  1. Job Cost v1.12 Micro Data Assist         Registration $ 45.00                            JOB COST
  2. BUSI DEC90 JOB COST MICRO DATA MANAGEMENT PROJECT ESTIMATE
  3. FILES: jobc112a.sdn  jobc112b.sdn
  4.  
  5. New to SDN
  6.  
  7.  
  8. This  'JOB  COST'  system  provides  a  simple  and  straight
  9. forward  method  of  entering   budgets,   capturing   costs,
  10. capturing   estimated  percent  completions,  and  projecting
  11. status of complex projects.  This capability of projection of
  12. status of any single item of budget prior to completion along
  13. with the capability to summarize all items of cost to the job
  14. level and its state of completion allows for  the  correction
  15. of trends that will cause a loss of dollars long before those
  16. trends  have  a  major  impact of the final status of any one
  17. job.
  18.  
  19.  
  20.                     Reports produced include
  21.  
  22. Edit reports for  - Expenses Actually Incurred
  23.  
  24. Summary  of all Jobs - Prints a job status summary report  in
  25. job ID order sequence of all jobs currently on file.
  26.  
  27. Job  Status  Report - by Job and Cost Center for All Jobs, or
  28. a specific job.
  29.  
  30. Job  Recap - Expense posting recap for all Jobs,  a  specific
  31. job, and with or without activity date framing.
  32.  
  33.  
  34.                         SYSTEM HIGHLIGHTS
  35.  
  36. A.  Stand alone system.
  37.  
  38. B.  Completely  menu  driven  for  ease of operation.  Only a
  39. simple  understanding  of  how  to  post  input  from  source
  40. documents needed to run system.
  41.  
  42. C. Provides  for  interactive  viewing of job and cost center
  43. status at any time.
  44.  
  45. D.  Allows for selective reporting of jobs.
  46.  
  47. E. Maintains  detail  transaction  posting  register  of  all
  48. activity by cost center within job.
  49.  
  50. F.   Provides  for  quick  setup  of  new  jobs,  transfer of
  51. completed jobs to history file storage, restore of  completed
  52. jobs to active status from history, and deletion of completed
  53. job and all of its related detail.
  54.  
  55. G.  Automatically  updates Job status of funds available upon
  56. posting of expenses to cost centers.
  57.  
  58. H. Maintains separation of expense by  labor,  material,  and
  59. other  for  each job cost center and summarizes these by cost
  60. center.
  61.  
  62. I.  Maintains separation of original job estimates and change
  63. orders with projection of profit(loss) at each level.
  64.  
  65. J.   The number of jobs, cost centers per job, change  orders
  66. per   job   is   limited  more  by  disk  space  than  system
  67. limitations (99 change orders per job).
  68.  
  69.  
  70.                   SYSTEM REQUIREMENTS
  71.  
  72. OPERATING SYSTEM - MS-DOS 2.1 (or greater).
  73. MEMORY - 640k minimum. 
  74. MONITORY - Color or monochrome.
  75. DISK  -  2 floppy, or one hard disk and one floppy.
  76. PRINTER  - any dot matrix printer  capable  of  printing  130
  77. characters   in   either   normal  or  compress  print  mode.
  78. TERMINAL - terminal with  an  80-column  display  and  direct
  79. cursor addressing capability.
  80.  
  81.  
  82. _____________________________________________________________
  83.  
  84. (SDA format (c)Copyright 1990 The SDN Project - SDNet/Works!)