long
  141. range goals of the NWG, we are really concerned (in part) with long
  142. range goals of the Network.  We feel that the Principal Investigators
  143. are in a position to have a better perspective of long range Network
  144. goals than the NWG members.  As a suggestion, one way of converting
  145. their views into NWG tasks is to have the NWG Technical Chairman host
  146. a one day opinion session of the Principal Investigators, then report
  147. these views to the NWG for the generation of their implied tasks.
  148.  
  149.  
  150.        [ This RFC was put into machine readable form for entry ]
  151.          [ into the online RFC archives by Jim Thompson 4/97 ]
  152.  
  153.  
  154.  
  155.  
  156.  
  157.  
  158.  
  159.  
  160.  
  161.  
  162.  
  163.  
  164.                                                                 [Page 3]
  165.  
  166.