  1. Newsgroups: sci.space.news
  2. Path: sparky!uunet!cs.utexas.edu!zaphod.mps.ohio-state.edu!saimiri.primate.wisc.edu!ames!dont-send-mail-to-path-lines
  3. From: baalke@kelvin.Jpl.Nasa.Gov (Ron Baalke)
  4. Subject: Galileo Update - 01/21/93
  5. Message-ID: <21JAN199322461670@kelvin.jpl.nasa.gov>
  6. To: sci-space-news@ames.arc.nasa.gov
  7. Followup-To: sci.space
  8. News-Software: VAX/VMS VNEWS 1.41    
  9. Keywords: Galileo, JPL
  10. Sender: digester@news.arc.nasa.gov
  11. Nntp-Posting-Host: kelvin.jpl.nasa.gov
  12. Organization: Jet Propulsion Laboratory
  13. Date: Thu, 21 Jan 1993 22:46:00 GMT
  14. Approved: sci-space-news@ames.arc.nasa.gov
  15. Lines: 154
  16.  
  17. Forwarded from Neal Ausman, Galileo Mission Director
  18.  
  19.                                     GALILEO
  20.                        MISSION DIRECTOR STATUS REPORT
  21.                                  POST-LAUNCH
  22.                             January 15 - 21, 1993
  23.  
  24. SPACECRAFT
  25.  
  26. 1.  On January 15, the Dual Drive Actuator (DDA-5) Turn E sequence memory load
  27. was uplinked to the spacecraft without incident.  This sequence covers
  28. spacecraft activities from January 18, 1993 through January 20, 1993 and
  29. includes DDA hammer window opportunities throughout the period.
  30.  
  31. 2.  On January 15, one 360 pulse hammer sequence was executed with the HGA
  32. (High Gain Antenna) motor temperature at 36.2 degrees C.  This hammer sequence
  33. utilized two different hammer frequencies (1.25 hertz and 1.875 hertz).
  34.  
  35. 3.  On January 18, one 360 pulse hammer sequence was executed with the HGA
  36. motor temperature at 34.0 degrees C.  This hammer sequence utilized two
  37. different hammer frequencies (1.25 hertz and 1.875 hertz).  Real-time commands
  38. were then sent to reacquire celestial reference at the completion of the star
  39. scanner checkout.
  40.  
  41. 4.  On January 18, the EE-12A (Earth-Earth #12A) sequence memory load was
  42. uplinked to the spacecraft without incident.  This sequence covers spacecraft
  43. activities from January 20, 1993 through January 23, 1993.
  44.  
  45. 5.  On January 19, as part of DDA-5 Turn E sequence activities, the turn to a
  46. 9-degree off-sun attitude started at approximately 1802 UTC and completed at
  47. 1822 UTC.  After approximately one hour at the new attitude, hammering of the
  48. HGA motors commenced.  Five 360 hammer pulse sequences were sent beginning at
  49. 1935 UTC and ending at 2349 UTC.  The motor hammering sequences were executed
  50. with the HGA motor temperature at 25.5 degrees C, 21.4 degrees C,
  51. 19.3 degrees C, 17.2 degrees C, and 15.2 degrees C.  These hammer sequences
  52. utilized two different hammer frequencies (1.25 hertz and 1.875 hertz).  There
  53. continues to be no substantial ballscrew rotation since the major hammering on
  54. December 29, 1992.  Approximately 5 hours after the motor hammering activity
  55. terminated, real-time commands were sent to reacquire celestial reference after
  56. the star scanner checkout completed.
  57.  
  58. 6.  On January 20, a periodic RPM (Retro-Propulsion Module) 10-Newton thruster
  59. maintenance activity was performed; all 12 thrusters were "flushed" during the
  60. activity.  Spacecraft activity throughout the period was normal.
  61.  
  62. 7.  On January 20, a SITURN was scheduled in the EE-12 sequence.  The purpose
  63. of the SITURN was to ensure the spacecraft was at the EE-12 attitude in the event
  64. that the DDA-5 Turn E sequence was not executed on the spacecraft.
  65.  
  66. 8.  During the period from January 20 through January 21, a navigation cycle
  67. was performed.  This navigation cycle provided near-continuous acquisition of
  68. two-way doppler and ranging data during four consecutive passes of the
  69. spacecraft over DSS-43 (Canberra 70 meter antenna), DSS-63 (Madrid 70 meter
  70. antenna), DSS-14 (Goldstone 70 meter antenna), and then back to DSS-43.
  71.  
  72. 9.  On January 20, real-time commands were sent to enable the master critical
  73. enable and to lift AACS (Attitude and Articulation Control Subsystem) write
  74. protects in preparation for the sequence controlled Clock System Identification
  75. (CLKSYSID) activity.  Upon completion of the CLKSYSID, real-time commands were
  76. then sent to restore the AACS write protects and to disable the master
  77. critical enable.
  78.  
  79. 10. On January 21, Cruise Science Memory Readouts (MROs) were performed for the
  80. Extreme Ultraviolet Spectrometer (EUV).  Preliminary analysis indicates the data
  81. was received properly.
  82.  
  83. 11. On January 21, numerous attitude control subsystem calibrations were
  84. performed including a Star Scanner A calibration, wobble identification, gyro
  85. drift calibration, spin detector A calibration, Spin Bearing Assembly (SBA)
  86. drag torque calibration, accelerometer calibration, and a Scan Actuator
  87. Subassembly (SAS) friction test.  The data was collected nominally and
  88. analysis is in progress.
  89.  
  90. 12. The AC/DC bus imbalance measurements have not exhibited significant change
  91. (greater than 25 DN) throughout this period.  The AC measurement reads 18DN
  92. (4.1 volts).  The DC measurement reads 153DN (18.0 volts).  These
  93. measurements are consistent with the model developed by the AC/DC special
  94. anomaly team.
  95.  
  96. 13. The Spacecraft status as of January 21, 1993, is as follows:
  97.  
  98.        a)  System Power Margin -  74 watts
  99.        b)  Spin Configuration - Dual-Spin
  100.        c)  Spin Rate/Sensor - 3.15rpm/Star Scanner
  101.        d)  Spacecraft Attitude is approximately 8 degrees
  102.            off-sun (leading) and 39 degrees off-earth (leading)
  103.        e)  Downlink telemetry rate/antenna- 1200bps(coded)/LGA-1
  104.        f)  General Thermal Control - all temperatures within
  105.            acceptable range
  106.        g)  RPM Tank Pressures - all within acceptable range
  107.        h)   Orbiter Science- Instruments powered on are the EUV,
  108.             EPD, MAG, HIC, and DDS
  109.        i)  Probe/RRH - powered off, temperatures within
  110.            acceptable range
  111.        j)  CMD Loss Timer Setting - 120 hours
  112.            Time To Initiation - 96 hours
  113.  
  114.  
  115. UPLINK GENERATION/COMMAND REVIEW AND APPROVAL:
  116.  
  117. 1.  The Dual Drive Actuator (DDA-5) Part E sequence memory load was approved
  118. for transmission by the Project on January 15, 1993.  This sequence covered
  119. High Gain Antenna (HGA) motor hammering activities from January 18, 1993 to
  120. January 20, 1993.  As with previous hammering activities, individual sets of
  121. hammering commands were approved as required prior to being uplinked to the
  122. spacecraft.
  123.  
  124. 2.  The EJ-1 (Earth-Jupiter #1) Cruise Plan was approved by the Project on
  125. January 19, 1993.  This plan covers spacecraft activities from April 12, 1993
  126. to June 15, 1993.
  127.  
  128. GDS (Ground Data Systems):
  129.  
  130. 1.  A Galileo MVT (Mission Verification Test) was performed on January 14, 1993,
  131. using DSS-14 (Goldstone).  The purpose of the test was to evaluate the new
  132. Station Communications Processor's (SCP) ability to support Galileo.  This test
  133. exercised telemetry and monitor for Galileo.  The SCP worked well for all
  134. Galileo telemetry rates and monitor.  Two liens were identified during MVT
  135. testing: (1) unable to perform dual stream 134.4 kbps data test due to
  136. unavailability of DSN (Deep Space Network) resources; (2) unable to use MCCC
  137. (Mission Control and Computing Center) SIM long loop due to ARAs (Area Routing
  138. Assembly) being prime.  These liens will be demonstrated as working in SOAK by
  139. performing GDS tests on the specific lien.  The SCP is expected to go into SOAK
  140. for Galileo support on February 5, 1993.
  141.  
  142. TRAJECTORY
  143.  
  144.      As of noon Thursday, January 21, 1993, the Galileo Spacecraft trajectory
  145. status was as follows:
  146.  
  147.     Distance from Earth         31,623,600 km (0.21 AU)
  148.     Distance from Sun           168,800,400 km (1.13 AU)
  149.     Heliocentric Speed          129,300 km per hour
  150.     Distance from Jupiter       730,891,900 km
  151.         Round Trip Light Time       3 minutes, 32 seconds
  152.  
  153.  
  154. SPECIAL TOPIC
  155.  
  156. 1.  As of January 21, 1993, a total of 64682 real-time commands have been
  157. transmitted to Galileo since Launch.  Of these, 59329  were initiated in the
  158. sequence design process and 5053 initiated in the real-time command process.
  159. In the past week, 18743 real time commands were transmitted: 18743 were
  160. initiated in the sequence design process and none initiated in the real time
  161. command process.  Major command activities included commands to uplink DDA-5E
  162. sequence memory load, hammer the HGA motors, reacquire celestial reference,
  163. uplink the EE-12A sequence memory load, and perform CLKSYSID activities.
  164.      ___    _____     ___
  165.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  166.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  167.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Every once in a while,