ocr: AEC Architectural Help Slides STEP A STEP B H5/6 Set the wall justification as followsi "CUPY the With justification set to 'L' rubber-bo.nd lne "Left, the woll IInes wlll be drown a5 F4/5/6 Right", or In both shown by the yellow lines. arectlons (Center Line), The blue dotted lines nrF from stort polnt to represent the chalk-line" end point. or rupberbanci line, WALIL STEP C CRBATION STEP D Wall thicknesses and Note chonge in bottom drectlon Moy be changed wall position due to the while remaining In the reversal of direction of wall generation routine, the woll