home *** CD-ROM | disk | FTP | other *** search
/ Usenet 1994 January / usenetsourcesnewsgroupsinfomagicjanuary1994.iso / sources / std_unix / volume.15 / text0017.txt < prev    next >
Encoding:
Internet Message Format  |  1989-01-17  |  5.9 KB

  1. From: uunet!unisoft!hlj (Hal Jespersen)
  2.  
  3.  
  4.         P1003.2 Working Group Status Report--October 1988
  5.  
  6.                   Hal Jespersen
  7.  
  8.                UniSoft Corporation
  9.  
  10.        November    6, 1988
  11.  
  12.        The P1003.2 POSIX Shell and Utilities Working Group met in
  13.        Honolulu, Hawaii, October 24 through 28,    1988.
  14.  
  15.        The following were the highlights of the    meeting:
  16.  
  17.      1.  The P1003.2 Technical Editor, Maggie Lee, of Amdahl
  18.          Corporation, resigned her position    because    of workload
  19.          conflicts.    Maggie served in this position since April
  20.          1987 and the Working Group    expressed their    sincere
  21.          thanks for    all the    outstanding work she did on Drafts
  22.          3 through 7.  Hal Jespersen will assume these duties
  23.          as    editor until a suitable    replacement can    be found.
  24.          An    arrangement of chapter editors feeding materials
  25.          into an overall draft editor may be attempted.
  26.  
  27.      2.  The results of the    ``mock ballot''    against    Draft 7
  28.          were processed almost the entire week.  The Working
  29.          Group did an outstanding job of submitting    objections-
  30.          --over 1400--on a very tight schedule; they repeated
  31.          the feat by resolving almost all of them during the
  32.          week.  As a result, Draft 8 will be a draft of
  33.          considerably higher quality and will be a good start
  34.          for the formal balloting process.
  35.  
  36.      3.  A schedule    for balloting was discussed.  The balloting
  37.          group for 1003.2 closes in    early November;    the exact
  38.          date is unknown (but it is    probably before    you're
  39.          reading this report).  Draft 8 will be targeted for
  40.          completion    of editing December 5, 1988, although the
  41.          exceptionally high    volume of changes may delay this
  42.          until the 12th.  Assuming that the    IEEE office
  43.          receives it in mid-December, a balloting period of
  44.          January 1 through February    15, 1989 is probable.
  45.          Considering the experiences of P1003.1, it    is very
  46.          likely that final approval    will not be reached before
  47.          December, 1989, for approval at the January, 1990,
  48.          Standards Board meeting.
  49.  
  50.      4.  Some of the significant changes to    appear in Draft    8:
  51.  
  52.            a.  A new Chapter 7 was accepted, based on software
  53.            for application installation    developed by
  54.            Digital Equipment Corp.
  55.  
  56.  
  57.        P1003.2 Status Report 10/88                  2
  58.  
  59.            b.  The chapters    will be    rearranged slightly.
  60.            Chapter 3 (Environment) will    be merged into 2
  61.            (Definitions).  The C language bias of Draft    7
  62.            will    be negated by establishing a new language-
  63.            independent bindings    chapter    (just stubs for
  64.            now).  The C    language bindings will appear in a
  65.            separate chapter, clearly marked as destined    for
  66.            removal in a    future draft, after a separate C
  67.            bindings working group is established.  (At the
  68.            meeting, it was discussed putting them into a
  69.            ``normative appendix,'' but I have since found
  70.            out that that isn't normal IEEE procedure, so
  71.            they'll have    to be in real chapters to stay in
  72.            the standard.)  A decision was made to not
  73.            include an empty chapter for    Ada bindings, as an
  74.            active working group    is already in progress for
  75.            Ada,    so that    chapter    has a home of its own in
  76.            their standard.  Separate chapters for C and
  77.            FORTRAN development tools will point    back to    a
  78.            new language-independent compiler-linker
  79.            section.
  80.  
  81.            c.  The egrep and fgrep commands    have been merged
  82.            into    a single new grep.
  83.  
  84.            d.  The xform command was removed as unnecessary.
  85.  
  86.            e.  The UUCP-oriented commands were moved to an
  87.            appendix, awaiting balloting    group direction    for
  88.            inclusion in    the standard.
  89.  
  90.            f.  Major surgery was performed on the hd command,
  91.            which was also renamed xd, to avoid collisions
  92.            with    vendor commands.
  93.  
  94.            g.  The strip command was added to the Software
  95.            Development chapter.
  96.  
  97.      5.  A draft PAR for a ``User Portability Extension'' (UPE)
  98.          was discussed.  This supplement to    1003.2 is intended
  99.          to    provide    many of    the familiar interactive UNIX
  100.          utilities,    such as    full screen editors, omitted from
  101.          the original P1003.2 scope.  It will promote user
  102.          portability, but there are    two caveats:  users are
  103.          limited to    being traditional time-sharing UNIX users,
  104.          such as program developers, and; the terminals
  105.          supported are limited to asynchronous character-mode
  106.          terminals,    such as    VT100's.  Advanced work    into
  107.          windows or    mouse-based systems is specifically
  108.          excluded.    The Working Group will spend the majority
  109.          of    1989 on    this extension.     The PAR will be submitted
  110.  
  111.  
  112.        P1003.2 Status Report 10/88                  3
  113.  
  114.          in    late November, 1988.
  115.  
  116.      6.  The NIST (formerly    NBS) confirmed plans to    issue a
  117.          POSIX Shell and Tools FIPS    based on Draft 8 in
  118.          December.    They are planning on accepting the entire
  119.          draft with    the exception of some of the
  120.          internationalization features and the nascent
  121.          application installation material;    and, the software
  122.          development options will remain optional.
  123.  
  124.        The next    meeting    is scheduled for January 9 - 12, 1989, in
  125.        Fort Lauderdale,    Florida.  (Embassy Suites Hotel, 1000 SE
  126.        17th Street.  (305) 527-7000; specify group rate    for ``IEEE
  127.        P1003 meeting.)    Since the balloting against Draft 8 will
  128.        still be    in its early stages, this is an    abbreviated meeting
  129.        that will concentrate almost entirely on    the new    UPE
  130.        supplement.  January 9 -    11 is for the full Working Group;
  131.        January 12 is reserved for balloting coordination by the
  132.        technical reviewers.
  133.  
  134.          Subsequent    meetings:
  135.  
  136.          April 24 -    28, 1989      St Paul, Minnesota.
  137.  
  138.          July 10 - 14, 1989          San Francisco, California.
  139.  
  140.          October 16    - 20, 1989    Brussels,    Belgium.
  141.  
  142.                      Hal Jespersen, Chair P1003.2
  143.                      UniSoft Corp
  144.                      6121 Hollis Street
  145.                      Emeryville, CA 94608-2092
  146.                      (415) 420-6410, ext 448
  147.                      {uunet,amdahl,sun}!unisoft!hlj
  148.  
  149.  
  150.  
  151. Volume-Number: Volume 15, Number 28
  152.  
  153.