This is a Calendar for use in setting and reviewing.
schedule dates.
To move to the next Month ,press Page-Down.
To move to the previous Month, press Page-Up.
To move to the next Year, press Ctrl-Page-Down.
To move to the previous Year, press Ctrl-Page-Up.
If the date field that was highlighted was blank when
the calendar was called the the calendar will be set to
todays' date. Otherwise, the calendar will be set to
the date from the selected field.
To move to the original date, press Ctrl-Home.
To accept the highlighted date from the calendar, press Enter.
To return back with the original date, press Esc.
This is a Calendar for use in setting and reviewing non working
dates. Weekends are considered non working days already, and
don't need to be marked.
To move to the next Month ,press Page-Down.
To move to the previous Month, press Page-Up.
To move to the next Year, press Ctrl-Page-Down.
To move to the previous Year, press Ctrl-Page-Up.
Dates which have been designated as non working days will have
an entry in the date's box.
To change an entry, press Enter.
To delete an entry, press Delete while the date is highlighted.
To exit the calendar screen, press Esc.
CCALEND
TUPD_TASK
DATE FORMATS
All dates are entered in the format of MM/DD/YY.
The computer automatically places the '/' where
required.
Pressing the F3 key will bring up a calendar with the
selected date highlighted, or todays' date if the field
is blank. The date from the calendar can be entered into
this field by pressing the Enter key while the desired
date is highlighted on the calendar
Pressing the F4 key will automatically calculate the
duration using the start and end dates, skipping weekends
and days flagged in the calendar.
Pressing the F5 key will automatically calculate the end
date using the start date and duration, skipping weekends
and days flagged in the calendar
more help on: CALENDAR TASK_FORM
TTASKNUM
RRESP
PPL_EN_DT
SSTATUS
DELETE MULTIPLE TASKS
You can delete tasks with the following selection criteria:
a Range of Task numbers
a Specific Resource
a Range of Planned End Dates
a Specific Status
Once you have selected the tasks to be deleted, you will
have one LAST CHANCE to cancel, before the tasks are
PERMANENTLY deleted.
More help on: Task Number Resource Planned End Date Status
TUPD_TASK
DESCRIPTION
The description for the task can be up to 30 characters.
If more description is required, used the extended
description field.
more help on: TASK_FORM
DAYS PER INCREMENT
Enter the number of days for each increment on the
Gantt bar.
The program will print as many pages as necessary to
print the Gantt bar.
Enter 0 if you want the program to fit the Gantt bar
on one page.
TUPD_TASK
DURATION
The duration of the task is a numeric field up to 4
digits in length. The units of duration are whatever
the user chooses them to mean, unless the field is
calculated automatically using the F4 key.
Pressing the F4 key will automatically calculate the
number of working days between the start and end dates.
Pressing the F5 key will calculate the end date using
the start date and duration, ignoring weekends and dates
flagged in the calendar.
more help on: TASK_FORM
TUPD_TASK
EXTENDED DESCRIPTION
The extended description can be up to 4 rows of 60
characters each. The program automatically word wraps
at the end of the line.
more help on: TASK_FORM
FILES USED BY THE PROGRAM
The program uses or creates the following files:
TASKMAN.EXE
Main executable program
TASKMAN.HLP
Help file
Tasks data file
Tasks sort key (task number)
Tasks sort key (resource)
Tasks sort key (planned end date)
Tasks extended descriptions
RESOURCE.DAT
Resource data file
RESOURCE.K01
Resource sort key
STATUS.DAT
Status data file
STATUS.K01
Status sort key
PRNTR.DAT
Printers data file
PRNTR.K01
Printers sort key
All of the files except for TASKMAN.EXE and TASKMAN.HLP
are created in the current directory, when TASKMAN is
started. You must be in the directory that you have
existing tasks in, in order to access them.
DDEL_TASK
FILE UTILITIES
Delete Multiple Tasks - Delete multiple tasks based on selection
criteria.
Return - To Exit to main menu
More help on: Deleting
GANTT TASK LISTING
From here you can Add, Change, or Delete a task.
To shift the Gantt bar left or right use the LEFT or RIGHT
arrow keys.
To switch between the Planned bar or the Revised bar press
the F2 key.
Use the UP and DOWN arrow keys to select a Task to Change,
or Delete.
To Add a task press the Insert key.
To Change a task press the Enter key while the task is
highlighted.
To Delete a task press the Delete key while the task is
highlighted.
HIGHLIGHT TODAY
You have the option of identifying todays date with
a vertical line.
Select Yes if you want todays date highlighted.
Select No if you do not want todays date highlighted.
PRINTER LIST
From here you can Add, Change, or Delete a printer.
Use the arrow keys to select a printer to Change or Delete
To Add a printer press the Insert key.
To Change a printer press the Enter key while the printer
is highlighted.
To Delete a printer press the Delete key while the
printer is highlighted.
If this screen was called from the Print Options Screen,
pressing F2 will allow changing the printer options.
RESOURCE LIST
From here you can Add, Change, or Delete a resource.
Use the arrow keys to select a resource to Change or Delete
To Add a resource press the Insert key.
To Change a resource press the Enter key while the resource
is highlighted.
To Delete a resource press the Delete key while the
resource is highlighted.
STATUS CODES LIST
From here you can Add, Change, or Delete a status.
Use the arrow keys to select a status to Change or Delete.
To Add a status press the Insert key.
To Change a status press the Enter key while the status is
highlighted.
To Delete a status press the Delete key while the status
highlighted.
TASK LIST
From here you can Add, Change, or Delete a task.
Use the arrow keys to select a task to Change or Delete.
Use the Page-Up and Page-Down keys to move a screen at a
time.
To Add a task press the Insert key.
To Change a task press the Enter key while the task is
highlighted.
To Delete a task press the Delete key while the task is
highlighted.
TTASKNUM
RRESP
SSTATUS
PPRN_OPT
FFILES
UFIL_UTIL
PPRNTRS
PPROJECTS
TASKMAN version 4.0
This is the main menu for TASKMAN. Use the arrow keys
to highlight the option you wish to execute.
Maintain Tasks - To Add/Change/Delete Tasks
Gantt List - Gantt List view to Add/Change/Delete Tasks
Print Tasks - To Print the Tasks with sort/select options
Maintain Resources - To Add/Change/Delete Resources
Maintain Status - To Add/Change/Delete Status
Select Project - Select Project file to work with
File Utilities - To delete Tasks from current project file
Printer Set-up - To Add/Change/Delete Printers & set up codes.
Return - To Exit TASKMAN
More help on: Tasks Resources Status Printing Files Utilities
Printers Projects
GANTT BAR
There are three Gantt bars that can be selected from
for printing in the Gantt report.
To pick a bar, enter an X in the box, otherwise press
the SPACEBAR or Enter to not select the bar.
DATE
All dates are entered in the format of MM/DD/YY.
The computer automatically places the '/' where
required.
The date entered in the starting date is the starting
point in a range of Planned completion dates that will
be selected to print. If no ending date is provided, all
tasks beyond the starting date will be selected.
The date entered in the ending date is the ending
point in a range of Planned completion dates that will
be selected to print. If no starting date is provided,
all tasks up to the ending date will be selected.
RESOURCE
The resource is the owner of the task. The maximum
field size is 20 characters.
If a resource is entered in the resource field, only
tasks with this resource will be selected.
STATUS
The status is a user definable field with a maximum
field size of 10 characters.
If a status code is entered in the status field, only
tasks with the status code will be selected.
TASK NUMBER
The task number is the primary identifier for the task,
any alpha-numeric field up to 8 characters can be used.
The task number entered in the starting task number
field will be used as the starting point of a range of
tasks. If no ending task number is provided, then all
tasks from the starting task to the last task will be
selected.
The task number in the ending task number field will be
used as the ending point for a range of tasks. If no
starting task number is provided, then all tasks up to
the ending task number will be selected.
ORIENTATION
Select either PORTrait or LANDscape orientation for
the printout.
Portrait will print based on a 89 line page at 8 lines per inch.
Landscape will print based on a 66 line page at 8 lines per inch.
DATES
PLANNED END DATE
The planned end date is the field used in reporting
tasks by date.
PRINTER SET UP
Printers can be set up by the user.
Printers can be added/changed/deleted. The printer
set up also prompts for the escape codes to be used to set the
printer in compressed and standard fonts. The symbols to be
used for printing GANTT charts are user definable also.
PRINTER CONFIGURATION
Through this screen you can modify any of the fields
displayed on the form.
You simply move from one field to the next, modifying
the data as required. Once you're satisfied press
Ctrl-Enter to accept the changes. If you want to reject
the changes made, press Ctrl-Esc.
To back up to a previous field use the Esc key.
TOPT_TASK
ROPT_RESP
POPT_DATE
SOPT_STAT
GRPT_TYPE
BOPTBAR
PRINT OPTIONS
You have the option of either printing the tasks in text
format, or in GANTT format.
If a GANTT chart has been selected, select the bars to print.
The program prompts for the printer to be used for printing.
The available sort options are: by Task Number
!by Resource
!by Planned End Date
If you select Resource for the sort field, you also have
the option of printing each resource's tasks on a new page.
Once the sort option has been selected, you can then
select: a Range of Task numbers
a Specific Resource
a Range of Planned End Dates
a Specific Status
More help on: Task Number Resource Planned End Date Status
Gantt Bars
PROJECTS
Tasks are grouped into data files that are accessed as
PROJECTS. By selecting a Project file you can change from one
list of tasks to another.
BREAK ON RESOURCE
If you select 'Yes' for break on resouce, the report
will form feed to a new page whenever then resource
changes. This option only exists when the Resource
sort print option has been selected.
COMPRESSED FONT
The ANSI escape codes used to put the printer into
compressed font.
The code should include the escape sequence used to set
the printer to 8 LPI (lines per inch)
All characters must be entered by using either printable
characters or by using the ALT key and the 3 digit code.
To enter the ESC code (ASCII 27) into the control code
you would type ALT(hold down)027.
Example: The code for IBM emulation is 015 (for condensed)
and 027 048 for 8 LPI. The code would look like:
0 when entered together.
PRINTER NAME
The printer name can be up to 20 characters.
STANDARD FONT
The ANSI escape codes used to put the printer into
standard font 10 CPI and 6 lines per inch.
The code should also include the escape codes to set the
printer to 6 lines per inch.
All characters must be entered by using either printable
characters or by using the ALT key and the 3 digit code.
To enter the ESC code (ASCII 27) into the control code
you would type ALT(hold down)027.
Example: The code for IBM emulation is 018 (10 CPI) and
027 050 (6 LPI). The code would look like:
2 when entered together.
GANTT SYMBOLS
Enter the symbol to be used for the GANTT line. The
character can be entered from the standard keyboard or
by using the ALT key and ASCII decimal code.
Example: To enter the
character which is ASCII 240
you would enter ALT(hold down)240.
Here are some symbols and corresponding codes:
174 175 176 177 178 179 186 205 219 220 221
232 233 234 236 237 238 239 240 248 249 250 251 254
REASON
The reason code is a 1 character code to identify the
reason the date is a non working day.
'V' could be used to denote a vacation day.
'H' could be used to denote a holiday.
TUPD_TASK
RESOURCE
The resource is the owner of the task. The maximum
field size is 25 characters.
Resources are maintained in a separate file. If a
resource is entered which is not in the resource file
yet, the program will automatically open the resource
listing screen. You can pick from one of the existing
resources or follow the instructions to add a new
resource.
more help on: TASK_FORM
REPORT TYPE
There are two options for the type of report to print:
Normal prints all of the fields for the selected tasks.
Gantt prints a GANTT chart for the selected tasks. The
GANTT chart is scaled to fit on one page. A Gantt line
is printed for the PLANNED DATES and the ACTUAL DATES.
Sort Option
The available sort options are: by Task Number
!by Resource
!by Planned End Date
If you select Resource for the sort field, you also have
the option of printing each resource's tasks on a new page.
TUPD_TASK
STATUS
The status is a user definable field with a maximum
field size of 10 characters.
Status codes are maintained in a separate file. If a
status is entered which is not in the status file yet,
the program will automatically open the status listing
screen. You can pick an existing status or follow the
instructions to add a new status.
more help on: TASK_FORM
TTASKNUM
TUPD_TASK
SUB TASK
The sub task number is the secondary identifier for the
the task, any alpa-numeric field up to 8 characters can
be used for this field.
The sub task number along with the task number represent
a unique key for the task number. Only one task-subtask
identifier can exist for a task. The system will notify
you if you have created a duplicate key.
more help on: TASKNUMBER TASK_FORM
SUPPRESS REPEATING TASK NUMBER
Selecting YES will suppress the printing of the task number
when it is duplicated for different sub tasks.
TUPD_TASK
TASK NUMBER
The task number is the primary identifier for the task,
any alpha-numeric field up to 20 characters can be used.
The task number along with the sub task number represent
a unique key for the task number. Only one task-subtask
identifier can exist for a task. The system will notify
you if you have created a duplicate key.
more help on: TASK_FORM
TITLE
Whatever is entered in this field will be printed as the
title for the report.
RESOURCE MAINTENANCE
Through this screen you can modify any of the fields
displayed on the form.
You simply move from one field to the next, modifying
the data as required. Once you're satisfied press
Ctrl-Enter to accept the changes. If you want to reject
the changes made, press Ctrl-Esc.
To back up to a previous field use the Esc key.
STATUS MAINTENANCE
Through this screen you can modify any of the fields
displayed on the form.
You simply move from one field to the next, modifying
the data as required. Once you're satisfied press
Ctrl-Enter to accept the changes. If you want to reject
the changes made, press Ctrl-Esc.
To back up to a previous field use the Esc key.
TASK MAINTENANCE
Through this screen you can modify any of the fields
displayed on the form.
You simply move from one field to the next, modifying
the data as required. Once you're satisfied press
Ctrl-Enter to accept the changes. If you want to reject
the changes made, press Ctrl-Esc.
To back up to a previous field use the Esc key.
To move to the next task, press Page-Down.
To move to the previous task, press Page-Up.
CALEND
CALENDARj
DATES
DEL_TASK
DESCR
DPI ?
DURATION
EXTDESCRr
FILES
FIL_UTIL
GNT_LIST
HLT
LST_PTR
LST_RESR
LST_STAT
LST_TASK
MAIN
OPTBAR
OPT_DATE
OPT_RESP
OPT_STAT
OPT_TASK
ORIENT
PL_EN_DT
PRNTRS
PRNT_CFGE7
PRN_OPT 49
PROJECTS
PRT_BRK
P_COM_CDJ?
P_NAME 6B
P_STD_CD
P_SYM
REASON aH
RESP
RPT_TYPE
SORT_OPTvM
STATUS
SUBTASK
SUP_TASK
TASKNUM
TITLE
UPD_RESR
UPD_STAT
UPD_TASK