ocr: BUILDING THE CRANE The lirst section of the crane is Ifixed fimly t0 the Joor. The climbing frane is lowered onto this and the cab 011 top - ofthat. 2Trc hydraulic climbing to frame the uses a top RAISE - ram lift ofthe crane. The crane then raises another section of the / / à * toweri into place. CLIMBING 3m When reached - the the tower required crame height has SECTION TOWER FRAME the climbing frame is removed.