The drawings contain in this Recommendation have been done in Autocad.
Recommendation Q.781
MTP LEVEL 2 TEST SPECIFICATION
1 Introduction
This Recommendation contains a set of detailed tests of signalling system
No. 7 MTP level 2 protocol. These tests intend to validate the protocol specified
in Recommendation Q.703.
This Recommendation conforms to Recommendation Q.780 which describes the
basic rules of the Test Specification. In addition the conditions which are
specific to level 2 tests are described in the following sections.
2 General principles of level 2 tests
2.1 Presentation of test descriptions
The level 2 tests aim at testing the level 2 protocol conformance in a
given implementation.
Each test description indicates in the "type of test" column; "Validation"
(VAT) or "Validation" (VAT) and "compatibility" (CPT).
Although signal units are transmitted and received continuously on level
2, only the signal units which cause and/or indicate the changes of level 2
status are shown in the EXPECTED SIGNAL UNIT SEQUENCE column of each test
description.
2.2 Presentation of the test list
These tests as a whole, aim at a complete validation of the level 2
protocol without redundancies. Each test is described as simply as possible to
check precisely each elementary function of the protocol, which is referred in
the columns "reference", "title" and "sub-title" of each test description.
This list is presented in the form of a succession of tests. The
presentation order is essentially functional. However, the operator performing
these tests may change this order, taking into account some other practical
criteria such as: use pre-test conditions to order the list, the end of a given
test may be the pre-test condition of another test.
3 Test configuration
A single link will be used for level 2 tests. Figure 1/Q.781 shows a
single link between SP A and SP B. Test specifications are written to test the
level 2 of the SP A.
4 Test environment
See Recommendation Q.780, S 6.2.
5 Test list
Note - Compatibility test items are indicated in this list by an asterisk
(*).
e
expected delay of acknowledgement respectively.
1 Link State Control V Expected signal units/orders (Figures 8/Q.703 and
9/Q.703)
* 1.1 Initialisation (PowerVup)
* 1.2 Timer T2
1.3 Timer T3
1.4 Timer T1 and T4 (Normal)
* 1.5 Normal alignment V correct procedure (FISU)
1.6 Normal alignment V correct procedure (MSU)
1.7 SIO received during normal proving period
1.8 Normal alignment with PO set (FISU)
1.9 Normal alignment with PO set (MSU)
1.10 Normal alignment with PO set and clear
1.11 Set RPO when SAligned not readyT
1.12 SIOS received when SAligned not readyT
1.13 SIO received when SAligned not readyT
1.14 Set and clear LPO when SInitial alignmentT
1.15 Set and clear LPO when SAligned readyT
1.16 Timer T1 in SSAligned not readyT state
1.17 No SIO sent during normal proving period
1.18 Set and cease emergency prior to Sstart alignmentT
* 1.19 Set emergency while in Snot aligned stateT
1.20 Set emergency when SalignedT
1.21 Both ends set emergency
1.22 Individual end sets emergency
PAGE140 Fascicle VI.9 - Rec. Q.781
1.23 Set emergency during normal proving
1.24 No SIO sent during emergency alignment
* 1.25 Deactivation during initial alignment
1.26 Deactivation during aligned state
1.27 Deactivation during aligned not ready
1.28 SIO received during link in service
* 1.29 Deactivation during link in service
1.30 Deactivation during LPO
1.31 Deactivation during RPO
* 1.32 Deactivation during the proving period
1.33 SIO received instead of FISUs
1.34 SIOS received instead of FISUs
1.35 SIPO received instead of FISUs
2 Link State Control V Unexpected signal units/orders (Figure 8/Q.703)
2.1 Unexpected signal units/orders in SOut of serviceT state
2.2 Unexpected signal units/orders in SNot alignedT state
2.3 Unexpected signal units/orders in SAlignedT state
2.4 Unexpected signal units/orders in SProvingT state
2.5 Unexpected signal units/orders in SAligned readyT state
2.6 Unexpected signal units/orders in SAligned not readyT state
2.7 Unexpected signal units/orders in SIn serviceT state
2.8 Unexpected signal units/orders in SProcessor outageT state
3 Transmission failure (Figure 8/Q.703)
3.1 Link aligned ready (Break Tx path)
3.2 Link aligned ready (Corrupt FIBs)
3.3 Link aligned not ready (Break Tx path)
3.4 Link aligned not ready (Corrupt FIBs)
* 3.5 Link in service (Break Tx path)
3.6 Link in service (Corrupt FIBs)
3.7 Link in processor outage (Break Tx path)
3.8 Link in processor outage (Corrupt FIBs)
4 Processor Outage Control (Figure 10/Q.703)
4.1 Set and clear LPO while link in service
4.2 RPO during LPO
4.3 Clear LPO when "Both processor outage"
5 SU Delimitation, Alignment, Error Detection and Correction (Figures
11/Q.703 and 12/Q.703)
5.1 More than seven "1"s between MSU opening and closing flags
5.2 Greater than maximum signal unit length
5.3 Below minimum signal unit length
5.4 Reception of single and multiple flags between FISUs
5.5 Reception of single and multiple flags between MSUs
6 SUERM Check (Figure 18/Q.703)
6.1 Error rate of 1 in 256 - Link remains in service
6.2 Error rate of 1 in 254 - Link into out of service
6.3 Consecutive corrupted SUs
6.4 Time controlled break of the link
7 AERM check (Figure 17/Q.703)
7.1 Error rate below the normal threshold
7.2 Error rate at the normal threshold
7.3 Error rate above the normal threshold
7.4 Error rate at the emergency threshold
8 Transmission and reception control (Basic) (Figures 13/Q.703 and
14/Q.703)
8.1 MSU transmission and reception
8.2 Negative acknowledgement of MSU
8.3 Check RTB full
8.4 Single MSU with erroneous FIB
8.5 Duplicated FSN
8.6 Erroneous retransmission - Single MSU
8.7 Erroneous retransmission - Multiple FISUs
8.8 Single FISU with corrupt FIB
8.9 Single FISU prior to RPO being set
8.10 Abnormal BSN - Single MSU
8.11 Abnormal BSN - Two consecutive FISUs
Fascicle VI.9 - Rec. Q.781 PAGE147
8.12 Excessive delay of acknowledgement
8.13 Level 3 Stop Command
9 Transmission and reception control (PCR) (Figures 15/Q.703 and
16/Q.703)
* 9.1 MSU transmission and reception
9.2 Priority control
9.3 Forced retransmission with the value N1
9.4 Forced retransmission with the value N2
9.5 Forced retransmission cancel
9.6 Repetition of forced retransmission
9.7 MSU transmission while RPO set
9.8 Abnormal BSN - Single MSU
9.9 Abnormal BSN - Two MSUs
9.10 Unexpected FSN
9.11 Excessive delay of acknowledgement
9.12 FISU with FSN expected for MSU
9.13 Level 3 Stop Command
10 Congestion Control (Figure 19/Q.703)
10.1 Congestion abatement
10.2 Timer T7
10.3 Timer T6
6 Test descriptions
PAGE140 Fascicle VI.9 - Rec. Q.781
MTP, LEVEL 2
TEST NUMBER: 1.1 PAGE: 1 OF 1
REFERENCE:Q.703 S 7STD: Fig.8; Fig.
12; Fig. 13
TITLE:Link State Control - Expected signal
units/orders
SUB TITLE:Initialization (Power-up)
PURPOSE:To check that the No. 7 terminal equipment enters the
correct state on power-up
PRE-EST CONDITIONS:Line equipment - ON; No. 7 equipment- OFF
CONFIGURATION:1 TYPE OF TEST:VAT, CPT
EXPECTED SIGNAL UNIT SEQUENCE:
SPB SP A
Link Link
1 - 0SIOS ------------------------->
: Power ON
<----------------- 1 - 0 SIOS
--------
Fascicle VI.9 - Rec. Q.781 PAGE147
TEST DESCRIPTION
1. Check link enters correct state.
2. At "Power - On" or Initialization the FIB, BIB, FSN, and BSN
shall be as follows:
FIB = BIB = 1 : FSN = BSN = 127 (HEX 7F)
3. Repeat test in reverse direction.
PAGE140 Fascicle VI.9 - Rec. Q.781
MTP, LEVEL 2
TEST NUMBER: 1.2 PAGE: 1 OF 1
REFERENCE:Q.703 S 7STD:Fig. 8; Fig. 9, Fig. 11, Fig.
13; Fig. 14
TITLE:Link State Control - Expected signal
units/orders
SUB TITLE:Timer T2
PURPOSE:To check "Not Aligned" Timer T2
PRE-TEST CONDITIONS:Link out of service
CONFIGURATION:1 TYPE OF TEST: VAT, CPT
EXPECTED SIGNAL UNIT SEQUENCE:
SP B SP A
Link Link
1 - 0SIOS <-----------------------
--
----------------------- 1 - 0 SIOS
-->
: start
<----------------------- 1 - 0 SIO
--
Fascicle VI.9 - Rec. Q.781 PAGE147
eq \a\co1(|,|,|) T2
<----------------------- 1 - 0 SIOS
--
TEST DESCRIPTION
1. Timer T2 shall be in the range 5 secs to 150 secs.
PAGE140 Fascicle VI.9 - Rec. Q.781
MTP, LEVEL 2
TEST NUMBER: 1.3 PAGE: 1 OF 1
REFERENCE:Q.703 S 7STD:Fig. 9; Fig. 14
TITLE:Link State Control - Expected signal units/orders
SUB TITLE:Timer T3
PURPOSE:To check "Aligned" Timer T3
PRE-TEST CONDITIONS:Link out of service
CONFIGURATION:1 TYPE OF TEST:VAT
EXPECTED SIGNAL UNIT SEQUENCE:
Fascicle VI.9 - Rec. Q.781 PAGE147
SPB SPA
Link Link
<----------------------- 1 - 0SIOS
-----
1 - 0SIOS ----------------------
------>
:start
<----------------------- 1 - 0 SIO
-----
1 - 0SIO -----------------------
------>
<----------------------- 1 - 0 SIN
-----
PAGE140 Fascicle VI.9 - Rec. Q.781
eq \a\co1(╜,╜,╜) T3
<----------------------- 1 - 0 SIOS
----
TEST DESCRIPTION
1. Timer T3 shall be in the range 1 sec to 1.5
secs.
Fascicle VI.9 - Rec. Q.781 PAGE147
MTP, LEVEL 2
TEST NUMBER: 1.4 PAGE: 1 OF 1
REFERENCE:Q.703 S 7STD: Fig. 8; Fig. 9
TITLE:Link State Control - Expected signal units/orders
SUB TITLE:Timer T1 & Timer T4 (Normal)
PURPOSE:To check "Aligned ready" Timer T1 and "Proving period" Timer
T4 (Normal)
PRE-TEST CONDITIONS:Link out of service
CONFIGURATION:1 TYPE OF TEST:VAT
EXPECTED SIGNAL UNIT SEQUENCE:
SPB SPA
Link Link
PAGE140 Fascicle VI.9 - Rec. Q.781
<----------------------- 1 - 0SIOS
--
1 - 0SIOS ------------------------
-->
: start
<----------------------- 1 - 0 SIO
--
1 - 0SIO -----------------------
--->
<----------------------- 1 - 0 SIN
--
1 - 0SIN ----------------------- eq \a\co1(|,|,|) T4
---> (Pn)
<----------------------- 1 - 0 FISU
--
eq \a\co1(╜,╜,╜) T1
<----------------------- 1 - 0 SIOS
--
TEST DESCRIPTION
Fascicle VI.9 - Rec. Q.781 PAGE147
1. At 64 kbit/s Timer T4 shall be in the range 7.5 secs (nominally 8.2
secs) and Timer T1 shall be in the range 40 secs to 50 secs.
2. At 4.8 kbit/s Timer 74 shall be in the range 100 secs to 120 secs
(nominally 110 secs) and Timer T1 shall be in the range 500 secs to 600
secs.
PAGE140 Fascicle VI.9 - Rec. Q.781