home *** CD-ROM | disk | FTP | other *** search
-
- ************************************************************************
- DDN MGT Bulletin: 9408 DISA DDN Defense Communications System
- 18 Jul 1994 Published by: DDN Network Info Center
- (NIC@NIC.DDN.MIL) (800) 365-3642
-
-
- DEFENSE DATA NETWORK
- MANAGEMENT BULLETIN
-
- The DDN MANAGEMENT BULLETIN is distributed online by the DDN Network
- Information Center under DISA contract as a means of communicating
- official policy, procedures and other information of concern to
- management personnel at DDN facilities. Back issues may be read
- through the TACNEWS server ("@n" command at the TAC) or may be
- obtained by FTP (or Kermit) from the NIC.DDN.MIL host [192.112.36.5]
- using login="anonymous" and password="guest". The pathname
- for bulletins is ddn-news/ddn-mgt-bulletin-nn.txt (where "nn" is the
- bulletin number).
- ************************************************************************
-
- IN REPLY 8 Jul 94
- REFER TO: UTDS
-
-
- MEMORANDUM FOR DISTRIBUTION
-
- SUBJECT: 1994 MILNET/DSNET1 Node Site Coordinators' Conference Minutes
-
- 1. The MILNET/DSNET1 Node Site Coordinators' (NSC) Conference was held
- during the period of 7-9 June 1994 at Greeley Hall, Ft Huachuca, AZ.
- The purpose of the conference was to furnish node site coordinators and
- MILDEP representatives with the most current information on activities
- and initiatives related to the unclassified and secret data networks.
- The focus of this year's conference was the Defense Data Network (DDN)
- transition to the IP data services of the Defense Information Systems
- Network (DISN).
-
- 2. The NSC Conference was a success due to the active participation of
- all attendees. It proved to be a valuable forum, met its objectives
- and resulted in recommendations to enhance the DISN transition process.
- We look for your continued support in our efforts to provide quality
- service to our customers.
-
- 3. Provided as enclosures are: 1) Agenda (as presented); 2) Summary of
- Briefings; 3) List of Conference Action Items and Status; 4) List of
- Conference Participants. Noted discrepancies or comments relative to
- any of the enclosures should be brought to the attention of
- Maj John Lent, UTDS, DSN 222-2757/COMM (703) 692-2757; E-Mail
- lentj@cc.ims.disa.mil.
-
- FOR THE DIRECTOR
- <signed>
-
- 4 Encl a/s ANTHONY S. MONTEMARANO
- Technical Director, Data
- Services Directorate
-
-
- 1994 MILNET/DSNET1 Node Site Coordinator Conference
- ========================================================================
- AGENDA
- ========================================================================
- Tuesday, 7 June 1994:
- ========================================================================
-
- 0715: Registration/Administrative Remarks
- 0815: Welcoming/Opening Remarks LtCol Maxwell (USAISC)
- 0830: Conference Format Maj Lent (UTDS)
- 0840: Conference Expectations Maj Lent (UTDS)
- 0900: Break
- 0915: Briefing - DISA/DISO Overview Mr Montemarano (UTD)
- 0945: Break
- 1000: Briefing - DISN Router Overview Mr Montemarano (UTD)
- MILNET - NIPRNET
- DSNET1 - SIPRNET
- ITSDN
- 1045: Lunch
- 1215: Briefing - DDN Downsizing Mr Brewer (UTDD)
- 1300: Break
- 1315: Briefing - DISN Router NSC
- Responsibilities Mr Link (UTDS)
- 1415: Break
- 1430: Briefing - DDN/DISN Course Mr Dutcher (GSI)
- 1450: Break
- 1510: Briefing - DISN Monitoring Center
- Support for Unclassified
- Data Services Mr Cassel (UNR)
- 1545: Wrap-Up Session
- 1615: End of Day 1
- ========================================================================
- Wednesday, 8 June 94:
- ========================================================================
-
- 0800: Briefing - Phase Out of MILNET/NIPR
- Net Plans Mr Brewer (UTDD)
- 0900: Break
- 0920: Briefing - Phase Out of DSNET1/SIPR
- Net Plans Mr Brewer (UTDD)
- 1000: Break
- 1015: Briefing - DISN Router Implementation
- Details - Provisioning
- Procedures Mr Montemarano (UTD)
- 1100: Lunch
- 1215: Briefing - DISN Monitoring Center
- Support for Classified
- Data Services Mr Bartlett (BBN)
- 1315: Break
- 1330: Briefing - Remote Access Terminal
- Service Mr Montemarano (UTD)
-
- 1400: Working Group Session
- NSC Responsibilities
- Mega Center Issues
- DISN Orientation
- 1515: End of Day 2
- ========================================================================
- Thursday, 9 June 1994:
- ========================================================================
- 0800: Working Group Summary
-
- 0820: Briefing - NIC Overview and DISN
- Data Services Support Mr Plzak (GSI)
- 0930: Break
- 0945: Briefing - Information Systems Security Mr Van Wyk (TGGB)
- 1030: Break
- 1040: Conference Summary Maj Lent (UTDS)
- 1050: Action Item Summary Maj Lent (UTDS)
- 1110: O & M Comments CW3 Cepauskas
- Mr Perkins
- Ms Paulding
- 1120: Closing Comments Mr Montemarano (UTD)
- 1130: Conference Presentations Maj Lent (UTDS)
- 1140: End of Conference
- =======================================================================
- Node Site Coordinators' Conference Briefings
- =======================================================================
-
- Briefing: DISA/DISO Overview
- Briefer: Mr Anthony Montemarano (DISA/UTD)
-
- Summary: Briefing provided the attendees with an overview of DISA/DISO
- organization and functional responsibilities. The purpose of
- this presentation was to outline DISA/DISO responsibilities
- as a result of the October 1993 DISO reorganization.
- ========================================================================
-
- Briefing: DISN Router Overview
- Briefer: Mr Anthony Montemarano (DISA/UTD)
-
- Summary: Briefing provided the attendees with an overview of the DISN
- data services transition. The presentation covered the
- evolution of the DDN, current DDN structure, and the planned
- composition of the DISN. Mr Montemarano also addressed the
- basis for transitioning to the router network and the DISA
- philosophy on end-to-end network responsibilities. He noted
- that the phase-out decision was based on the following factors to
- include aging packet switch technology, costs associated with
- the current network, and the desire to standardize protocols.
-
- Main Message: DISA is responsible for developing and implementing
- secure, interoperable and cost effective networking
- solutions to support DoD customers.
- ========================================================================
-
- Briefing: DDN Downsizing
- Briefer: Mr Anthony Brewer (DISA/UTDD)
-
- Summary: Briefing provided the attendees with the plan to downsize the
- MILNET prior to its de-activation. Mr Brewer covered the
- downsizing objective, the determining factors governing
- packet switch node de-activation and a summary of Phase I and
- Phase II downsizing efforts. He indicated that as a result of
- the MILNET topology model revalidation, six nodes were
- approved for de-activation to complete the Phase II program. Due
-
- to trends in MILNET traffic, further downsizing will not be
- accomplished after the Phase II program.
-
- Main Message: MILNET downsizing actions will stop after September 1994.
- Any additional requests from the services for node
- de-activations must be submitted via a front channel
- message for DISA evaluation/action.
- ========================================================================
-
- Briefing: DISN Router Node Site Coordinator Responsibilities
- Briefer: Mr Dave Link (DISA/UTDS)
-
- Summary: Briefing provided the attendees with an overview of NSC
- responsibilities for the DISN router equipment. Mr Link focused
- his presentation on the revised Node Site Coordinators Guide,
- the supplements to guide, and the status of the document
- review. He also discussed coordinator roles and
- responsibilities to include coordinating the installation and
- de-activation of DISN/DDN equipment, ensuring continuous
- operation of the equipment and accomplishing required
- administrative tasks.
-
- Main Message: Node Site Coordinator Guide and supplements are
- currently undergoing revision and coordination. The
- number of node site coordinators will be reduced for the
- DISN, however the basic NSC responsibilities for these
- sites will remain the same.
- ========================================================================
-
- Briefing: The DDN/DISN Course
- Briefer: Mr Bill Dutcher (GSI)
-
- Summary: Briefing provided the attendees with basic information on the
- DDN/DISN Course. Mr Dutcher covered course objectives, target
- audience and course content. Due the transition to the DISN,
- the 1994 course is currently under revision. Course emphasis
- will focus on IP routers, the IDNX backbone network and the TMS
- network management system.
-
- Main Message: The DDN/DISN Course is an excellent orientation for
- the node site coordinator. The course is currently under
- revision, and DISA is coordinating with the services
- to determine 1994 course dates and locations.
- =======================================================================
-
- Briefing: DISN Monitoring Center Support for Unclassified Data Services
- Briefer: Mr Jim Cassell (DISA/UNRR)
-
- Summary: Briefing provided the attendees with information on
- Columbus Monitoring Center activities to support the
- unclassified data router network. Mr Cassel gave an
- overview of the IPR network and focused his presentation on
- routing table management, performance management, and security
- management. He also discussed the network management tools
- used by monitoring center personnel to determine the health
- and performance of the unclassified IPR network.
-
- Main Message: The Columbus Monitoring Center supports over 200,000
- customers at 2,000 locations. Each month, the Monitoring
- Center handles 2,000 calls and over 500 trouble tickets
- to maintain router service to DoD and other government
- agency customers.
- =======================================================================
-
- Briefing: DISN Router Implementation Details - Provisioning Procedures
- Briefer: Mr Anthony Montemarano (DISA/UTD)
-
- Summary: Briefing provided attendees with an overview of the DISN
- transition effort. Mr Montemarano discussed the challenges
- associated with the transition as well as the
- quantitative/qualitative considerations taken to ensure a
- successful transition. He also focused his presentation on the
- phase out of both the Top Secret/SCI network (DSNET3) and the
- Top Secret network (DSNET2). Included in this phase of the
- briefing was a discussion on the Joint Worldwide Intelligence
- Communications System (JWICS) and the Global Command and Control
- System (GCCS). Additionally, Mr Montemarano provided a point
- of contact listing for all DISN transition issues.
-
- Main Message: The objective of the DDN phase out is to remove the DDN
- packet switch node infrastructure and replace it with the
- DISN IPR router infrastructure. The target date for this
- action is Sep 95, and there is an effort to accelerate
- this schedule.
- =======================================================================
-
- Briefing: Phase Out of MILNET/DSNET1 to NIPR/SIPR Net
- Briefer: Mr Anthony Brewer (DISA/UTDD)
-
- Summary: Briefing provided the attendees with more detailed information
- on the phase out of MILNET and DSNET1. Mr Brewer covered the
- phase out approach, strategy, timelines and actions required
- to transition DDN customers on to the IPR router networks. He
- also discussed DISN provisioning as well as provided general
- information on rate schedules.
-
- Main Message: The target date for the de-activation of MILNET and
- DSNET1 is Sep 95. The rate schedule for the new networks
- will be released in June 94, and service transition plans
- are being staffed. DISA and the services must work
- closely to ensure transition actions are complete and
- accomplished smoothly.
- =======================================================================
-
- Briefing: DISN Monitoring Center Support for Classified Data Services
- Briefer: Mr Bob Bartlett (BBN)
-
- Summary: Briefing provided the attendees with information on the CONUS
- Monitoring Center activities to support the classified router
- network. Mr Bartlett presented an overview of Level I, II,
- and III responsibilities. He also addressed fault management
- procedures, configuration management, provisioning and
- performance management activities associated with the SIPR net
- monitoring center. Additionally, the presentation covered
- monitoring center environment and the software tools used to
- effectively manage the SIPR net.
-
- Main Message: The infrastructure to effectively monitor the SIPR Net is
- on line and supporting a growing number of customers.
- =======================================================================
-
- Briefing: Remote Access/Terminal Service
- Briefer: Mr Anthony Montemarano (DISA/UTD)
-
- Summary: Briefing provided the attendees with more detailed information
- on the status of remote access/terminal service capability for
- DISN. Mr Montemarano addressed the issues impacting DISA's
- ability to provide this service for router network customers to
- include hardware compatibility problems, terminal sponsorship
- and security concerns for the classified IPR network.
-
- Main Message: MILNET/DSNET1 can not be phased out without remote
- access/terminal service for the router network. DISA is
- currently staffing actions to provide this capability
- for both the unclassified and classified networks.
- =======================================================================
-
- Briefing: NIC Overview and DISN Data Services Support
- Briefer: Mr Ray Plzak (GSI)
-
- Summary: Briefing provided the attendees with information on Network
- Information Center (NIC) services to include the help desk,
- on-line documentation, user registration and on-line services.
- Mr Plzak also covered the re-registration process as well as TAC
- card policies and procedures. During the transition to the IPR
- router network, the NIC will focus its efforts to replace
- the TAC Access System, and streamlining its processes/procedures.
-
-
- Main Message: The NIC will continue to provide help desk, user
- registration and on-line services to DISN data
- services customers.
- =======================================================================
-
- Briefing: Information Systems Security
- Briefer: Mr Kenneth Van Wyk (DISA/TGGB)
-
- Summary: Briefing provided the attendees an overview of the Automated
- Systems Security Support Team (ASSIST) and the Vulnerability
- Analysis and Assistance Program (VAAP). Mr Van Wyk outlined
- ASSIST team services in the event a DoD customer detects an
- intrusion on their automated system. ASSIST provides customers
- telephonic, on-line and on-site support. He also covered the
- VAAP program that is designed to identify automated system
- vulnerabilities and provide customers with recommendations to
- enhance their security posture.
-
- Main Message: Security is a top priority for both DDN and DISN.
- The ASSIST team and the VAAP program are available to
-
- DoD customers, and they are essential elements in
- strengthening the DoD automated system security posture.
-
- ========================================================================
- Node Site Coordinators' Conference Action Items
- =======================================================================
-
- Action Item: Forward a listing of required publications to node
- site coordinators.
-
- OPR: DISA/UTDS
-
- Status: Open. Action forwarded to UTDS for staffing. UTDS will provide
- a listing to node site coordinators. If a node site
- coordinator determines they are missing a required
- publication, they should notify DISA/UTDS, and the
- document will be forwarded to their office.
-
- ECD: 15 Aug 94
- ======================================================================
-
- Action Item: Provide specific guidance on DISA End-to-End responsibilities
- as they apply to SIPR/NIPR router networks.
-
- OPR: DISA/UTD
-
- Status: Open. Action forwarded to UTD/UTDD for staffing.
-
- ECD: 30 Aug 94
- =======================================================================
-
- Action Item: Funding node site coordinator positions.
-
- OPR: DISA/UTDS
-
- Status: Closed. DISA can not mandate to the services that a node site
- coordinator's position be established or funded. The
- service/agency representatives will continue to explore
- the possibility of funding these positions.
- =======================================================================
-
- Action Item: Disposition of excess equipment; accountability of DISA
- owned COMSEC equipment.
-
- OPR: DISA/UTPI
-
- Status: Open. Action forwarded to UTPI for staffing.
-
- ECD: 30 Aug 94
- =======================================================================
-
- Action Item: Provide specific policy guidance on addressing issues.
-
- OPR: DISA/UTDS/UTDD/CFE
-
- Status: Open. Action forwarded to UTDS for staffing.
-
- ECD: 30 Aug 94
- =======================================================================
-
- Action Item: Provide specific policy guidance on tail end circuit
- responsibilities for the SIPR/NIPR network.
-
- OPR: DISA/UTPI/UTDD
-
- Status. Open. Action forwarded to UTPI/UTDD for staffing.
-
- ECD: 30 Aug 94
- =======================================================================
-
- Action Item: Align IPR router topology with Mega Center locations.
-
- OPR: DISA/UTPI
-
- Status: Open. Action forwarded to UTPI/UTDD for staffing.
-
- ECD: 30 Aug 94.
- =======================================================================
-
- Action Item: Forward draft version of the NSC Guide router supplement.
-
- OPR: DISA/UTDS
-
- Status: Closed. The draft version of the router supplement was
- forwarded to the node site coordinators via DDN
- Management Bulletin 9407, dated 30 June 94. Node
- site coordinators are requested to review the
- document and provide an input to their respective
- service/agency PMO representatives by 21 Jul 94.
- =======================================================================
-
- Action Item: If node site coordinators require lap top computers to
- troubleshoot network problems, is DISA going to provide
- the computer ?
-
- OPR: DISA/UTD/UTDS
-
- Status: Open. Action forwarded to UTD/UTDS for staffing.
-
- ECD: 30 Aug 94
-
-
- =======================================================================
- Node Site Coordinators' Conference Attendee List
- =======================================================================
-
- NAME DUTY LOCATION Command
-
- Alford, Terry Ft Huachuca, AZ Contractor
- Bainbridge, Philip China Lake NAS, CA Navy
- Bartlett, Bob Rosslyn, VA Contractor
- Barsanti, Jeff Chantilly, VA Contractor
- Benko, Mary St Louis, MO Army
- Bennett, Andre Sgt Wright-Patterson AFB, OH Air Force
- Bingham, Ron White Sands, NM Army
- Blair, Linda Great Lakes NS, IL Navy
- Boyle, William Ft Huachuca, AZ Army
- Brewer, Anthony McLean, VA DISA
- Cannady, Roy Eglin AFB, FL Air Force
- Carlsen, Edward MSgt Hurlburt Field, FL Air Force
- Carter, Don Reston, VA DISA
- Cassell, Jim Columbus, OH DISA
- Cepauskas, Edward CW3 Ft Huachuca, AZ Army
- Charles, Martha New Orleans NAS, LA Navy
- Chilson, Earl Pensacola NAS, FL Navy
- Clark, B.G. Norfolk, VA USACOM
- Clark, Charles Ft Carson, CO Army
- Clark, Cornelius Ft Jackson, SC Army
- Cole, William Ft McPherson, GA Army
- Corleis, Robert MSgt Ft Huachuca, AZ Army
- DeJesus, Marc Sgt Ft Huachuca, AZ Army
- Devonshire, Robert Tinker AFB, OK Air Force
- DeWeese, Roger Ft Hood, TX Army
- Dobis, Ronald Picatinny, NJ Army
- Duran, Jose Hill AFB, UT DISA
- Durher, William
- Dutcher, Bill Chantilly, VA Contractor
- Eisenhard, Joanne Quantico, VA Marines
- Farley, Denver Ft Monroe, VA Army
- Faust, Dominick Warminster, PA Contractor
- Fender, Stephen Aberdeen P.G., MD Army
- Fleetwood, Karl TSgt Washington, DC Air Force
- Fordham, Stephen Mechanicsburg, PA DISA
- Galyean, Ron Huntsville, AL Contractor
- Garrett, Eddie MSgt Sheppard AFB, TX Air Force
- Goldsmith, Bill West Point, NY Army
- Hall, Ralph Wheeler AAF, HI DISA
- Harker, Ron Point Magu, CA Navy
- Hartmann, Dan Alameda NAS, CA Navy
- Heim, Patrick MSgt Vaihingen, GE DISA
- Heller, Charlie St Louis, MO Army
- Hines, William Ft Dix, NJ Army
- Holt, Jeffrey Jacksonville NAS, FL Navy
- Hom, Doris Alameda NAS, CA Navy
- Hopson, Arnold Philadelphia, PA Navy
- Jenkins, Roger Warminster, PA Navy
- Jones, Julia Ft Huachuca, AZ Army
- Kelley, Brian Arlington, VA Contractor
- Kupec, Raymond Warminster, PA Contractor
- Lau, Robert Ft Meade, MD Army
- Laurie, Linda Ft Benjamin Harrison, IN Army
- Leach, John St Louis, MO Army
- Lee, Hyrum Wheeler AAF, HI DISA
- Lent, John Maj Arlington, VA DISA
- Link, Dave Arlington, VA DISA
- Lippincott, David Philadelphia, PA DISA
- Magno, Del New Orleans NAS, LA Navy
- Maines, Roy Ft Huachuca, AZ Contractor
- Marshall, Jim White Sands, NM Army
- Martin, Henry RM2 Vaihingen, GE EUCOM
- Maxwell, Otis Ft McPherson, GA Army
- McDaniel, Rodney Arlington, VA DISA
- McGrew, Earlon Peterson AFB, CO Air Force
- McGuiness, Patrick West Point, NY Army
- Merry, G. Gregory Rock Island, IL Army
- Metzner, Mark Dayton, OH DLA
- Mindey, Thomas Ft McPherson, GA Army
- Montemarano, Anthony Arlington, VA DISA
- Myers, Joseph MSgt McClellan AFB, CA Air Force
- Nguyen, Terri Washington, DC Air Force
- Orndorff, George Ft Detrick, MD Army
- Ortiz, Pedro Sgt Kelly AFB, TX Air Force
- Panek, Sherryl Monterey, CA Navy
- Parsons, Michael Randolph AFB, TX Air Force
- Patz, Joseph Ft Ritchie, MD Army
- Paulding, Karen Washington, DC Navy
- Payne, Bryne TSgt Offutt AFB, NE STRATCOM
- Perkins, Ronald Maxwell AFB, AL Air Force
- Plzak, Ray Chantilly, VA Contractor
- Porter, Larry SSgt Ft Huachuca, AZ Army
- Schaaf, Sue Ft Huachuca, AZ Army
- Sheldon, Donald Stennis Space Ctr, MS Navy
- Sieveking, Trudy Ft Huachuca, AZ Army
- Stasik, Valerin
- Swartz, Ed Ft Ritchie, MD Army
- Tatman, Lance Ames, CA Contractor
- Trevino, Ron Ft Huachuca, AZ Army
- Trifero, John Newport NS, RI Navy
- Tucker, Ray Huntsville, AL Contractor
- VanWyk, Kenneth Arlington, VA DISA
- Walker, Jim Corpus Christi NAS, TX Navy
- Warlick, Dave Ft Sam Houston, TX Army
- Watson, Felix Scott AFB, IL Air Force
- Webster, James Washington, DC Navy
- Wiles, Brenda San Diego, CA DMC
- Wilson, Ed Denver, CO DISA
- Wilkins, Shirley Alexandria, VA Army
- Woehl, Donald DP1 Bratenahl, OH DISA
- Wojcik, Jane Cambridge, MA Contractor
- Wooten, Richard Ft Hood, TX Army
- Yuen, Danny Warminster, PA Navy
-
-
-
-
-