home *** CD-ROM | disk | FTP | other *** search
/ NetNews Usenet Archive 1993 #1 / NN_1993_1.iso / spool / sci / space / 19055 < prev    next >
Encoding:
Internet Message Format  |  1993-01-08  |  2.3 KB

  1. Xref: sparky sci.space:19055 sci.astro:13788 alt.sci.planetary:482
  2. Newsgroups: sci.space,sci.astro,alt.sci.planetary
  3. Path: sparky!uunet!elroy.jpl.nasa.gov!jato!burns!kelvin.jpl.nasa.gov!baalke
  4. From: baalke@kelvin.jpl.nasa.gov (Ron Baalke)
  5. Subject: Mars Observer Update - 01/08/93
  6. Message-ID: <9JAN199300533179@kelvin.jpl.nasa.gov>
  7. News-Software: VAX/VMS VNEWS 1.41    
  8. Keywords:  Mars Observer, JPL
  9. Sender: news@burns.jpl.nasa.gov (Usenet News Account)
  10. Nntp-Posting-Host: kelvin
  11. Organization: Jet Propulsion Laboratory
  12. Date: Sat, 9 Jan 1993 00:53:00 GMT
  13. Lines: 38
  14.  
  15. Forwarded from the Mars Observer Project
  16.  
  17.                         MARS OBSERVER STATUS REPORT
  18.                              January 8, 1993
  19.                                1:30 PM PST
  20.  
  21. The spacecraft is in Array Normal Spin and continues to perform as
  22. expected. Teams are continuing to study the Attitude Control Subsystem
  23. miscompared star problem.
  24.  
  25. Downlink is via the HGA (High Gain Antenna) at 2 kilobits per second.
  26. Uplink is at 125 bps using the LGA (Low Gain Antenna). HGA calibration
  27. activities were completed last evening.  Those calibrations indicate
  28. HGA performance to be nominal.
  29.  
  30. With completion of C5 B as scheduled at 7:00 PM last evening, no flight
  31. sequences are currently active.  This is to provide a ten day window to
  32. allow upload of a new Flight Software build.
  33.  
  34. Teams are preparing Flight Software Build 7.1.1 for uplink on January 13
  35. though 15.  Build 7.1.1 contains changes to AACS (Attitude and Articulation
  36. Control Subsystem) Fault Protection logic determined to be necessary by
  37. the Spacecraft Team.  These changes are not related to the Celestial
  38. Sensor Assembly miscompared star situation.
  39.  
  40. The next Flight Sequence, C6 B (necessary C6 A activities were moved
  41. into C5 B) is scheduled to go active on January 18.
  42.  
  43. Ka Band Link Experiment (KaBLE) activities have begun and are scheduled
  44. to take place daily through January 12.  There are additional KaBLE
  45. opportunities projected for January 16 and 17.
  46.      ___    _____     ___
  47.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  48.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  49.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Choose a job you love, and
  50. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | you'll never have to work
  51. |_____|/  |_|/       |_____|/                     | a day in your life. 
  52.  
  53.