Item # D E F I N I T I O N
---------------------------------------------------------------------------
(1) Machine Burden Rate ($/min.) I/P:
Total cost per minute associated with the production machine employed to
be given in Dollars per minute.
(2) Length of Cut (inches) I/P:
Total amount of cutting required on the part in terms of linear distance
or tool travel in direction of feed to be given in inches.
(3) Feed rate (in/min) I/P:
Feed rate of the cutting tool to be given in inches per minute.
(4) Index Time (on job) (min.) I/P:
Time to change or index tools on the machine, given in minutes.
Indexing time in the Tool room is given in item # 15
(5) Tool Life (inches) I/P:
The expected or estimated tool life given in linear inches of travel.
(6) Spindles/Machine (number) I/P:
The number of active spindles on the machine given as a number.
(7) Feed Time/piece (min.) O/P:
Time required to feed the length of cut given in item (2) at the rate
given in item (3) computed in minutes.
(8) Tool Changes/part (number) O/P:
The number of tool changes required to finish the part based on items
(2 & 6) computed as a number.
(9) Total Tool Change Time (min.) O/P:
Total time required to change tools during machining of the part based on
items (4 & 8) computed in minutes.
(10) Machine Cost/load ($) O/P:
Machine cost per load or per part based on item (1 - 7 & 9) computed
in Dollars.
(11) Machine Cost/part ($) O/P:
The total machine cost per load or per part computed in Dollars.
(12) Purchase Price of Tool ($) I/P:
The purchase price of the tool given in Dollars.
(13) Grinds or Indexes/Tool (number) I/P:
The number of grinds or indexes expected for the life of the body of the
tool (including the first) given as a number.
(14) Tool Room Burden rate ($/Min.) I/P:
The combined tool grinding machine and grinding wheel cost given in
Dollars per minute. For Indexable tools this rate is the tool room
burden rate used to figure off-job indexing cost
(15) Re-grinding: Index Time (min.) I/P:
The time required to re-grind (resharpen) or index the tool given in
minutes.
(16) Reset or Brazed Blades (Min.) I/P:
The time required to remove worn carbide blades and braze new ones before
grinding given in minutes.
(17) Re-grinds between Resets (number) I/P:
The number of re-grinds expected from each set of newly re-tipped blades
given in minutes.
(18) Purchase Price/Insert-Blade ($) I/P:
The purchase price of each blade or insert given in Dollars.
(19) Inserts or Blades/Tool (number) I/P:
The number of blades or inserts per tool given as a number.
(20) Re-grinds or Indexes/Insert (number)I/P:
The average number of re-grinds or indexes expected from each blade or an
insert given as a number.
(21) Tool Depreciation Cost ($) O/P:
Tool cost (depreciation) per grind or index based on items (12 & 13)
computed in Dollars.
(22) Tool Re-grinding Cost ($) O/P:
The cost to resharpen or index the tool based on items (14 & 15)
computed in Dollars.
(23) Tool Re-tip Cost ($) O/P:
The cost of re-tipping a set of blades for the tool based on items
(14 - 16 & 17) computed in Dollars.
(24) Insert or Blade Cost ($) O/P:
The blade or insert cost per "FILL" of the tool per re-grind or index
based on items (18 - 19 & 20) computed in Dollars.
(25) Tool Cost/Part ($) O/P:
The total tool cost per part based on items (8 - 21 - 22 - 23 & 24)
computed in Dollars.
(26) Total (machine+tool) Cost/Piece ($)O/P:
The total machine and tool cost per part based on items (11 & 25)
computed in Dollars.
Savings/Piece ($) O/P:
The total machine and tool cost savings per part between one type of
tool and another computed in Dollars.
Annual Production (number) I/P:
The known or estimated number of parts being or to be produced in a
year given as a number.
Annual Savings ($) O/P:
The Total yearly savings in machine and tool costs based on all the input
computed in Dollars.