ocr: A11 Read off number of litres required to do the job. Paint Estimator Coats 1 2 3 Length m 4 10 m Itr 1,6 3,2 4,8 wicthHeight m 4 13 m Itr 1,2 2,5 3,7 16 me Itr 1,0 2,0 3,0 Area mr 16 22 0,7 1,5 2,2 Note: : Enter Length and Wicth/Height Can change boxed coverto covering rate on tin. Read off number of litres required to do the job.