home *** CD-ROM | disk | FTP | other *** search
- SystemX Test Access Connection
- Customer Line Testing on Digital
- Exchanges. hybrid <hybrid@f41th.com> _\'/_gBH
- =============================================
-
-
- To allow testing of subscriber's lines, each subcriber has a Test Access
- relay in their SLU. The Test Access relay can connect the subs line to a
- 4-wire testng circuit called a "Test Common Highway." This arrangment is
- shown bellow.
-
-
- SLU Line Controller
- __________________________________________________ _________
- ___ | .______________._________________________|__| |_
- | # | | | | || 2 wires | | .... |
- |___|---|------O // TA1 // TA2 | |__:__:___|
- subs | O O | | |
- | | | .________|_____| |
- | | | | |::::::::|:::::
- | | | | | Switch |
- | | | ____|____ | Plane >|--->>
- | / 2 wires / 2 wires |_________| | |
- | | | | TA2 | From the
- | | | | | Module |
- | | | | | Controller
- | | | O -50v |
- |_________|______________|_________________________|
- | |
- | Test | Test The Test Access Relay
- | Line | Exchange =====================
- :::::::::::::::::::::::::
- Test Common Highway
-
-
- The MC can send an instruction via the Line Controller to operate Test
- Access relay (TA) in the SLU. With TA operated, the subscriber's line can
- be tested via the Test Line Pair of the Test Common Highway an contact
- TA1. The subscriber's line circuit can be tested via the Test Exchange
- pair of the Test Common Highway an contact TA2. If "Test Line" is connected
- to "Test Exchange" is is possible to monitor calls. The "Test Line" and
- "Test Exchange" pairs together comprise 1 Test Common Highway.
-
- The P-SWITCH
- ============
-
- Following the Test Common Highway back from the SLU, we find it is
- connected to a piece of equipment called the P-SWITCH. The P-Switch is
- located in the Auxiliary Module and has 12 Test Common highways (Numbered
- 0 to 11) connected to it. 11 are availiable for connection to SLU's and 1
- for the connection to Per Line Auxiliarys (PLA's). For design reasons,
- there cannot be more than 24 SLU's connected to each Test Common Highway.
- Because there are a maximum number of 8 subs per SLU, the maximum number
- of subs that can be connected to 1 Test Common Highway is 24x8= 192 subs.
- This means that 11 Test Common Highways can handle upto 2112 subs.
- However, a Concentrator has a maximum of 2048 subs. So the Test Common
- Highway is only connected to 128 subs. The Test Access relay contacts are
- simply teed off its associated Test Common Highway as shown bellow.
-
-
- _______________________
- | _ |
- | To Test Access >> _| | 4 wires
- 24 SLU's .. | relay contacts >> _}--|---/---.
- per Test : | SLU 0 _| | |
- Common ----: |_______________________| |
- Highway : ___________:___________ / 4 wires
- : | _ | |
- : | To Test Access >> _| | | Test Access Relay
- :. | relay contacts >> _}--|-------O to Test Common
- | SLU 23 _| | | Highway Connections
- |_______________________| | ===================
- ::::::::::::::::::::::::: |
- _______________________ |
- | _ | |
- | To Test Access >> _| | | 4 wires
- 24 SLU's .. | relay contacts >> _}--|-------+---/---.
- per Test : | SLU 24 _| | | |
- Common ----: |_______________________| | |
- Highway : ___________:___________ | |
- : | _ | | |
- : | To Test Access >> _| | | |
- :. | relay contacts >> _}--|-------+-------O
- | SLU 47 _| | | |
- |_______________________| | |
- ::::::::::::::::::::::::: | / 4 wires
- ___________:___________ | |
- | : _ | | |
- Less than | To Test Access >> _| | | | 4 wires
- 24 SLU's .. | relay contacts >> _}--|-------+-------+---/---.
- on last : | SLU 255 _| | | | |
- Test ------: |_______________________| | | |
- Common : | | |
- Highway :. O O O
- TCH/0 TCH/1 TCH/11
- ::::::To the P-SWITCH::::::
-
- P-Q Links
- =========
-
- There are 12 Test Common Highway's conencted to the P-SWITCH. Connected
- between the P-Switch and the Local Exchange are up to 4, 2 wire
- input/output circuits, known as P-Q Links. These are controlled by the
- Local Exchange PUS and can be used to test either the Line or the Exchange
- side of an SLU. The way in which this is done is shown bellow.
-
-
- The P-SWITCH/P-Q Link to Test Common Highway Connection
- =======================================================
-
-
- LineSide| 2 wires | | reed relay |
- TCH/0 --------+---/-----------+---------------+---------------+------->
- >>>>> --------+---/-----------+---------------+---------------+------->
- ExchSide| 2 wires | | |
- LineSide| | | |
- TCH/1 --------+---------------+---------------+---------------+------->
- >>>>> --------+---------------+---------------+---------------+------->
- ExchSide| | | |
- LineSide| | | |
- TCH/2 --------+---------------+---------------+---------------+------->
- >>>>> --------+---------------+---------------+---------------+------->
- ExchSide| |(N) | |
- LineSide|(M) | | |
- TCH/3 --------+---------------+---------------+---------------+------->
- >>>>> --------+---------------+---------------+---------------+------->
- ExchSide| | | |
- / 2 wires / 2 wires / 2 wires / 2 wires
- | | | |
- TCH/11 --------+---------------+---------------+---------------+-------->
- >>>>>> --------+---------------+---------------+---------------+-------->
- | | | |
- | | | |
- | | | |
- (0) (1) (2) (3)
- :::::::::::::::::::::::::::::::::::::::::::::::::::
- ::::::: P-Q Links to Test Network Equipment :::::::
- :::::::::::::::::::::::::::::::::::::::::::::::::::
-
-
- The connections between the Test Common Highways and the P-Q Links are
- made by reed relays. These relays are controlled by the Auxilliary
- Controller. (The Auxilliary Controller is part of the Auxilliary Module).
- Instructions to opertate these read relays are origionated by the Test
- Network Subsystem in the Local Exchange. They are then passed via MTS to
- the Module Controller, which passes them on to the Auxilliary Controller.
-
- If the reed relay marked (M) is operated, then P-Q Link 0 will be
- connected to the line side pair of the Test Common Highway 3. This will
- enable any of the subs connected to the Test Common Highway 3 to be
- tested, simply by operating their associated Test Access relay. Similarly,
- if reed relay (N) is operated, it will connect P-Q Link 1 to the Test
- Common Highway 2, exchange side.
-
- Monitoring
- ==========
-
- If "Test Line" and "Test Exchange" are connected toghether, it is possible
- to monitor the subs line. This is achieved by operating two reed relays on
- one P-Q Link as shown bellow.
-
-
- SLU Line Controller
- _______________________________ _________
- | _________.______/._______|_____| |
- ___ | | | 2 wires | | |--------------->>
- | # | | : TA1 : TA2 | | ..... | To Switch Plane
- |___|---|---O// //O | |__:___:__| :::::::::::::::
- | | | ______|________| |
- | | | | | |
- | | | |(TA2) | |
- | | | ___|___ | |
- | / 2 wires / |_______| | |
- | | | | | |
- | | | O -50v | |::::::::::::::::::
- |___|____________|______________| ::From the Module::
- | | ::Controller:::::::
- | | :::::::::::::::::::
- | |
- : : _________________
- : : 2 wires | |
- : |______/.____________|___._____________|________
- : | : |
- | | : P-SWITCH |
- | 2 wires | / 2 wires |
- |___________________/.____________|___:_____________|________
- TA relay shown operated | : |
- |___:_____________|
- :
- Monitoring The Subscriber Line :
- ============================== :
- ::: P-Q Link to Test
- ::: Network Equipment
-
-
-
- RSC Connections SystemX/X Local RCU Exchange Remote Test Network
- ================================================================
-
- The total resistance of the test pair between the Test Equipment and the
- subscribers termination shall not exceed 2000ohms. Therefore RCU DSSS's
- can also be served from the TNS in the Main Exchange via P-SWITCH in the
- RCU and Q-SWITCH in the Main, providing the test pair does not exceed
- 2000ohmz. The prefered location of the Test Unit is to be as close as
- possible to the Test Network equipment.
-
- Exchanges built to SEP2 and SEP3 connection to RSC using Modern LTS.
- ====================================================================
-
-
- Sub <--------x ----- x --------> Exchange
- <------. | ----- | .------->
- | |_______| |
- |_____|_____| DSSS (Located at RCU)
- | |
- | |
- ____|_|_____
- | |
- | P-SWITCH |
- |____________|
- | |
- | |
- ===============|=|======================================================
- | |
- ____|_|_____
- | |
- | Q-SWITCH | MINI TNS (Located at RCU)
- | | | |
- | | | |
- -----|----O-O-----|-------------O------------------O-----
- | __|_|___ | ____|____ _______|_______
- | |Pseudo | | | | | |
- | |D/E Swt | | |R-SWITCH | | Test Network |
- |_| |_| |_________| | Controller |
- |_____::_| | | | |_______________|
- | || Built-in Line Test ___|________ |
- | || Equipment | V24 ACCESS | |
- | || |____________| |
- | || | |
- | || | |
- ===============|==||================================|==========|=========
- | || | |
- | || | |
- | Test (V24) (TNS)
- Dial-Back <<..| Pair | |
- via the main || | (MCS)
- Exchange Switch || | | Local VDT
- || | (I/O)------>>
- __||___________ | |
- | | | |
- | Test Unit LTS |____________________| |
- |_______________| |
- | ________________|
- | |
- | |
- | (MMI ACCESS)
- | |
- RCU | | MAIN EXCHANGE
- | __|__
- | | M |
- | |_____|
- | |
- | (V24 or X25)
- | |
- | |
- =======================|======================|============================
- | |
- | |
- __________|__________ __|__
- | | | M |
- | LTS PROCESSOR | |_____| OMC
- |_____________________| |
- | |________
- | |
- RSC | ________|_________
- | |MML DIRECT ACCESS |
- ________ | | : |
- || ||_________| |_O/_____|_________|
- ||______|| (Users Terminal) | |
- --oooooo-- | |
- __|__ __|__
- ________ (SystemX Terminal) | M || M |
- || ||_________ |_____||_____| _\'/_
- ||______|| | | |
- --oooooo-- | (V24) (V24)
- _|_ | __|__
- | M |________________| | M | Other Admin
- |___| |_____| Users
-
-
- Subscriber Line Test Codes
- * Determine Switch Type
- ==========================
-
-
- Exchange Type | SALT | FRB | CPI(EN) | CPI(DN) | LPI(EN) | LPI(DN)
- ==============|=======|=======|=========|=========|=========|========
- | | | | | |
- TXS |175/01 | | |838 (L4) | |
- |175/03 |839 | |836 (L5) | |
- |175 |819/174| |810/176 | |
- |185 |184 | |186 | |
- |183 |182 | |180 | |
- |82801 |88 | |80 | |
- |833802 |89 | |839 | |
- |91757 |819 | |810 | |
- | | | | | |
- ==============|=======|=======|=========|=========|=========|========
- | | | | | |
- TXD |175 | | |176 | |
- | | | | | |
- ==============|=======|=======|=========|=========|=========|========
- | | | | | |
- TXE |175 |174 |180 |176/172 |187 |188
- |188 | | |186 |188 |
- | | | | | |
- ==============|=======|=======|=========|=========|=========|========
- | | | | | |
- TXE4 |175 |174 |180 |176 |187 |188
- | | | | | |
- ==============|=======|=======|=========|=========|=========|========
- | | | | | |
- AXE10 |175 |174 | | | |
- | | | | | |
- ==============+=======+=======+=========+=========+=========+========
-
- The TXD Exchange
- ================
-
- SALT TEST
- =========
-
- Dial 175.. system will announce the Customers Number (the line you are on)
- Replace the reciever. Line Test Takes place. Possible delay of upto 30
- seconds before ringing is recieved (ringback test). If ringing recieved OK
- - if no ring fault condition announced when handset lifted. If line tests
- OK "Dial Next Test" is announced followed by interrupted dial tone.
-
- 1. DIAL TEST - Dial 1.
- ...On DialTone:
-
- Dial 1 through to 0 for Loop Disconnect
- or 1 through to 9 * 0 for MF.
-
- If OK "Testing OK" announced.
-
- 2. COIN PULSE TEST (POA Only) - Dial 3.
- ...On PayTone:
-
- Insert coins. 1 KHz tone pulse for each coin indication.
-
- 3. SPM TEST - Dial 4.
- ...Supplies 20 SPM pulses (10 long, 10 short).
- To exit SALT test, replace handset.
-
- CPI TEST
- ========
-
- Dial 176 followed by national number (eg 176 0171-313-3700)
-
- 1. LINE FREE - intersupted 1 KHz tone for 7 seconds. Trace tone applied to
- number. Timeout after 5 minutes. If the customer attempts to make a call,
- then trace tone removed and engaged tone returned to engineer. Trace Tone
- reapplied if line becomes free within 5 minutes.
-
- 2. LINE SPARE - NU Tone returned.
- 3. IDENTIFICATION OF B WIRE - Good Earth applied to B Wire returns NU Tone
- to engineer. Tone removed when earth removed.
-
-
- The AXE10 Exchange
- ==================
-
- SALT TEST
- =========
-
- Dial access code 175 from the line to be tested. When dialtone is recieved
- replace the handset. After initial checks telephone will ring, on answer
- DT recieved. Subsequent tests can be made by dialing the following order
- codes.
-
-
- ORDER CODE | TEST | DIAL | RESULT
- ============|============|===================|==========================
- 2 | insulation | replace reciever | phone rings,
- | test A-B | lift reciever | tone returned.
- ============|============|===================|==========================
- 3 | insulation | replace reciever | phone rings,
- | test to | lift reciever | tone returned.
- | earth | |
- ============|============|===================|===========================
- 4 | insulation | replace reciever | phone rings,
- | test to | lift reciever | tone returned.
- | -48v | |
- ============|============|===================|===========================
- 5 | insulation | replace reciever | phone rings,
- | test A&B | lift reciever | tone returned.
- | loop to | |
- | earth | |
- ============|============|===================|===========================
- 6 | polarity | | tone returned
- ============|============|===================|===========================
- 7 | loop | | tone returned
- | resistance | |
- ============|============|===================|===========================
- 8 | dial test | dial 0 | tone returned
- | keypad MF | dial 0 | tone returned
- | keypad | dial 123456789*0# | tone returned
- ============|============|===================|===========================
- 9 | bell test | replace reciever | phone rings
- | | lift reciever | tone returned
- ============|============|===================|===========================
- 10 | service | press button | tone returned
- | button | |
- ============|============|===================|===========================
- 11 | SPM test | | meter steps *
- ============|============|===================|===========================
- 12 | SALT EQM | | tone returned
- | test | |
- ============+============+===================+===========================
-
- * On SPM test 10 pulses are returned. After completion of each successful
- ordered test another test can be obtained by dialing another Order Code
- immediatly. Tones Returned:
-
- DT = (DIAL TONE) Test Passed
- ET = (ENGAGED TONE) Test Acceptable
- FT = (600Hz at 260Ms, 260Ms OFF, 1400Hz at 260Ms ON, 260Ms OFF) Failure.
-
-
- CPI (Cable Pair Identification)
- ===============================
-
- Speaker Circuits: Where digital (TXD) unit exists, in order to gain full
- access to CPI, it is essential that all speaker circuits be connected to
- this unit, as access to TXD is not possible from Strowger (TXS) or
- electronic (TXS) or electionic (TXE). In cases where there is a mix of TXS
- and TXE only, it would be benificial to connect the speaker circuit to
- TXS, as when the exchange is modernised, the TXS unit will be the first to
- be converted into TXD. This will eliminate the problem of having the
- speaker circuit numbers at a later date. To access CPI from TXD, in all
- cases, the full national number must be used. This facility is not
- automaticaly provided and must be requested from Data Managment.
-
- _\'/_gBH
- ping?
-
-
-
-
-