home *** CD-ROM | disk | FTP | other *** search
- Path: sparky!uunet!gossip.pyramid.com!pyramid!dosbears!mikel
- From: mikel@dosbears.UUCP (Mike Lipsie)
- Newsgroups: ba.transportation
- Subject: Re: BART handout news
- Message-ID: <1551@dosbears>
- Date: 21 Jan 93 05:39:18 GMT
- References: <1993Jan21.025025.23364@s1.gov>
- Reply-To: dosbears!mikel@pyramid.com
- Distribution: ba
- Organization: DOS Bears
- Lines: 16
-
- In article <1993Jan21.025025.23364@s1.gov> lip@s1.gov (Loren I. Petrich) writes:
- >
- > In the most recent (Jan. 1993) BART Times pamphlet I got at a
- >
- > Some high-tech BART plans: BART has contracted studies to
- >develop a precision trackside train detector for allowing smaller
- >headways, mentioning 80 seconds as a possible goal (!). (Original
- >plans: 90 s, current: 3.5 min or 210 s).
-
- According to a similar BART handout a year ago or so, the system
- through San Francisco can now run at 2.5 minute headways (150 second).
-
- --
- Mike Lipsie 584 Castro #614, San Francisco, CA 94114
- dosbears!mikel@pyramid.com
- mikel%dosbears.uucp@ingres.com Running rn (for DOS) with UUPC/Extended 1.11k
-