home *** CD-ROM | disk | FTP | other *** search
/ Internet Standards / CD2.mdf / ccitt / 1992 / q / q1062.asc < prev    next >
Text File  |  1991-12-30  |  5KB  |  156 lines

  1.  
  2. Recommendation Q.1062
  3.  
  4.  
  5.  
  6.  
  7.  
  8.                DIGITAL PLMN ACCESS SIGNALLING REFERENCE CONFIGURATION
  9.  
  10.  
  11.  
  12.  
  13.  
  14. 1     General
  15.  
  16.  
  17.       This Recommendation provides the access signalling reference configuration for the digital 
  18. PLMN.
  19.  
  20.  
  21.  
  22. 2     Definitions
  23.  
  24.  
  25. 2.1   reference configurations
  26.  
  27.       Reference configurations are conceptual configurations useful in identifying various possible 
  28. physical access arrangements to  the  PLMN.  Two  concepts  are  useful  in  defining
  29. reference configurations: reference points and functional groups.
  30.  
  31.  
  32. 2.2   functional groups
  33.  
  34.       Functional groups are sets of functions which may be needed in PLMN access arrangements. In a 
  35. particular access arrangement, a specific function in a functional group may  or  may
  36. not be present. Note that a specific function in a functional group may be performed in 
  37. one or more pieces of equipment.
  38.  
  39.  
  40. 2.3   reference points
  41.  
  42.       Reference points are the conceptual points dividing functional groups. In a specific access 
  43. arrangement a reference point may correspond  to  a  physical  interface  (e.g.,  Um)
  44. between pieces of equipment or there may not be any physical interface corresponding to the 
  45. reference point.
  46.  
  47.  
  48.  
  49. 3     Signalling reference configurations
  50.  
  51.  
  52. 3.1   The reference configurations for the PLMN access define reference points and types of functions 
  53. that can be  provided.  Figure  1/Q.1062  shows  some  of  the  signalling  reference
  54. configurations.
  55.  
  56. 3.2   The Sm signalling reference point is the demarcation between RF transmission management and the 
  57. combined functions of  call  control  and  mobility  management.  Similarly,  the  Xm
  58. signalling reference point is the demarcation between call control and mobility management.
  59.  
  60.       The mobile station - base station Recommendations apply to interfaces at reference point Um. 
  61. These Recommendations are dependent on the pertaining  RF  transmission  capabilities
  62. and will not be dealt with in this document.
  63.  
  64.       At the reference point S, ISDN installations in accordance with I-Series Recommendations may be 
  65. used. At reference point R,  physical  interfaces  in  accordance  with  other  CCITT
  66. Recommendations   (e.g. the X-Series interface Recommendations) may by used.
  67.  
  68.  
  69.  
  70.  
  71.  
  72.                                   FIGURE 1/Q.1062
  73.                                           
  74.                         Signalling reference configurations
  75.  
  76.  
  77.  
  78.  
  79. 3.3   The list of functions for each functional group is given below.
  80.  
  81. 3.3.1     The RF transmission management block may perform functions similar to those of NT1, or combined 
  82. NT1 and NT2 of the CCITT I-Series Recommendations.
  83.  
  84.       It may include functions for:
  85.  
  86.       -   radio transmission termination(s); and
  87.  
  88.       -   upper layer protocol capabilities for radio transmission channel management.
  89.  
  90.  
  91. 3.3.2     The mobility management block may perform functions associated with:
  92.  
  93.       -   location updating/registration;
  94.  
  95.       -   handover coordination; and
  96.  
  97.       -   upper layer protocol capabilities for coordination functions between terminal equipment and 
  98.           RF transmission management.
  99.  
  100.  
  101. 3.3.3     A TEm may perform functions similar to those of the TE of the I-Series Recommendations. It may 
  102. include functions for:
  103.  
  104.       -   Layer 1 (physical) interface;
  105.  
  106.       -   Layer 2 (data link) protocol handling;
  107.  
  108.       -   Layer 3 protocol handling, and call control;
  109.  
  110.       -   maintenance functions; and
  111.  
  112.       -   switching and concentration (if applicable).
  113.  
  114. 3.3.4     The PLMN call control adaptation block includes signalling related functions belonging to 
  115. Layer 1 and higher layers of the Recommendation X.200 reference model that  allows  a
  116. TE1 or TE2 terminal to be served by the  digital  PLMN.  It  may  also  include  rate
  117. adaptation and flow control.
  118.  
  119.  
  120.  
  121. 4     Physical realization of reference configurations
  122.  
  123.  
  124. 4.1   Mobile station implementations may require that the S, R, Xm and Sm reference points be combined into a single physical entity, as in the case of a fully integrated mobile 
  125. equipment.
  126.  
  127.       Figure 2/Q.1062 shows possible realizations and/or configurations of the reference points 
  128. mentioned earlier.  The  examples  shown  are  not  exhaustive,  but  only  serve  to
  129. illustrate possible configurations of the respective functional blocks.
  130.  
  131.  
  132.                                   FIGURE 2/Q.1062
  133.                                           
  134.                          Examples of physical realizations
  135.  
  136.  
  137. 4.2   Example a) of Figure 2/Q.1062 illustrates a fully integrated equipment where the Xm and Sm 
  138. reference points are logically identifiable, but physically do not exist.
  139.  
  140.  
  141. 4.3   Example b) of Figure 2/Q.1062 illustrates the S reference point with respect to a CCITT TE1. In 
  142. this example the PLMN  call  control  adaptation  function  is  integrated  with  the
  143. remaining blocks as in a). As before the Xm and Sm reference points only bear logical 
  144. significance.
  145.  
  146.  
  147. 4.4   Example c) of Figure 2/Q.1062 illustrates the same configuration as in b), but now a CCITT TE2 
  148. is provided at reference point R. The PLMN call  control  adaptation  procedures  are
  149. distinct with respect to the one identified in b), but nonetheless the functionality is 
  150. the same as mentioned earlier.
  151.  
  152.  
  153.  
  154.  
  155.  
  156.