  1.         
  2.  
  3.                         SYSTEM TESTING & DEBUGGING
  4.  
  5.         Once you have CONNDOOR set up to where you think it is 
  6.         ready to go, here are some hints and things to do before 
  7.         you turn your users lose on it.
  8.  
  9.         TEST.EXE -
  10.             The TEST.EXE program is nothing more than a dummy 
  11.         program that exits with a "0" telling CONNDOOR that 
  12.         the transfer was successful.  
  13.  
  14.         TEST.EXE can be entered as a protocol and the only 
  15.         stipulation is that NONE be selected for Log Type since 
  16.         TEST does not create a log.
  17.  
  18.         When Download is selected with TEST in your BBSs local 
  19.         mode, CONNDOOR will treat the download as successful 
  20.         updating all logs and records as if the transfer was 
  21.         successful.
  22.  
  23.         When using TEST for upload testing, CONNDOOR will check 
  24.         the upload directory for the file you listed for upload, 
  25.         after the transfer is complete.  If it finds a file of 
  26.         the same name, it will treat it as a successful upload.  
  27.         If the file is not found, CONNDOOR will treat it as a 
  28.         failed upload.
  29.  
  30.         EXAMPLE -
  31.         Rename or create any file "ABCD.ZIP" and place it in 
  32.         the upload directory.  
  33.  
  34.         Enable CONNDOOR for upload from your BBS in the LOCAL 
  35.         mode and select the TEST protocol.  
  36.         
  37.         Identify "ABCD.ZIP" for upload.  
  38.         
  39.         Start the transfer and "ABCD.ZIP" will be taken into 
  40.         the system as a successful upload with all the 
  41.         associated logs and records updated. 
  42.  
  43.                              **** NOTE ****
  44.  
  45.         Remember!  Remove the TEST protocol entry from the 
  46.         protocol list before you make CONNDOOR available to 
  47.         your users.
  48.  
  49.         This method of testing will also exercise the TAPE and 
  50.         CDROM interface.  I highly recommend doing the above 
  51.         before certifying the system is ready for users.
  52.  
  53.  
  54.