  1. 2. Support Provision
  2.  
  3. Images: Please ask me for the Faslane Naval Base image via Mike Rawlinson
  4.  
  5. Text: 
  6.  
  7. BAE SYSTEMS is contracted to provide Submarine Maintenance and Support from,  Naval Base
  8.  
  9. Key to support provision is the ability to satisfy stringent safety cases for nuclear submarines to overcome such threats as:- 
  10.  
  11.     Earthquake
  12.     Extreme weather/environmental conditions
  13.         Drop loads/handling error
  14.  
  15. One strategy to address these issues are floating facilities with low level handling capability.
  16.  
  17. 3. Floating Jetty 
  18.  
  19. Images: Use JPG called 'Pontoon'.
  20. Text: 
  21.  
  22. - Floating as Jetty for in-water maintenance
  23.  
  24. - For replenishment and maintenance all equipments inside submarine and limited maintenance outside using divers and other methods where necessary.
  25.  
  26.  
  27.  
  28. 4. Floating Dock
  29.  
  30. Visuals: The 2 MPEG's from Geoff lee's - ADFHeloCam_3Mb & ADFSubCam_3Mb (should be with you by Monday 23rd April).
  31.  
  32. Text: 
  33. - For maintenance - of exterior equipments including cleaning and    
  34. Surface treatment.  Can be delivered by graving dock/floating dock or shiplift 
  35.  