home
***
CD-ROM
|
disk
|
FTP
|
other
***
search
/
100 Years of Barrow-Built RN Submarines
/
100YearsOfBarrow-builtRnSubmarines.iso
/
future.cxt
/
00124_Text_meeting.txt
< prev
next >
Wrap
Text File
|
2001-04-24
|
1KB
|
47 lines
2. Support Provision
Images: Please ask me for the Faslane Naval Base image via Mike Rawlinson
Text:
BAE SYSTEMS is contracted to provide Submarine Maintenance and Support from, Naval Base
Key to support provision is the ability to satisfy stringent safety cases for nuclear submarines to overcome such threats as:-
Earthquake
Extreme weather/environmental conditions
Drop loads/handling error
One strategy to address these issues are floating facilities with low level handling capability.
3. Floating Jetty
Images: Use JPG called 'Pontoon'.
Text:
- Floating as Jetty for in-water maintenance
- For replenishment and maintenance all equipments inside submarine and limited maintenance outside using divers and other methods where necessary.
4. Floating Dock
Visuals: The 2 MPEG's from Geoff lee's - ADFHeloCam_3Mb & ADFSubCam_3Mb (should be with you by Monday 23rd April).
Text:
- For maintenance - of exterior equipments including cleaning and
Surface treatment. Can be delivered by graving dock/floating dock or shiplift
- Floating Dock for out of water maintenance
Many thanks,
Tony
GRS/10598.DL /4