  1.          The drawings contain in this Recommendation have been done in Autocad.
  2.                                              SECTION 3
  3.                                     MONITORING AND MEASUREMENTS
  4.          Recommendation Q.791
  5.                       MONITORING AND MEASUREMENTS FOR SIGNALLING SYSTEM No. 7 NETWORKS
  6.          1      General
  7.          1.1    Introduction
  8.          1.1.1  In order to effectively manage the  resources  provided  by  a  Signalling
  9.          System No. 7 network, it is necessary to monitor  and  measure  the  present  and
  10.          estimate  the  future  performance,  utilization,  and  availability   of   these
  11.          resources. Recommendation Q.791 is limited to measurements and monitoring of  the
  12.          MTP and SCCP. The principles and scope of this Recommendation are:
  13.                -   measurements made on the signalling network  resources  are  known  as
  14.                   "raw" or primitive measurements and in general only these  measurements
  15.                   are identified in this Recommendation;
  16.                -   the recommended primitive measurements and  at  times,  other  derived
  17.                   measurements, whose computation using  the  primitive  measurements  is
  18.                   described, are those required  for  the  effective  management  of  the
  19.                   signalling network resources;
  20.                -   a basic subset of signalling network measurements is  recommended  for
  21.                   international networks, but it is intended that  this  subset  also  be
  22.                   useful for national  networks,  which,  however,  may  need  additional
  23.                   measurements;
  24.                -   monitoring and measuring are considered to be  passive  processes  and
  25.                   although the results of monitoring and measuring may be used to  invoke
  26.                   test and maintenance actions  and  procedures,  it  is  left  to  other
  27.                   Recommendations, e.g. Recommendation Q.795, to provide details of  such
  28.                   actions and procedures;
  29.                -   Recommendation Q.791 is not intended  to  provide  signalling  network
  30.                   testing and maintenance procedures; it is left to other Recommendations
  31.                   to provide such procedures, e.g. Recommendations Q.707, Q.795 etc.
  32.          1.2    Local and global view
  33.          1.2.1  The signalling network measurements can provide  both  a  local  view  and
  34.          global network view of the performance of the signalling network.  The  primitive
  35.          measurements which provide the two views are not  necessarily  different.  Rather
  36.          the global view is a result of a summary of measurements from more than a  single
  37.          signalling point so that the behaviour of the  signalling  network  is  centrally
  38.          observable. A global view of  the  performance  of  the  signalling  network,  in
  39.          general, becomes more useful as the network becomes larger (i.e. more  signalling
  40.          points or multiple users).
  41.          1.3    Grouping of measurements
  42.          1.3.1  Each primitive measurement is classified for the purpose of guidance  into
  43.          one or more categories, called operations, maintenance and  administration  which
  44.          will indicate its general area of use (see SS 2 and 5).
  45.          measure 
  46.          measurements includes for each  measurement  an  indication  of  the  appropriate
  47.          categories (operations, administration and  maintenance)  and  reference  to  the
  48.          pertinent Recommendations.
  49.          1.4    Guidelines for uses of measurements
  50.          1.4.1  The measurements  may  be  used  singly,  or  in  conjunction  with  other
  51.          measurements. It  is  not  the  intent  of  the  Recommendation  to  specify  the
  52.          computations  and  algorithms  to  be  applied  to  the  primitive  measurements.
  53.          Guidelines, however, are provided (see ' 5) for  some  uses  of  measurements  so
  54.          that, for example, the view at both ends of an international link is consistent.
  55.  
  56.  
  57.  
  58.  
  59.  
  60.  
  61.  
  62.  
  63.  
  64.  
  65.  
  66.  
  67.  
  68.  
  69.  
  70.          Fascicle VI.9 - Rec. Q.791    PAGE465
  71.  
  72.                2      Definition of terms
  73.          2.1    Operations (O)
  74.          2.1.1  The operation of network resources utilizes measurements that are used  in
  75.          real time, or are  retained  for  short  time  intervals.  Operations  activities
  76.          include signalling network surveillance.
  77.          2.1.2  Signalling network management  "on  occurrence"  events  and  measurements
  78.          include those which monitor  and  measure  the  signalling  network  response  to
  79.          abnormal conditions. (Requires further study.)
  80.          2.1.3  Signalling network surveillance measurements include those  which  monitor
  81.          and measure the signalling network  resources  to  ensure  that  the  appropriate
  82.          network performance is maintained.
  83.          2.2    maintenance (M)
  84.          2.2.1  Maintenance of the signalling network resources may involve the monitoring
  85.          of the facility and equipment resources and maintaining  network  performance  by
  86.          expediting preventive and corrective effort  when  the  measurements  indicate  a
  87.          problem.
  88.          2.3    administration (A)
  89.          2.3.1   The  administration  of  the  signalling   network   resources   involves
  90.          measurements that are used on a long-term  basis  and  are  in  general  retained
  91.          external to the signalling network resources (see Recommendation Q.795, S 2.6).
  92.          2.3.2  Administration activities include planning and dimensioning  (engineering)
  93.          the  signalling  network  resources,  including  determination  of  the  resource
  94.          quantities, e.g. number of links set, and resource configuration, e.g. routing.
  95.          3      Listing of measurements
  96.          3.1    General
  97.          3.1.1  The recommended measurements  are  presented  in  the  Tables  1/Q.791  to
  98.          9/Q.791. Explanatory notes relating to the contents of  these  tables  are  given
  99.          below.
  100.          3.1.2  The obligatory column is used to indicate those measurements which must be
  101.          provided at a signalling point. The additional ACT/PERM column indicates  whether
  102.          these  measurements  are  permanently  activated,  or  activated  on  demand.  In
  103.          non-obligatory cases, if the measurement is  provided,  the  administration  must
  104.          also decide whether the measurement will be activated on demand or be permanently
  105.          active.
  106.          3.1.3  The count  items  in  the  tables,  identified  in  the  units  column  as
  107.          "events/SP", "MSUs/SL" etc., implies the total count of events in  the  specified
  108.          period and implicitly indicates the  identity  of  what  is  being  counted  i.e.
  109.          "events/SP" identifies the Signalling Point, "MSUs/SL" identifies the  Signalling
  110.          Link, etc.
  111.          3.1.4  The event items in the  tables  which  are  recorded  "on  occurence"  are
  112.          intended to be recorded with a time stamp, giving the unique  network  time  when
  113.          the event  indicator  was  generated  (see  Recommendation  Q.795,  S  2.7).  The
  114.          resolution and accuracy of the time stamp should  be  as  high  as  possible,  to
  115.          increase the ability to resolve complex and rapid sequences of events.
  116.          3.1.5  The periods of measurement are specified in the  Duration  of  Measurement
  117.          column.
  118.          3.2    Table 1/Q.791
  119.          H 
  120.          However, the specific cause for the failure  (Items  1.3V1.6)  is  an  additional
  121.          optional measurement.
  122.          3.2.2  The measurement of Snumber of Signal Units received in errorT contains the
  123.          number of items (not necessarily the number of Signal  Units)  between  what  are
  124.          perceived as SFlagsT plus the number of sets of 16 octets received in the  Soctet
  125.          countingT mode.
  126.          3.3    Table 2/Q.791
  127.          3.3.1  Local  busy  is  defined  as  the  period  during  which  busy  LSSUs  are
  128.          transmitted.
  129.          3.4    Table 3/Q.791
  130.          3.4.1  The notation S3/2T in the Level column indicates that the measured  octets
  131.          are those transferred across the Level 3/Level  2  boundary  in  the  appropriate
  132.          direction.
  133.          3.4.2  The opening flag and the check bits are included in Item 3.2
  134.          3.4.3  The signalling link congestion (Items  3.6V3.11)  refers  to  link  status
  135.          ScongestedT at Level 3. A  link  is  marked  at  Level  3  as  congested  when  a
  136.          congestion threshold is reached at the transmit side (see Recommendation Q.704, '
  137.  
  138.  
  139.  
  140.  
  141.          PAGE478 Fascicle VI.9 - Rec. Q.791
  142.  
  143.          3.6 on Signalling  Network  Congestion  and  '  11  on  Signalling  Traffic  Flow
  144.          Control). These measurements should be kept as Sthresholds 1, 2 and 3 separatelyT
  145.          if that national option is selected.
  146.          3.5    Table 4/Q.791
  147.          3.5.1  Measurements 4.9  through  4.12  are  required  at  Signalling  Points  in
  148.          international networks if measurements 5.1 through 5.4 are not  available  to  an
  149.          RPOA. In other networks, measurements 5.1 through 5.4 at  consecutive  Signalling
  150.          Points from origination to  destination  of  a  call  might  be  used  to  derive
  151.          measurements 4.9 through 4.12, consequently real time collection  of  the  latter
  152.          may not be necessary.
  153.          3.5.2  Measurements 4.9 and 4.10 are only obligatory in international networks.
  154.          3.5.3  Measurements 4.5 and 4.6 are only required at Signalling Transfer Points.
  155.          3.6    Table 5/Q.791
  156.          3.6.1  Measurement 5.5, the number of MSUs discarded due to a routing data error,
  157.          can be used to trigger the MTP Route Verification Test (MRVT) described in Q.795,
  158.          ' 2.3.
  159.          3.7    Table 6/Q.791
  160.          3.7.1  Activation of the measurements in Table 6/Q.791 is recommended  on  a  per
  161.          Point Code (PC) or set of Point Codes  and/or  Service  Information  Octet  (SIO)
  162.          basis. The measurements are not obligatory.
  163.          3.7.2  Some of  the  measurements  in  Table  6/Q.791  may  be  of  interest  for
  164.          accounting purposes.
  165.          3.8    Table 7/Q.791
  166.          o 
  167.          of measurements.
  168.          3.9    Table 8/Q.791
  169.          3.9.1  Coordinated State Change Control measurements (Items 8.6 and 8.7)  are  to
  170.          be taken at the signalling point of  the  subVsystem  requesting  to  go  out  of
  171.          service.  These  measurements  are  only  applicable  at  nodes  with  replicated
  172.          subVsystems.
  173.          3.9.2  Unavailability measurements 8.1, 8.2, 8.3, 8.4 and 8.5 are architecturally
  174.          dependent.
  175.  
  176.  
  177.  
  178.  
  179.  
  180.  
  181.  
  182.  
  183.  
  184.  
  185.  
  186.  
  187.  
  188.  
  189.  
  190.  
  191.  
  192.  
  193.  
  194.  
  195.  
  196.  
  197.  
  198.  
  199.  
  200.  
  201.  
  202.  
  203.  
  204.  
  205.  
  206.  
  207.  
  208.  
  209.  
  210.  
  211.  
  212.          Fascicle VI.9 - Rec. Q.791    PAGE465
  213.  
  214.                                            Table 1/Q.791
  215.  
  216.  
  217.                                                 Table 2/Q.791
  218.  
  219.  
  220.                                                 Table 3/Q.791
  221.  
  222.  
  223.                                                 Table 4/Q.791
  224.  
  225.  
  226.                                                 Table 5/Q.791
  227.  
  228.  
  229.                                                 Table 6/Q.791
  230.  
  231.  
  232.                                                 Table 7/Q.791
  233.  
  234.  
  235.                                                 Table 8/Q.791
  236.  
  237.  
  238.                                                 Table 9/Q.791
  239.  
  240.  
  241.          3.10   Table 9/Q.791
  242.          3.10.1 SCCP management messages are included in the totals of items 9.3, 9.4, 9.6
  243.          and 9.7.
  244.          3.10.2 SCCP utilization measurements, items 9.3 and 9.4, refers to  all  messages
  245.          processed by SCCP Routing Control, whether or not the  message  is  processed  or
  246.          delivered successfully.
  247.          3.10.3 Measurement 9.5 measures  the  utilization  of  the  translation  function
  248.          within SCCP Routing Control and is a count of all messages for which global title
  249.          translation is attempted. The  measurement  is  only  applicable  at  nodes  with
  250.          translation capabilities.
  251.          3.10.4 Measurement 9.8 refers only to those messages which  would  normally  have
  252.          been routed to a sub-system but because of a change in  the  translation  process
  253.          (e.g. due to a routing failure towards that sub-system), are directed to a backup
  254.          sub-system.  The  measurement  is  only  applicable  at  replicated  nodes   with
  255.          translation capabilities.
  256.          4      Operations and maintenance part support
  257.          4.1    The measurements  defined  in  this  Recommendation  are  intended  to  be
  258.          controlled through the use of the operations  and  maintenance  application  part
  259.          defined in Recommendation  Q.795.  Recommendation  Q.795  defines  the  functions
  260.          needed to initiate and stop the measurements and the  procedures  to  handle  the
  261.          transfer of data after collection. Long-term  measurement  collection  procedures
  262.          are defined in S  2.6  of  Recommendation  Q.795  and  on-occurrence  measurement
  263.          reporting procedures in S 2.7.
  264.          5      Uses of measurements
  265.          5.1    Introduction
  266.          5.1.1  This section provides a context for the measurements listed in the  Tables
  267.          1/Q.791 to  9/Q.791.  It  describes  briefly  the  operational,  maintenance  and
  268.          administrative activities likely to be associated with a Signalling System No.  7
  269.          network and how the measurements may be used to support these activities.
  270.          5.1.2  A list of supporting measurements (if any) follows each description.  Each
  271.          measurement is identified by its table number followed by a decimal point and the
  272.          sequence number of the measurement within the table (e.g., Item 1.2 is the second
  273.          measurement of Table 1/Q.791).
  274.          5.2    Operational uses
  275.          5.2.1  Message Transfer Part (MTP)
  276.          5.2.1.1   Surveillance of network status
  277.                This activity is concerned with surveillance of the network as a  whole  in
  278.          order to coordinate and assign priorities to maintenance actions. The information
  279.  
  280.  
  281.  
  282.  
  283.          PAGE478 Fascicle VI.9 - Rec. Q.791
  284.  
  285.          to support this activity  will  come  from  indicators  of  the  operational  and
  286.          congestion status. These indicators may be found  in  the  tables  designated  as
  287.          Usage "O" and duration of measurement "on-occurrence".
  288.                Measurements to survey network status:
  289.                -   local automatic changeover (Item 1.10);
  290.                -   local automatic changeback (Item 1.11);
  291.                -   start of remote processor outage (Item 2.10);
  292.                -   stop of remote processor outage (Item 2.11);
  293.                -   SL congestion indications (Item 3.6);
  294.                -   stop of SL congestion (Item 3.9);
  295.                -   number of congestion events resulting in loss of MSUs (Item 3.11);
  296.                -   start of linkset failure (Item 4.3);
  297.                -   stop of linkset failure (Item 4.4);
  298.                -   initiation of Broadcast TFP due to failure of measured  linkset  (Item
  299.                   4.5);
  300.                -   initiation of Broadcast TFA for recovery  of  measured  linkset  (Item
  301.                   4.6);
  302.                -   start of unavailability in measurement 4.9 (Item 4.11);
  303.                -   stop of unavailability in measurement 4.9 (Item 4.12);
  304.                -   adjacent signalling point inaccessible (Item 5.1);
  305.                -   stop of adjacent signalling point inaccessible (Item 5.4).
  306.                Additional  measurement  may  be  provided  to  the  operations  user   for
  307.          determining the integrity of the network. These measurements will be provided  on
  308.          a five or thirty minute basis.
  309.                Measurements:
  310.                -   duration of link in the in-service state (Item 1.1);
  311.                -   duration of SL unavailability (for any reason) (Item 2.1);
  312.                -   local management inhibit (Item 2.13);
  313.                -   local management uninhibit (Item 2.14);
  314.                -   duration of local busy (Item 2.15);
  315.                -   number of SIF and SIO octets received (Item 3.4);
  316.                -   unavailability  of  route  set  to  a  given  destination  or  set  of
  317.                   destinations (Item 4.9);
  318.                -   duration of adjacent signalling point inaccessible (Item 5.2).
  319.          5.2.1.2   Monitoring of link and network traffic performance
  320.                This activity is concerned with ensuring  that  congestion  thresholds  and
  321.          the numbers of discarded messages are within specification. If, for example,  the
  322.          number of Message Signal Units (MSUs) discarded  due  to  a  routing  data  error
  323.          exceeds limits, the Routing Verification Test described in  Recommendation  Q.795
  324.          could be initiated to identify the source and type of routing data error.
  325.                Discarded message counts may be gathered  signalling  point  by  signalling
  326.          point and added together to a give a total network performance measure.
  327.                One aspect of traffic performance can be monitored by measuring the  amount
  328.          of time that a given link is congested. The link loading or  congestion  duration
  329.          must match the criteria upon which provisioning of links has been based.
  330.                Measurements to monitor links:
  331.                -   number of Signalling Information Field (SIF) and  Service  Information
  332.                   Octet (SIO) octets transmitted (Item 3.1);
  333.                -   SL congestion indications (Item 3.6);
  334.                -   cumulative duration of SL congestion (Item 3.7).
  335.                Measurements of MSUs discarded:
  336.  
  337.  
  338.  
  339.  
  340.  
  341.  
  342.  
  343.  
  344.  
  345.  
  346.  
  347.  
  348.  
  349.  
  350.  
  351.  
  352.  
  353.  
  354.          Fascicle VI.9 - Rec. Q.791    PAGE465
  355.  
  356.                -   due to SL congestion (Item 3.10);
  357.                -   due to routing data error (Item 5.5).
  358.                Duration measurements measure the effects of signalling link set and  route
  359.          set availability, by individual  link  set  and  route  set.  These  measurements
  360.          identify the effects of congestion or failure upon the surrounding network.
  361.                Measurements:
  362.                -   duration of link in the in-service state (Item 1.1);
  363.                -   duration of SL unavailability (for any reason) (Item 2.1);
  364.                -   duration of SL unavailability due to  remote  processor  outage  (Item
  365.                   2.9);
  366.                -   duration of local busy (Item 2.15);
  367.                -   cumulative duration of SL congestion (Item 3.7);
  368.                -   duration of unavailability of signalling linkset (Item 4.2);
  369.                -   duration of unavailability in measurement 4.9 (Item 4.10);
  370.                -   duration of adjacent signalling point inaccessible (Item 5.2).
  371.          5.2.2  Signalling Connection Control Part (SCCP)
  372.          5.2.2.1   SCCP Routing Performance
  373.                The monitoring of routing failures  allows  SCCP  Routing  and  Translation
  374.          function to detect any abnormal  number  of  messages  which  cannot  be  routed,
  375.          independent of the originator being informed through message return.
  376.                Measurements:
  377.                Routing Failure due to:
  378.                -   no translation for address of such nature (Item 7.1);
  379.                -   no translation for this specific address (Item 7.2);
  380.                -   network failure (point code not available) (Item 7.3);
  381.                -   network congestion (Item 7.4);
  382.                -   sub-system failure (unavailable) (Item 7.5);
  383.                -   sub-system congestion (Item 7.6);
  384.                -   unequipped user (sub-system) (Item 7.7);
  385.                -   reason unknown (Item 7.9).
  386.                In addition, the following measurements can be used as a consistency  check
  387.          or a network protection mechanism:
  388.                -   UDTS messages sent (Item 9.1);
  389.                -   UDTS messages received (Item 9.2);
  390.          5.2.2.2   SCCP unavailability
  391.                The  monitoring  of  SCCP  unavailability   may   prove   useful   in   the
  392.          activation/deactivation of other network measurements.
  393.                Measurements:
  394.                Start of Local SCCP unavailable due to:
  395.                -   failure (Item 8.1);
  396.                -   maintenance made busy (Item 8.2);
  397.                -   congestion (Item 8.3),
  398.  
  399.  
  400.  
  401.  
  402.  
  403.  
  404.  
  405.  
  406.  
  407.  
  408.  
  409.  
  410.  
  411.  
  412.  
  413.  
  414.  
  415.  
  416.  
  417.  
  418.  
  419.  
  420.  
  421.  
  422.  
  423.  
  424.  
  425.          PAGE478 Fascicle VI.9 - Rec. Q.791
  426.  
  427.                Stop of local SCCP unavailable;
  428.                -   all reasons (Item 8.4).
  429.          5.2.3  Telephony User Part
  430.                For further study.
  431.          5.2.4  Integrated Services Digital Network User Part (ISDN-UP)
  432.                For further study.
  433.          5.2.5  Transaction Capabilities Application Part (TCAP)
  434.                For further study.
  435.          5.3    Maintenance uses
  436.                The activities described in this section relate basically to the  detection
  437.          of degraded performance and to the maintenance of a particular  signalling  point
  438.          and the signalling links associated with that signalling point. They may be  used
  439.          on a near real time basis, or may be monitored over a period of days or weeks  to
  440.          detect unfavourable trends. They are designed so that one  signalling  point  can
  441.          monitor its own status without relying on measurements from  adjacent  signalling
  442.          points.
  443.          5.3.1  Message Transfer Part (MTP)
  444.          5.3.1.1   Detection of increases in link SU error rates
  445.                This activity ensures that the signalling  data  link  error  rate  is  not
  446.          rising beyond specification. The SU Error Rate Monitor is  the  basic  instrument
  447.          for monitoring signalling data link performance. Basic traffic counts are used to
  448.          normalize  performance  measurements  in  order  to  compare  system  performance
  449.          measurements.
  450.                Measurements:
  451.                -   number of SIF and SIO octets transmitted (Item 3.1);
  452.                -   number of SIF and SIO octets received (Item 3.4).
  453.                Operational  measurements  counting  error  events  provide   supplementary
  454.          information to warn of  impending  failures  or  give  a  running  assessment  of
  455.          signalling data link quality.
  456.                Measurements:
  457.                -   number of Signal Units (SUs) in error (monitors incoming  performance)
  458.                   (Item 1.8);
  459.                -   number of Negative Acknowledgements (NACKs) received (monitors outgoing 
  460.                   performance) (Item 1.9).
  461.                Counting total Signal Unit errors allows the estimation of Signalling  Data
  462.          Link bit error rates (see Recommendation Q.706, S 3.1) assuming that  errors  are
  463.          random. The estimate uses measurements 1.1 duration of  link  in  the  in-service
  464.          state, multiplied by the link transmission rate.
  465.                Measurements:
  466.                -   duration of link in the in-service state (Item 1.1);
  467.                -   duration of link unavailability (any reason) (Item 2.1).
  468.          5.3.1.2   Detection of marginal links performance
  469.                The SU Error Rate Monitor applies to lost alignment as  well  as  corrupted
  470.          data.  Usually  both  conditions  are  caused  by  degraded  performance  of  the
  471.          transmission facility. Alignment and proving failures often indicate a marginally
  472.          performing link.
  473.                Measurements:
  474.                -   SL alignment failure (Item 1.7)
  475.                This activity is concerned with detecting routing instabilities caused  by
  476.                   marginal link performance.
  477.                Measurements:
  478.                -   local automatic changeover (Item 1.10);
  479.                -   local automatic changeback (Item 1.11);
  480.                -   SL congestion indications (Item 3.6);
  481.                -   cumulative duration of SL congestion (Item 3.7);
  482.                -   number of congestion events resulting in loss of MSUs (Item 3.11).
  483.          5.3.1.3   Detection of link failure events in either direction
  484.                By "link failure" is meant an event which causes a particular  link  to  be
  485.          unavailable for signalling (i.e. a failure at Level 1  or  Level  2).  Signalling
  486.          link failures  are  detected  in  order  to  require  preventive  and  corrective
  487.          maintenance actions to restore the network capabilities. This maintenance  action
  488.          can be required on a single failure event or when the number of signalling  links
  489.          in failure for a link set or across different link sets exceeds a threshold.
  490.                Signalling link failure measurements are summarized not only  for  specific
  491.          links sets, but also across many different link sets,  where  these  may  involve
  492.  
  493.  
  494.  
  495.  
  496.          Fascicle VI.9 - Rec. Q.791    PAGE465
  497.  
  498.          common transmission systems or signalling points. The distribution of failure and
  499.          degradation sources may be randomly located, but  if  specific  network  elements
  500.          appear to be common to a large number of the failures, then they are suspect as a
  501.          significant failure source requiring further maintenance action.
  502.                Measurements:
  503.                -   number of link failures:
  504.                       all reasons (Item 1.2);
  505.                       abnormal FIBR/BSNR (Item 1.3);
  506.                       excessive delay of acknowledgement (Item 1.4);
  507.                       excessive error rate (Item 1.5);
  508.                       excessive duration of congestion (Item 1.6);
  509.                -   signalling link restoration (Item 1.12).
  510.          5.3.1.4   Detection of routing and distribution table errors
  511.                In operation, the Signalling System No. 7  routing  data  will  be  updated
  512.          frequently as the network changes. It is necessary to keep  track  of  signalling
  513.          point status and routing problems on a routine basis (see Recommendation Q.795, S
  514.          2.1)
  515.                Measurements:
  516.                -   duration of unavailability of signalling linkset (Item 4.2);
  517.                -   start of linkset failure (Item 4.3);
  518.                -   stop of linkset failure (Item 4.4);
  519.                -   initiation of Broadcast TFP due to failure of measured  linkset  (Item
  520.                   4.5);
  521.                -   initiation of Broadcast TFA for recovery  of  measured  linkset  (Item
  522.                   4.6);
  523.                -   unavailability  of  route  set  to  a  given  destination  or  set  of
  524.                   destinations (Item 4.9);
  525.                -   duration of unavailability in measurement 4.9 (Item 4.10);
  526.                -   start of unavailability in measurement 4.9 (Item 4.11);
  527.                -   stop of unavailability in measurement 4.9. (Item 4.12);
  528.                -   adjacent SP inaccessible (Item 5.1);
  529.                -   duration of adjacent SP inaccessible (Item 5.2);
  530.                -   stop of adjacent SP inaccessible (Item 5.4);
  531.                -   MSUs discarded due to a routing data error (Item 5.5).
  532.          5.3.1.5   Component reliability and maintainability studies
  533.                These  studies  are  concerned  with  calculating  the  mean  time  between
  534.          failures (MTBF) and mean time to repair (MTTR) for each type of component in  the
  535.          Signalling System No. 7 network. It may be useful for some purposes to have  MTBF
  536.          and MTTR data by Signalling  System  No.  7  function  with  which  to  correlate
  537.          associated maintenance action.
  538.                Measurements:
  539.                -   number of link failures;
  540.                       all reasons (Item 1.2);
  541.                       abnormal FTBR/BSNR (Item 1.3);
  542.                       excessive delay of acknowledgement (Item 1.4);
  543.                       excessive error rate (Item 1.5);
  544.                       excessive duration of congestion (Item 1.6);
  545.                -   duration of SL inhibition due to local management actions (Item 2.5);
  546.  
  547.  
  548.  
  549.  
  550.  
  551.  
  552.  
  553.  
  554.  
  555.  
  556.  
  557.  
  558.  
  559.  
  560.  
  561.  
  562.  
  563.  
  564.  
  565.  
  566.  
  567.          PAGE478 Fascicle VI.9 - Rec. Q.791
  568.  
  569.                -   duration of SL inhibition due to remote management actions (Item 2.6);
  570.                -   duration of SL unavailability due to link failure (Item 2.7);
  571.                -   duration of SL unavailability due to  remote  processor  outage  (Item
  572.                   2.9);
  573.                -   start of remote processor outage (Item 2.10);
  574.                -   stop of remote processor outage (Item 2.11);
  575.                -   local management inhibit (Item 2.13);
  576.                -   local management uninhibit (Item 2.14).
  577.          5.3.2  Signalling connection control part (SCCP)
  578.          5.3.2.1   SCCP routing performance
  579.                       interwo 
  580.                          interworking difficulties.
  581.                Measurements:
  582.                Routing failures:
  583.                V   no translation for address of such nature (Item 7.1);
  584.                V   no translation for this specific address (Item 7.2);
  585.                V   network failure (point code not available) (Item 7.3);
  586.                V   network congestion (Item 7.4);
  587.                V   subVsystem failure (unavailable) (Item 7.5);
  588.                V   subVsystem congestion (Item 7.6);
  589.                V   unequipped user (subVsystem) (Item 7.7);
  590.                V   reason unknown (Item 7.9).
  591.                Protocol interworking:
  592.                V   syntax error detected (Item 7.8).
  593.          5.3.2.2   SCCP availability
  594.                It is useful to monitor  the  effectiveness  of  Coordinated  State  Change
  595.          Control.
  596.                Measurements:
  597.                V   subVsystem out of service request granted (Item 8.6);
  598.                V   subVsystem out of service request denied (Item 8.7).
  599.          5.3.3  Telephony user part
  600.                For further study.
  601.          5.3.4  Integrated services digital network user part (ISDNVUP)
  602.                For further study.
  603.          5.3.5  Transaction capabilities application part (TCAP)
  604.                For further study.
  605.          5.4    Administrative uses
  606.          5.4.1  Message transfer part (MTP)
  607.          5.4.1.1   Monitoring of link and signalling point utilization
  608.                MTP utilization measurement is concerned with evaluating message  flows  to
  609.          ensure that they are not beginning to exceed stated  link  and  signalling  point
  610.          capacities. It also ensures that existing routing is resulting  in  proportionate
  611.          utilization of available capacity.
  612.                Measurements by link:
  613.  
  614.  
  615.  
  616.  
  617.  
  618.  
  619.  
  620.  
  621.  
  622.  
  623.  
  624.  
  625.  
  626.  
  627.  
  628.  
  629.  
  630.  
  631.  
  632.  
  633.  
  634.  
  635.  
  636.  
  637.  
  638.          Fascicle VI.9 - Rec. Q.791    PAGE465
  639.  
  640.                V   duration of link in the inVservice state (Item 1.1);
  641.                V   duration of SL unavailable (for any reason) (Item 2.1);
  642.                V   number of SIF and SIO octets transmitted (Item 3.1);
  643.                V   octets retransmitted (Item 3.2);
  644.                V   number of message signal units transmitted (Item 3.3);
  645.                V   number of SIF and SIO octets received (Item 3.4);
  646.                V   number of message signal units received (Item 3.5);
  647.                V   SL congestion indications (Item 3.6);
  648.                V   cumulative duration of SL congestions (Item 3.7).
  649.                Measurements by signalling point:
  650.                V   number of SIF and SIO octets received:
  651.                       with given Origination Point Code (OPC) (Item 6.1);
  652.                       with given OPC and SIO (Item 6.4);
  653.                V   number of SIF and SIO octets transmitted:
  654.                       with given Destination Point Code (OPC) (Item 6.2);
  655.                       with given DPC and SIO (Item 6.5);
  656.                -   number of SIF and SIO octets handled:
  657.                       with given SIO (Item 6.3);
  658.                       with given OPC, DPC, and SIO (item 6.6).
  659.                Measurements by signalling route set:
  660.                -   unavailability  of  route  set  to  a  given  destination  or  set  of
  661.                   destinations (Item 4.9);
  662.                -   duration of unavailability in measurement 4.9 (Item 4.10);
  663.                -   MSUs discarded due to routing data error (Item 5.5).
  664.          5.4.2  Signalling connection control part (SCCP)
  665.          5.4.2.1   SCCP utilization
  666.                Network administration is interested in  monitoring  SCCP  utilization  for
  667.          use in analyzing the current network and designing future network configurations.
  668.          One way to monitor SCCP utilization is to measure the amount of SCCP traffic.
  669.                Measurements:
  670.                SCCP traffic received:
  671.                       UDTS messages (Item 9.2);
  672.                       total messages (for connectionless only)
  673.                       (classes 0 & 1) (Item 9.7).
  674.                SCCP traffic sent:
  675.                       UDTS messages (Item 9.1);
  676.                       total messages (for connectionless only)
  677.  
  678.  
  679.  
  680.  
  681.  
  682.  
  683.  
  684.  
  685.  
  686.  
  687.  
  688.  
  689.  
  690.  
  691.  
  692.  
  693.  
  694.  
  695.  
  696.  
  697.  
  698.  
  699.  
  700.  
  701.  
  702.  
  703.  
  704.  
  705.  
  706.  
  707.  
  708.  
  709.          PAGE478 Fascicle VI.9 - Rec. Q.791
  710.  
  711.                       (classes 0 & 1) (Item 9.6).
  712.                General:
  713.                -   total messages handled (from local or remote sub-systems) (Item 9.3);
  714.                -   total messages intended for local sub-systems (Item 9.4);
  715.                -   total messages requiring global title translation (Item 9.5);
  716.                -   messages sent to a backup sub-system (Item 9.8).
  717.          5.4.2.2   SCCP routing performance
  718.                Network Administration is also interested  in  tracking  long-term  message
  719.          routing performance of  the  SCCP.  This  can  be  obtained  from  the  following
  720.          measurements or their sum.
  721.                Measurements:
  722.                SCCP Routing failures:
  723.                -   no translation for address of such nature (Item 7.1);
  724.                -   no translation for this specific address (Item 7.2);
  725.                -   network failure (point code not available) (Item 7.3);
  726.                -   network congestion (Item 7.4);
  727.                -   sub-system failure (unavailable) (Item 7.5);
  728.                -   sub-system congestion (Item 7.6);
  729.                -   unequipped user (sub-system) (Item 7.7);
  730.                -   reason unknown (Item 7.9).
  731.                SCCP unavailability:
  732.                -   duration of local SCCP unavailable (all reasons) (Ref. 8.5).
  733.          5.4.3  Telephony user part
  734.                For further study.
  735.          5.4.4  Integrated services digital network user part (ISDN-UP)
  736.                For further study.
  737.          5.4.5  Transaction capabilities application part (TCAP)
  738.                For further study.
  739.          5.5    Preparation of traffic forecasts
  740.          5.5.1  This activity is concerned with the calculation of values  which  will  be
  741.          entered  into  provisioning  tables  to  determine  future  equipment  quantities
  742.          required. The data to be used are those already collected to  support  activities
  743.          mentioned in SS 5.2.1.2 and 5.4.1.1. Depending upon implementation, more detailed
  744.          measurements may be required to provision  such  items  as  internal  buffers  or
  745.          number of processors where these may vary.
  746.          5.6    Network planning
  747.          5.6.1  This activity requires longer-term traffic forecasts, based as  much  upon
  748.          marketing intentions as upon extrapolations of existing  patterns.  Nevertheless,
  749.          to understand existing patterns, planners need knowledge of traffic  origins  and
  750.          destinations.
  751.          5.6.2  The measurements in Table 6/Q.791 and  Table  9/Q.791  indicate  how  much
  752.          traffic is being originated at  the  measured  signalling  point,  and  how  much
  753.          traffic has that signalling point as a destination. These measurements are useful
  754.          for calculating traffic flows by origination/destination pair.
  755.          5.6.3  In reality, however, traffic  flows  do  not  spread  randomly  through  a
  756.          network. For each origin, distance and other factors result in a concentration of
  757.          flows to favoured destinations. As a result, it  will  be  necessary  to  measure
  758.          flows on the network by destination.
  759.          5.6.4  Given the large potential number of destinations, measurements may have to
  760.          be grouped (see explanatory notes for Table 6/Q.791 and Table 9/Q.791 in S 3).
  761.          5.7    Evaluation of maintenance force effectiveness
  762.                This activity consists of managerial control of the  maintenance  function,
  763.          through examination of failure trends, equipment availabilities and the amount of
  764.          outage due to manual as opposed to automatic busying of components. The  activity
  765.          is usually carried out with the aid of indices based upon data listed in S 5.3.
  766.  
  767.  
  768.  
  769.  
  770.  
  771.  
  772.  
  773.  
  774.  
  775.  
  776.  
  777.  
  778.  
  779.  
  780.          Fascicle VI.9 - Rec. Q.791    PAGE465