home
***
CD-ROM
|
disk
|
FTP
|
other
***
search
/
Internet Standards
/
CD2.mdf
/
ccitt
/
1992
/
q
/
q782_9.asc
< prev
next >
Wrap
Text File
|
1991-12-31
|
31KB
|
1,873 lines
MTP LEVEL 3
TEST NUMBER: 7.15 PAGE: 1 of 1
REFERENCE:Q.704 S 10, Fig. 28
TITLE: Management inhibiting
SUB TITLE: Automatic uninhibition with two links inhibited
PURPOSE: To check the actions of the system when two links are inhibited and when the
third (and last) link is deactivated
PRE-TEST CONDITIONS: Links 1 - 1 and 1 - 2 inhibited (by A) and link 1 - 3 available
CONFIGURATION: A TYPE OF TEST: VAT TYPE OF SP: ALL
MESSAGE SEQUENCE:
SP A SP B
Link Link
:Start traffic
1 - TRAFFIC ----------------------
3 --->
PAGE322 Fascicle VI.9 - Rec. Q.782
<---------------------- 1 - TRAFFIC
-- 3
1 - :Deactivate
3 (failure)
1 - LUN, SLC 1 - 1 ----------------------
X --->
and/ LUN, SLC 1 - 2 ----------------------
or --->
(implementation dependent: at least one link must be uninhibited)
<---------------------- 1 - LUA, SLC 1 - 1,
-- X and/or
Fascicle VI.9 - Rec. Q.782 PAGE331
<---------------------- 1 - LUA, SLC 1 - 2
-- X
POINT RESTART PROCEDURE IS APPLIED IN A AND B (see note in 7.9)
1 - TRAFFIC ----------------------
1 --->
and/ <---------------------- 1 - TRAFFIC
or -- 1
1 - TRAFFIC ---------------------- and/
2 ---> or
<---------------------- 1 - TRAFFIC
-- 2
:Wait
:Stop traffic
TEST DESCRIPTION
PAGE322 Fascicle VI.9 - Rec. Q.782
1. Deactivate link 1 - 3.
2. Check that at least one LUN is received and acknowledged with an LUA.
3. Check that the traffic is restarted on linkset 1. Some messages have been lost.
4. Stop traffic.
Fascicle VI.9 - Rec. Q.782 PAGE331
MTP LEVEL 3
TEST NUMBER: 7.16 PAGE: 1 of 1
REFERENCE:Q.704 S 10,
Fig. 28
TITLE:Management
inhibiting
SUB TITLE:Reception of traffic on an
inhibited link
PURPOSE:To check the actions of the system on reception of traffic on an
inhibited link
PRE-TEST CONDITIONS: Link 1 - 1 inhibited by A, link 1 - 2 available
CONFIGURATION: A TYPE OF TEST: VAT TYPE OF SP: ALL
MESSAGE SEQUENCE:
SPA SP B
Link Link
:Start traffic
1 - 2TRAFFIC -----------------
PAGE322 Fascicle VI.9 - Rec. Q.782
-------->
<----------------- 1 - 2 TRAFFIC
--------
<----------------- 1 - 1 TRAFFIC
--------
:Wait
:Stop traffic
TEST DESCRIPTION
1. Start traffic on link 1 - 1.
2. Send traffic from B to A on the inhibited link 1 - 2. Check that the
messages received in A are normally treated.
3. Stop traffic.
Fascicle VI.9 - Rec. Q.782 PAGE331
MTP LEVEL 3
TEST NUMBER: 7.17.1 PAGE: 1 of 3
REFERENCE:Q.704 S 10, Fig. 28
TITLE: Management inhibiting
SUB TITLE: Management inhibiting test - Normal procedure
PURPOSE: To check that the system performs correctly the management inhibiting test
PRE-TEST CONDITIONS: Link 1-1 inhibited by A, other links are available
CONFIGURATION: A TYPE OF TEST: VAT, CPT TYPE OF SP: ALL
MESSAGE SEQUENCE:
SP A SP B
Link Link
1 - X | LLT, SLC 1 - -------------
1 >
|
PAGE322 Fascicle VI.9 - Rec. Q.782
<------------- 1 - X | LRT, SLC 1 - 1
| |
| T22 |
| | T23
| |
-- |
Fascicle VI.9 - Rec. Q.782 PAGE331
--
1 - X | LLT, SLC 1 - -------------
1 >
| <------------ 1 - X | LRT, SLC 1 - 1
-
| |
| |
|
PAGE322 Fascicle VI.9 - Rec. Q.782
|
|
TEST DESCRIPTION
1. Check that an LLT is periodically sent by A and check (in VAT) that the
duration of timer T22 is inside the specified range.
2. Check that on the reception of an LRT, no action is taken in A.
3. As compatibility test, check that an LRT is periodically sent from B to A.
Fascicle VI.9 - Rec. Q.782 PAGE331
MTP LEVEL 3
TEST NUMBER: 7.17.1 PAGE: 2 of 3
Continued
REFERENCE:Q.704 S 10,
Fig. 28
TITLE:Management inhibiting
SUB TITLE:Inhibit test procedure - Normal procedure
PURPOSE: See page 1
PRE-TEST CONDITIONS: Link 1 - 1 inhibited by B, other links are available
CONFIGURATION: A TYPE OF TEST: VAT, CPT TYPE OF SP: ALL
MESSAGE SEQUENCE:
SPA SP B
Link Link
1 - XLRT, SLC 1 - 1 ------------->
╜ <------------- 1 - X LLT, SLC 1 - 1
╜ T22 ╜
╜ ╜ T23
^ ╜
^
1 - XLRT, SLC 1 - 1 ------------->
PAGE322 Fascicle VI.9 - Rec. Q.782
╜ <------------- 1 - X LLT, SLC 1 - 1
╜ T22 ╜
╜ ╜ T22
TEST DESCRIPTION
1. Check that an LRT is periodically sent by A and, in VAT, check that the
duration of the timer T23 is inside the specified range.
2. Check that, on the reception of an LLT, no action is taken in A.
3. As compatibility test, check that an LLT is periodically sent from B to A.
Fascicle VI.9 - Rec. Q.782 PAGE331
MTP LEVEL 3
TEST NUMBER: 7.17.1 PAGE: 3 of 3
Continued
REFERENCE:Q.704 S 10,
Fig. 28
TITLE:Management
inhibiting
SUB TITLE:Inhibit test procedure - Normal procedure
PURPOSE: See page 1
PRE-TEST CONDITIONS:Link 1 - 1 inhibited by A and B. The other links are
available
CONFIGURATION: A TYPE OF TEST: VAT, CPT TYPE OF SP: ALL
MESSAGE SEQUENCE:
SPA SP B
Link Link
PAGE322 Fascicle VI.9 - Rec. Q.782
1 - X LRT, SLC 1 - -------- 1 - LLT, SLC 1 -
1 -----> X 1
╜ <-------- ╜
-----
1 - X LRT, ╜SLC 1 - 1 --------- ╜
---->
╜ ╜ <-------- 1 - ╜T23 LLT, SLC 1 -
╜ ╜T22 ----- X ^ 1
╜ ^ ╜
T23 ╜T22
1 - X
Fascicle VI.9 - Rec. Q.782 PAGE331
^ LLT, SLC 1 - --------- 1 - LRT, ╜SLC 1 - 1
1 ----> X ^
<--------
----- LTT, SLC 1 -
1
1 - X LRT, ╜SLC 1 - 1 --------- ╜ ╜
╜ ╜ ----> 1 - ╜ ╜T22
╜ ╜T22 <-------- X ╜T23 ╜
╜T23 -----
╜
PAGE322 Fascicle VI.9 - Rec. Q.782
TEST DESCRIPTION
1. Check that the LLT and LRT messages are periodically sent from A to B and
from B to A.
MTP LEVEL 3
TEST NUMBER: 7.17.2 PAGE: 1 of 1
REFERENCE:Q.704 S 10,
Fig. 28
TITLE:Management inhibiting
SUB TITLE:Inhibit test procedure - Reception of an LLT or LRT on an uninhibited link
PURPOSE: To check the actions of the system on reception of an LLT or LRT on an
uninhibited link
PRE-TEST CONDITIONS: ink 1 - 1 available
CONFIGURATION: A TYPE OF TEST: AT TYPE OF SP: LL
MESSAGE SEQUENCE:
SPA SP B
Fascicle VI.9 - Rec. Q.782 PAGE331
Link Link
<------------------------- 1 - 1 LLT, SLC 1 - 1
1 - 1LFU, SLC 1 - 1 ------------------------->
╜
╜ T13
╜ <------------------------- 1 - 1 LUN, SLC 1 - 1
^
1 - 1LUA, SLC 1 - 1 ------------------------->
<------------------------- 1 - 1 LRT, SLC 1 - 1
1 - 1LUN, SLC 1 - 1 ------------------------->
╜
╜ T12
╜
^
<------------------------- . 1 - 1 LUA, SLC 1 - 1
TEST DESCRIPTION
PAGE322 Fascicle VI.9 - Rec. Q.782
1. Send an LLT from B to A and check that an LFU is received. Then, send an LUN
and check that an LUA is received.
2. Send an LRT from B to A and check that an LUN is received. Answer with an
LUA.
MTP LEVEL 3
TEST NUMBER: 7.17.3 PAGE: 1 of 1
REFERENCE:Q.704 S 10,
Fig. 28
TITLE:Management
inhibiting
SUB TITLE:Inhibit test procedure - Reception of an LLT on a link locally inhibited
PURPOSE: To check the actions of the system on reception of an LLT on a link locally
(not remotely) inhibited
PRE-TEST CONDITIONS: Link 1 - 1 inhibited in A, other links are available
CONFIGURATION: A TYPE OF TEST: VAT TYPE OF SP: ALL
MESSAGE SEQUENCE:
SPA SP B
Link
Fascicle VI.9 - Rec. Q.782 PAGE331
Link
<------------------------- 1 - X LLT, SLC 1 - 1
1 - XLFU, SLC 1 - 1 ------------------------->
╜
╜ T13
╜
^
<------------------------- 1 - X LUN, SLC 1 - 1
1 - XLUA, SLC 1 - 1 <-------------------------
TEST DESCRIPTION
1. Send an LLT from B to A and check that an LFU is received as described
above.
PAGE322 Fascicle VI.9 - Rec. Q.782
MTP LEVEL 3
TEST NUMBER: 7.17.4 PAGE: 1 of 1
REFERENCE:Q.704 S 10,
Fig. 28
TITLE:Management inhibiting
SUB TITLE:Inhibit test procedure - Reception of an LRT on a link remotely inhibited
PURPOSE: To check the actions of the system on reception of an LRT on a link remotely
inhibited
PRE-TEST CONDITIONS: Link 1 - 1 inhibited by B, other links are available
CONFIGURATION: A TYPE OF TEST: VAT TYPE OF SP: ALL
MESSAGE SEQUENCE:
SPA SP B
Link Link
<------------ 1 - X LRT, SLC 1 - 1
1 - XLUN, SLC 1 - 1 ------------>
╜
╜ T12
╜
^
Fascicle VI.9 - Rec. Q.782 PAGE331
<------------ 1 - X LUA, SLC 1 - 1
TEST DESCRIPTION
1. Send an LRT from B to A and check that an LUN is received as described
above.
PAGE322 Fascicle VI.9 - Rec. Q.782
MTP LEVEL 3
TEST NUMBER: 8.1 PAGE: 1 of 1
REFERENCE:Q.704 S 11, 12.6, Fig. 46A
TITLE: Signalling traffic
flow control
SUB TITLE:Reception of a
TFC
PURPOSE:To check the actions of the system on reception of a TFC
PRE-TEST CONDITIONS: One or more link available
CONFIGURATION: A TYPE OF TEST: VAT TYPE OF SP: ALL
MESSAGE SEQUENCE:
SPA SP B
Link Link
:Start traffic
1 - 1TRAFFIC ------------>
<------------
Fascicle VI.9 - Rec. Q.782 PAGE331
1 - 1 TRAFFIC
<------------ 1 - 1 TFC, DPC = C
:Wait
:Stop traffic
Note - This test requires
further study.
TEST DESCRIPTION
1. Start traffic to B and C.
2. Send a TFC concerning C and check that this message is received correctly.
PAGE322 Fascicle VI.9 - Rec. Q.782
MTP LEVEL 3
TEST NUMBER: 8.2 PAGE: 1 of 1
REFERENCE:Q.704 S 11, 12.6, Fig. 46A
TITLE: Signalling traffic
flow control
SUB TITLE:Sending of TFCs
PURPOSE:To check the detection of a level 3 congestion
PRE-TEST CONDITIONS: All links available
CONFIGURATION: C TYPE OF TEST: VAT TYPE OF SP: STP
MESSAGE SEQUENCE:
SPB SPA SP C
Link Link Link
:Start traffic
1 - 1TRAFFIC (>n/2 E) ------->2 - 1 -----
(n E) ------->
<---------------1 - 1<-----
Fascicle VI.9 - Rec. Q.782 PAGE331
------------ 2 - 1 TRAFFIC (<n E)
1 - 2TRAFFIC (>n/2 E) ------->2 - 1 -----
(n E) ------->
<----------------1 - 2<----- 2 - 1 TRAFFIC (<n E)
-------------
:Wait
<----------------1 - XTFC,
DPC = C
.
.
.One TFC each 8 messages sent to C
.
<---------------- 1 - X TFC,
DPC = C
.
.
1 - 1 TRAFFIC (<n E) ----------> 2 - 1 -----
------------->
<-----------------1 - 1<----- 2 - 1 TRAFFIC
------------
2 - 1TRAFFIC (<n (<n E) ---------->2 - 1 -----
E) ------------->
<----------------1 - 2<----- 2 - 1 TRAFFIC (<n E)
-----------
PAGE322 Fascicle VI.9 - Rec. Q.782
:Wait
:Stop traffic
Note - n is the maximum load capacity of linkset 2. The traffic model used in this test
is described in Table 2/Q.706.
TEST DESCRIPTION
1. Start traffic to C with a load exceeding n/2 erlang on links 1 - 1 and 1 - 2
(n is the maximum load that the link 2 may carry without congestion).
2. Check that the signalling traffic flow control procedure is started in A.
Check that a TFC message concerning C is received for each 8 messages
received in B during the congestion.
3. Reduce the load to 0.1 erlang or less on links 1 - 1 and 1 - 2.
4. Check that the congestion disappears and that no TFC is received.
5. Stop traffic.
6. Check that the traffic from C to B has not been disturbed.
Fascicle VI.9 - Rec. Q.782 PAGE331