home *** CD-ROM | disk | FTP | other *** search
/ NetNews Usenet Archive 1993 #3 / NN_1993_3.iso / spool / sci / space / news / 2897 < prev    next >
Encoding:
Text File  |  1993-01-23  |  2.0 KB  |  47 lines

  1. Newsgroups: sci.space.news
  2. Path: sparky!uunet!elroy.jpl.nasa.gov!ames!dont-send-mail-to-path-lines
  3. From: baalke@kelvin.Jpl.Nasa.Gov (Ron Baalke)
  4. Subject: Galileo Update - 01/22/93
  5. Message-ID: <23JAN199306292949@kelvin.jpl.nasa.gov>
  6. To: sci-space-news@ames.arc.nasa.gov
  7. Followup-To: sci.space
  8. News-Software: VAX/VMS VNEWS 1.41    
  9. Keywords: Galileo, JPL
  10. Sender: digester@news.arc.nasa.gov
  11. Nntp-Posting-Host: kelvin.jpl.nasa.gov
  12. Organization: Jet Propulsion Laboratory
  13. Date: Sat, 23 Jan 1993 06:29:00 GMT
  14. Approved: sci-space-news@ames.arc.nasa.gov
  15. Lines: 30
  16.  
  17. Forwarded from Bill O'Neil, Galileo Project Manager
  18.  
  19.                             GALILEO STATUS REPORT
  20.                                January 22, 1993
  21.  
  22.      The Galileo Spacecraft is operating normally in the dual-spin mode and
  23. is transmitting coded telemetry at 1200 bps (bits/second).
  24.  
  25.      Yesterday, AACS (Attitude and Articultion Control Subsystem)
  26. calibrations were performed, as planned.  Tracking was scheduled over DSS-14
  27. (Goldstone 70 meter antenna) and DSS-43 (Canberra 70 meter antenna).
  28.  
  29.      Today, January 22, 1993, real-time commands were sent to power cycle the
  30. UVS (Ultraviolet Spectrometer) on/off to exercise the drive mechanism.
  31. Real-time commands are also scheduled to perform planned system fault
  32. protection updates.  Stored sequence planned cruise science MROs (Memory
  33. Readouts) were completed as scheduled.  Also, the planned USO (Ultra Stable
  34. Oscillator) test was performed.  The PWS (Plasma Wave) instrument is also
  35. scheduled to be turned on from the stored sequence.  Tracking is scheduled
  36. over DSS-43.
  37.  
  38.      Over the weekend, no spacecraft activity or tracking is scheduled.
  39. The AACS inflight mode is scheduled to begin on Monday, January 25, 1993.
  40.      ___    _____     ___
  41.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  42.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  43.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Every once in a while,
  44. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | try pushing your luck.
  45. |_____|/  |_|/       |_____|/                     |
  46.  
  47.