home *** CD-ROM | disk | FTP | other *** search
/ Black Box 4 / BlackBox.cdr / genapps / btu.arj / BTUHLP.SLB (.txt) < prev    next >
MicroHelp  |  1990-01-29  |  18KB  |  670 lines

  1. MicroHelp Library
  2. !BTU ANALYSIS
  3. EHELP FILES
  4. Total fl
  5. r area requirements:
  6. rYou must measure each area and record these measurements for each
  7. Zarea.
  8. Take the length of the area, multiply by the width wi
  9.  give the
  10. Ytotal fl
  11. r space of the area.
  12. Measure ha
  13. ways, utility r
  14. ms, and any
  15. Xarea that is to be heated or c
  16. Areas that are not retangular in shape can be measured by breaking the
  17. Uarea up into sma
  18. er retangular areas for calculation ease.
  19. j(Example: A r
  20. m that is not rectangular can be broken up into thr
  21. Wrectangular areas.
  22. One measures 6 ft. x 7 ft., another 12 ft. x 
  23.  ft.,
  24. Xthe third 5 ft. x 6 ft.
  25. Total fl
  26. r space = (42 + 132 + 30) = 204 sq. ft.
  27.  [C] to continue or [R] to return to contents menu.
  28. !BTU ANALYSIS
  29. EHELP FILES
  30. Ceiling requirements #1:
  31. uThis program a
  32. umes a constant ceiling heigtht throughout the entire
  33. Vstructure to be analyzed.
  34. If ceiling heigths vary, you must analyze each
  35. Warea that varies from the co
  36. on heigth of the other areas found in the
  37. Ystructure.
  38. (Example:
  39. A structure has a co
  40. on ceiling heigth of 8 ft. through
  41. X9 of it's 12 r
  42. Two of the 'o
  43. ' heigths are the same, therefore these
  44. Utwo areas can be combined in one analysis.
  45. The other r
  46.  have to be
  47. Vconsidered separate from the other areas.
  48. The results from each of the 3
  49. Wanalysis' would then be a
  50. ed together to insure a more a
  51. urate analysis.
  52.  [C] to continue or [R] to return to contents menu.
  53. !BTU ANALYSIS
  54. EHELP FILES
  55. Help Contents
  56. A. What is n
  57. d for a proper analysis.
  58. zB. Busine
  59. lications.
  60. C. Type of analysis.
  61. D. Design temperature requirements.
  62. }E. Perimeter calculations.
  63. F. Wa
  64.  calculations.
  65. r calculations.
  66. H. Window calculations.
  67. I. Fl
  68. r and Ceiling calculations.
  69. j[ESC] to PREV
  70. Select item or pre
  71.  [R] to return to main menu.
  72. [F10] to QUIT
  73. !BTU ANALYSIS
  74. EHELP FILES
  75. The fo
  76. owing data is required:
  77. s1. The expected winter and su
  78. er OUTSIDE temperatures.
  79. i2. The INSIDE contro
  80. ed temperatures for heating and c
  81. ling.
  82. b3. Type of analysis, (busine
  83.  analysis or not, co
  84. ercial or not).
  85. ]4. The wa
  86.  type, heigth, and construction.
  87. u5. The number of d
  88. uming 20 square f
  89. t per d
  90. h6. D
  91. r construction and if there are storm d
  92. n7. The number of windows a
  93. uming 20 square f
  94. t per window for
  95. the fo
  96. owing directions: NORTH, NORTHEAST & NORTHWEST,
  97. EAST & WEST, SOUTHEAST & SOUTHWEST, SOUTH.
  98. s8. Window construction and type.
  99. v[ESC] to PREV
  100.  [C] to continue or [R] to return.
  101. [F10] to QUIT
  102. !BTU ANALYSIS
  103. EHELP FILES
  104. The fo
  105. owing data is required:
  106. The length, (perimeter), of any outside wa
  107. n10. Total fl
  108. r area and the construction of this fl
  109. . The ceiling type and construction.
  110. z12. If analysis is for a co
  111. erical building you wi
  112. to know how many persons, o
  113. ice equipment units,
  114. and lighting fixtures are to be in the area.
  115.  data used to derive the results come from the
  116. MANUAL J.
  117.  construction data a
  118. umes a worse case
  119. design consideration.
  120. q[ESC] to PREV
  121. 6[F10] to QUIT
  122. !BTU ANALYSIS
  123. EHELP FILES
  124. Special analysis requirements:
  125. sIf you wish to do a r
  126. m by r
  127. m analysis you wi
  128. , at this time have
  129. Uto enter each r
  130. m by itself and save it in a file by itself.
  131. Each file
  132. Xname should be unique and relate to the r
  133. m that is analyized.
  134. The totals
  135. Ufrom each analysis is a
  136. ed and a total she
  137.  analysis results.
  138. fIf you are doing a multi-story analysis you can either do each story
  139. Was a separate run, for separate heating/c
  140. ling systems.
  141. Or you may
  142. [use the construction selections to do an analysis, selecting the proper
  143. Yconstruction details for the fl
  144. r and ceiling.
  145. [ESC] to PREV
  146.  [C] to continue or [R] to return.
  147. [F10] to QUIT
  148. !BTU ANALYSIS
  149. EHELP FILES
  150. Outside temperature requirements:
  151. pThe outside temperature must be entered in degr
  152. s fahrenheit and may
  153. Vbe entered as a positive or negative number. i.e. -10 equals minus ten
  154. Zdegr
  155. s fahrenheit, 0 equals zero degr
  156. s fahrenheit, and 20 equals twenty
  157. Vdegr
  158. s fahrenheit.
  159. This temperature relates to the expected outside temperature during
  160. Xthe heating or c
  161. ling season.
  162. Obtain this temperature from your local
  163. Yweather bureau or heating/c
  164. ling geographical statistics.
  165. This data
  166. [can be obtained from your local library in heating/c
  167. ling design b
  168. [ESC] to PREV
  169. 6[F10] to QUIT
  170. !BTU ANALYSIS
  171. EHELP FILES
  172. Inside temperature requirements:
  173. qThe inside temperature must be entered in degr
  174. s fahrenheit and may
  175. Wbe entered as a positive or negative number. i.e. -10 equals minus ten
  176. Zdegr
  177. s fahrenheit, 0 equals zero degr
  178. s fahrenheit, and 20 equals twenty
  179. Vdegr
  180. s fahrenheit.
  181. This temperature relates to the inside or contro
  182. ed area temperature.
  183. UThis program is designed for air-conditioning of residential and co
  184. ercial
  185. Uhabitable areas only.
  186. Any other use wi
  187.  not be recognized as valid data
  188. Wand may result in program e
  189. ors or improper calculations.
  190. [ESC] to PREV
  191. 6[F10] to QUIT
  192. !BTU ANALYSIS
  193. EHELP FILES
  194. ercial a
  195. lication requirements:
  196. lThe program wi
  197.  ask if this run is for a co
  198. ercial or residential
  199. Xarea.
  200. It is asking whether the area is to be analyzed as a residential use
  201. Uarea or as a co
  202. ercial use area.
  203. Due to the amount of heat generated by
  204. Wlighting, o
  205. ice equipment, and people working in a co
  206. ercial area.
  207. It is
  208. Unece
  209. ary to consider this a
  210. ed heat in your analysis.
  211. nIf it is to be a co
  212. ercial area analysis the program wi
  213.  inquire as
  214. Vto how many lighting fixtures, o
  215. ice equipment units and people wi
  216.  be in
  217. Uthe area to be analyzed.
  218. If it is a residential area these questions are
  219. Wbypa
  220. ed and a value of 2 used for the number of persons in the area.
  221. X[ESC] to PREV
  222. 6[F10] to QUIT
  223. !BTU ANALYSIS
  224. EHELP FILES
  225. People in area requirements:
  226. tIf you have chosen a co
  227. ercial area analysis, the program wi
  228. Whow many people wi
  229.  be in the area to be analyzed.
  230. You must enter a pos-
  231. Vitive value or 0.
  232. It is reco
  233. ended that you do not enter 0 at this time
  234. Wdue to the fact that in a co
  235. ercial situation the number of people in the
  236. Varea wi
  237.  drastica
  238. y impact the values of heating and c
  239. ling n
  240. ded to
  241. Xproperly condition the area.
  242. c[ESC] to PREV
  243. 6[F10] to QUIT
  244. !BTU ANALYSIS
  245. EHELP FILES
  246. Perimeter measurement requirements:
  247. nYou must measure the outside wa
  248.  of any area to be analyzed.
  249. Ya she
  250.  calculation just measure the wa
  251. s on the outside of the structure
  252. Vto simplify this proce
  253. Remember to measure only the outside exposed
  254. s to insure a valid analysis.
  255. The perimeter of a structure can be measured by taking a tape measure
  256. Vand measuring the outside wa
  257. s from one corner of the structure to the
  258. Yother.
  259. You wi
  260.  then a
  261.  up a
  262.  the measurements, this amount is the area
  263. Vperimeter to be used in the analysis.
  264. If a r
  265. m by r
  266. m analysis is to be
  267. Vperformed, just measure the length of a
  268.  outside wa
  269. s and use this amount.
  270. Q[ESC] to PREV
  271. 6[F10] to QUIT
  272. !BTU ANALYSIS
  273. EHELP FILES
  274.  heigth requirements:
  275. uThe wa
  276.  heigth must be considered by the program so that total
  277. \outside exposed wa
  278.  area can be calculated.
  279. Measure the wa
  280.  heigth
  281. [of each r
  282. The program
  283. umes a constant wa
  284.  heigth thruout the
  285. Zstructure to be analyzed.
  286. If a great r
  287. m, or other non-standard wa
  288.  heigth areas are to be
  289. Yanalyzed, you must analyze this area by itself.
  290. Then a
  291.  the figures
  292. [together to complete the analysis.
  293. This wi
  294.  insure a more a
  295. urate
  296. [analysis than if a
  297. s were analyzed as the same heigth.
  298. [ESC] to PREV
  299. 6[F10] to QUIT
  300. !BTU ANALYSIS
  301. EHELP FILES
  302.  heigth requirements:
  303. uThe wa
  304.  heigth must be considered by the program so that total
  305. \outside exposed wa
  306.  area can be calculated.
  307. Measure the wa
  308.  heigth
  309. [of each r
  310. The program
  311. umes a constant wa
  312.  heigth thruout the
  313. Zstructure to be analyzed.
  314. If a great r
  315. m, or other non-standard wa
  316.  heigth areas are to be
  317. Yanalyzed, you must analyze this area by itself.
  318. Then a
  319.  the figures
  320. [together to complete the analysis.
  321. This wi
  322.  insure a more a
  323. urate
  324. [analysis than if a
  325. s were analyzed as the same heigth.
  326. [ESC] to PREV
  327.  [C] to continue or [R] to return.
  328. [F10] to QUIT
  329. !BTU ANALYSIS
  330. EHELP FILES
  331.  insulation requirements
  332. sThe proper wa
  333.  insulation must be considered.
  334. Select the con-
  335. \struction that is most like that of the structure that you are analyzing.
  336. WThe program wi
  337. ume that a
  338.  construction is the same for a
  339. Zthe wa
  340. s of the structure.
  341. The program wi
  342.  then display the insulation factors for each
  343.  construction.
  344. Select the insulation factor that is most like that
  345. Yof the structure that you are analyzing.
  346. [ESC] to PREV
  347. 6[F10] to QUIT
  348. !BTU ANALYSIS
  349. EHELP FILES
  350. r requirements:
  351. xThe program a
  352. umes that a
  353. rs have a total exposed area of 20
  354. Ysquare f
  355. If you must analyze structures or areas that have d
  356. [greater than 20 sq. ft., measure the d
  357. rs in question.
  358. nMultiply the heigth of the d
  359. r by the width.
  360. This wi
  361.  give you
  362. Zthe total exposed area for the d
  363. Take this figure and divide it by
  364.  this amount to the number of d
  365. rs that have the 20 sq. ft.
  366. \area.
  367. This amount can then be entered for use in the analysis.
  368. f(Example: A d
  369. r measures 5 ft. x 6 ft.
  370. The total exposed area is
  371. Y30 sq. ft.
  372. It equates to 1.5 d
  373. rs with an area of 20 sq ft.)
  374. _[ESC] to PREV
  375. 6[F10] to QUIT
  376. !BTU ANALYSIS
  377. EHELP FILES
  378. Window requirements:
  379. vThe program a
  380. umes that a
  381.  windows have a total exposed area of
  382. Z15 square f
  383. If you must analyze structures or areas that have
  384. ^windows greater than 15 sq. ft., measure the windows in question.
  385. dMultiply the heigth of the window by the width.
  386. This wi
  387.  give you
  388. Xthe total exposed area for the window.
  389. Take this figure and divide it by
  390.  this amount to the number of windows that have the 15 sq. ft.
  391. Zarea.
  392. This amount can then be entered for use in the analysis.
  393. f(Example: A window measures 4 ft. x 7 ft.
  394. The total exposed area is
  395. W28 sq. ft.
  396. It equates to 1.9 windows with an area of 15 sq ft.)
  397. ][ESC] to PREV
  398. 6[F10] to QUIT
  399. !BTU ANALYSIS
  400. EHELP FILES
  401. r construction and storm d
  402. pThe program wi
  403.  list various construction details for d
  404. ^Select the construction detail that matches that of the structure to
  405. \be analyzed.
  406. rs have b
  407. n selected to insure a 'WORSE CASE' condition
  408. \for tightne
  409.  of the d
  410. [ESC] to PREV
  411. 6[F10] to QUIT
  412. !BTU ANALYSIS
  413. EHELP FILES
  414. Window construction and storm windows:
  415. mThe program wi
  416.  list various construction details for windows.
  417. \Select the construction detail that matches that of the structure to
  418. \be analyzed.
  419.  windows have b
  420. n selected to insure a 'WORSE CASE' condition
  421. Zfor tightne
  422.  of the windows.
  423. [ESC] to PREV
  424. 6[F10] to QUIT
  425. !BTU ANALYSIS
  426. EHELP FILES
  427. Busine
  428. lication requirments:
  429. qIf you have selected to do an analysis for busine
  430.  you wi
  431. \to complete the blanks to set up the name, a
  432. , and city state for
  433. Zboth the company doing the analysis and the client having the analysis
  434. Zdone.
  435. A tip to minimize the keystrokes n
  436. ded for a run is to create a
  437. [master file that you have already entered data.
  438. This master file can be
  439. Xany analysis run.
  440. You wi
  441.  just load this master file and change the
  442. [data to conform to the new analysis run.
  443. You can then save the analysis
  444. Xwith a di
  445. erent file name.
  446. [ESC] to PREV
  447. 6[F10] to QUIT
  448. !BTU ANALYSIS
  449. EHELP FILES
  450. Date entry requirements:
  451. uThe date can be entered either manua
  452. y or by making use of the system
  453. Udate.
  454. This date is entered upon b
  455. ting the 'DOS' disk or stored in clock.
  456. ZTo make use of the system date, make sure that the system date is
  457. ect, then just pre
  458.  the 'ENTER' key.
  459. |The date can be entered manua
  460. y from the keyboard by entering the
  461. Ymonth, fo
  462. owed by a dash (-), or slash (/).
  463. Then day can be entered just
  464. Vas the month was fo
  465. owed by a dash, then the year entered just the same
  466. Xbut fo
  467. owed by no slash or dash.
  468. [ESC] to PREV
  469. 6[F10] to QUIT
  470. !BTU ANALYSIS
  471. EHELP FILES
  472. Equipment in area requirements:
  473. sIf you have chosen a co
  474. ercial area analysis, the program wi
  475. Whow many o
  476. ice equipment units wi
  477.  be in the area to be analyzed.
  478. Xmust enter a positive value or 0.
  479. It is reco
  480. ended that you do not enter
  481. V0 at this time due to the fact that in a co
  482. ercial situation the number
  483. Xof units in the area wi
  484.  drastica
  485. y impact the values of heating and
  486. ling n
  487. ded to properly condition the area.
  488. wTypewriters, copiers, computers, and other o
  489. ice equipment units are
  490. Vtreated as consuming exactly the same amount of energy and producing the
  491. Xsame amount of heat per hour.
  492. [ESC] to PREV
  493. 6[F10] to QUIT
  494. !BTU ANALYSIS
  495. EHELP FILES
  496. Lightin units in area requirements:
  497. qIf you have chosen a co
  498. ercial area analysis, the program wi
  499. Whow many lighting units wi
  500.  be in the area to be analyzed.
  501. You must enter
  502. Ua positive value or 0.
  503. It is reco
  504. ended that you do not enter 0 at this
  505. Wtime due to the fact that in a co
  506. ercial situation the number of units in
  507. Vthe area wi
  508.  drastica
  509. y impact the values of heating and c
  510. ling n
  511. Wto properly condition the area.
  512. `[ESC] to PREV
  513. 6[F10] to QUIT
  514. !BTU ANALYSIS
  515. EHELP FILES
  516. Total fl
  517. r area requirements:
  518. rYou must measure each area and record these measurements for each
  519. Zarea.
  520. Take the length of the area, multiply by the width wi
  521.  give the
  522. Ytotal fl
  523. r space of the area.
  524. Measure ha
  525. ways, utility r
  526. ms, and any
  527. Xarea that is to be heated or c
  528. Areas that are not retangular in shape can be measured by breaking the
  529. Uarea up into sma
  530. er retangular areas for calculation ease.
  531. j(Example: A r
  532. m that is not rectangular can be broken up into thr
  533. Wrectangular areas.
  534. One measures 6 ft. x 7 ft., another 12 ft. x 
  535.  ft.,
  536. Xthe third 5 ft. x 6 ft.
  537. Total fl
  538. r space = (42 + 132 + 30) = 204 sq. ft.
  539. S[ESC] to PREV
  540. 6[F10] to QUIT
  541. !BTU ANALYSIS
  542. EHELP FILES
  543. Foundation type requirements:
  544. sThe fl
  545. r and foundation type of the area to be analyzed must be con-
  546. Vsidered.
  547. Select the construction that is most like that of the structure
  548. Wthat you are analyzing.
  549. The program wi
  550. ume that the fl
  551. r is the same
  552. Ufor a
  553.  areas of the structure.
  554. The program wi
  555.  then display the various fl
  556. r for the selected con-
  557. Vstruction type.
  558. Select the fl
  559. r that most matches that of the structure
  560. Wthat you are analyzing.
  561. If you are analyzing areas with di
  562. erent foundation/fl
  563. r types, you
  564. Vmust analyze each area separately and a
  565.  the data together for a valid run.
  566. Q[ESC] to PREV
  567. 6[F10] to QUIT
  568. !BTU ANALYSIS
  569. EHELP FILES
  570. Ceiling requirements #1:
  571. uThis program a
  572. umes a constant ceiling heigtht throughout the entire
  573. Vstructure to be analyzed.
  574. If ceiling heigths vary, you must analyze each
  575. Warea that varies from the co
  576. on heigth of the other areas found in the
  577. Ystructure.
  578. (Example:
  579. A structure has a co
  580. on ceiling heigth of 8 ft. through
  581. X9 of it's 12 r
  582. Two of the 'o
  583. ' heigths are the same, therefore these
  584. Utwo areas can be combined in one analysis.
  585. The other r
  586.  have to be
  587. Vconsidered separate from the other areas.
  588. The results from each of the 3
  589. Wanalysis' would then be a
  590. ed together to insure a more a
  591. urate analysis.
  592. S[ESC] to PREV
  593. 6[F10] to QUIT
  594. !BTU ANALYSIS
  595. EHELP FILES
  596. Ceiling requirements #2:
  597. uThe ceiling type and construction of the area to be analyzed must be
  598. Wconsidered.
  599. Select the construction that is most like that of the struc-
  600. Wture that you are analyzing.
  601. The program wi
  602. ume that the ceiling is
  603. Wthe same for a
  604.  areas.
  605. The program wi
  606.  then display the various ceilings for the selected
  607. Xconstruction type.
  608. Select the ceiling that most matches that of the area
  609. Wthat you are analyzing.
  610. If you are analyzing areas with di
  611. erent ceiling types/constructions,
  612. Uyou must analyze each area separately and a
  613.  the data together.
  614. ][ESC] to PREV
  615. 6[F10] to QUIT
  616. !BTU ANALYSIS
  617. EHELP FILES
  618. Foundation type requirements:
  619. sThe fl
  620. r and foundation type of the area to be analyzed must be con-
  621. Vsidered.
  622. Select the construction that is most like that of the structure
  623. Wthat you are analyzing.
  624. The program wi
  625. ume that the fl
  626. r is the same
  627. Ufor a
  628.  areas of the structure.
  629. The program wi
  630.  then display the various fl
  631. rs for the selected con-
  632. Ustruction type.
  633. Select the fl
  634. r that most matches that of the structure
  635. Wthat you are analyzing.
  636. If you are analyzing areas with di
  637. erent foundation/fl
  638. r types, you
  639. Vmust analyze each area separately and a
  640.  the data together for a valid run.
  641. Q[ESC] to PREV
  642. 6[F10] to QUIT
  643. U    FLOORAREA
  644. CEILINGS
  645. HELPCONTENTS1    
  646. NEEDED1B
  647. NEEDED2z
  648. SPECANALYSIS1
  649. OUTSIDETEMP1A
  650. INSIDETEMP1A
  651. COMMERCIALAPP1A
  652. PEOPLEAPP1A
  653. PERIMETERAPP1A
  654. WALLHEIGTH1A
  655. WALLINSULATION-
  656. WALLINSULATION1A
  657. DOORS1A
  658. U    WINDOWS1A
  659. DOORS2B
  660. U    WINDOWS1B
  661. BUSINESSAPP1A
  662. DATEHLP+/
  663. EQUIPHLP
  664. LITESHLPq4
  665. FLOORAREA1A
  666. U    FOUNDAT1Ah9
  667. CEILINGS1A%<
  668. CEILINGS2A
  669. U    FOUNDAT2A
  670.