home *** CD-ROM | disk | FTP | other *** search
/ Liren Large Software Subsidy 13 / 13.iso / p / p066 / 6.img / AEC-H1.SLB / AT06Q.png < prev    next >
Portable Network Graphic  |  1989-06-22  |  6.0 KB  |  573x293  |  4-bit (5 colors)
   ocr: AEC Architectural Help Slides STEP A STEP B H5/6 Set the wall justification as followsi "CUPY the With justification set to 'L' rubber-bo.nd lne "Left, the woll IInes wlll be drown a5 F4/5/6 Right", or In both shown by the yellow lines. arectlons (Center Line), The blue dotted lines nrF from stort polnt to represent the chalk-line" end point. or rupberbanci line, WALIL STEP C CRBATION STEP D Wall thicknesses and Note chonge in bottom drectlon Moy be changed wall position due to the while remaining In the reversal of direction of wall generation routine, the woll