home *** CD-ROM | disk | FTP | other *** search
/ Developer Source 3 / Developers_Source_Vol_03_1996.iso / dobbs / dec94 / ferr1t1.gif < prev    next >
Graphics Interchange Format  |  1996-01-17  |  33.2 KB  |  555x137  |  8-bit (122 colors)
   ocr: Algorithm Type: Schedulability Test Comment Rate monotonic (RM) Static Total load under limit defined Stable by algorithm task model. Meating of first deadline. Earliest deadline (EDF) Oynamic Total load under 100% Least number of context switches Least laxity (LLF) Dynamic Total load under 100% Early detection of timing failures Maximum urgency first (MUF) Mixed Critical load under 100% Stable; 100% schedule bound Table 1: Summary OfRM, EDF, LLF, and MUF scheduling algorithms.