home *** CD-ROM | disk | FTP | other *** search
/ DP Tool Club 19 / CD_ASCQ_19_010295.iso / vrac / esaw101.zip / ESAW.DO_ / ESAW.DO
Text File  |  1994-10-25  |  25KB  |  811 lines

  1.  
  2.  
  3.  
  4.  
  5.  
  6.  
  7.  
  8.  
  9.             Employee Scheduling Assistant for Windows Version 1.01
  10.  
  11.  
  12.  
  13.                        A tool for Managers
  14.  
  15.  
  16.  
  17.  
  18.  
  19.  
  20.  
  21.  
  22.  
  23.  
  24.  
  25.  
  26.  
  27.  
  28.  
  29.  
  30.  
  31.  
  32.  
  33.  
  34.  
  35.  
  36.  
  37.  
  38.  
  39.  
  40.  
  41.  
  42.  
  43.  
  44.  
  45.  
  46.  
  47.  
  48.  
  49.  
  50.                   Guia International Corporation
  51.                        731 Edgewater place
  52.                      Kennesaw, Georgia 30144
  53.                          (404)926-6085
  54.  
  55.  
  56.  
  57.  
  58.  
  59.  
  60. Table of contents ~
  61. -----------------
  62.  
  63. Introduction ............................................ 1
  64.  
  65. Equipment needed ........................................ 2
  66.  
  67. Installation ............................................ 2
  68.  
  69. Display matching ........................................ 2
  70.  
  71. Using the Menus ......................................... 2
  72.  
  73. The Opening Screen ...................................... 3
  74.  
  75. The Editors.............................................. 3
  76.  
  77. Edit controls ........................................... 3
  78.  
  79. Moving around in the Main Editor ........................ 4
  80.  
  81. Entering and changing Daytypes in Editors ............... 4
  82.  
  83. Template ................................................ 4
  84.  
  85. The Time and Wages Distribution Graph ................... 5
  86.  
  87. Passwords protection .................................... 5
  88.  
  89. Reports ................................................. 5
  90.  
  91. Print Schedules ......................................... 6
  92.  
  93. Departments ............................................. 6
  94.  
  95. Setting up a new Department ............................. 7
  96.  
  97. Set or change year to start ............................. 7
  98.  
  99. Setting up Daytypes ..................................... 7
  100.  
  101. Examples ................................................ 8
  102.  
  103. Special Event days ...................................... 9
  104.  
  105. Employees ............................................... 9
  106.  
  107. Hourly and Salaried Employees ........................... 9
  108.  
  109. About Dates ............................................ 10
  110.  
  111. To start the Program after installation ................ 10
  112.  
  113. Technical information .................................. 10
  114.  
  115. Registration ........................................... 10
  116.  
  117.  
  118. Technical Support ....................................... 11
  119.  
  120.  
  121.  
  122.  
  123.  
  124.  
  125.  
  126.  
  127.  
  128.  
  129.  
  130.  
  131.  
  132.  
  133.  
  134.  
  135.  
  136.  
  137.  
  138.  
  139.  
  140.  
  141.  
  142.  
  143.  
  144.  
  145.  
  146.  
  147.  
  148.  
  149.  
  150.  
  151.  
  152.  
  153.  
  154.  
  155.  
  156.  
  157.  
  158.  
  159.  
  160.  
  161.  
  162.  
  163.  
  164.  
  165.  
  166.  
  167.  
  168.  
  169.  
  170.  
  171.  
  172.  
  173.  
  174.  
  175.  
  176. Introduction~
  177. ------------
  178.  
  179. Guia International offers two Employee schedulers;
  180.  
  181. o - This program, "Employee Scheduling Assistant for Windows"
  182.     is designed for businesses that have for the most part
  183.     full-time employees and want to do shift assignment,
  184.     keeping track of vacations, sick days etc..
  185.  
  186. o - "Scheduling Employees for Windows",  was developed for
  187.     those institutions that have mostly part-time help and
  188.     keep an eye on the bottom line, time and labor cost as
  189.     they schedule. Scheduling is done by dragging the mouse
  190.     to enter working start and stop times.
  191.     PC-World in the February, 1994 issue selected this
  192.     program as a best business program and commented, "This
  193.     program is why Windows has become standard equipment"
  194.  
  195. This program "Employee Scheduling Assistant for Windows"
  196. schedules for a fixed three year period. The computer screen
  197. moves across and vertical like a spreadsheet to view and
  198. make changes to these three years. The three years may start
  199. on the first of any month so that a business year may start on
  200. the first day May for the first year and end on the last day
  201. of February three years later. Every new business year you
  202. may move the window up one year or use the second year as
  203. your current business year. For each employee and date you
  204. may;
  205.  
  206. o - Enter a Daytype, representing a function like Vacation
  207.     or working time like 12:30am - 7:30pm
  208. o - Open a message window and leave information in it.
  209.     Information entered may be a sub-day schedule or
  210.     comments.
  211.  
  212. Up to 60 Special event days may be entered across the
  213. three year period. Special event days are holidays or other
  214. special events. Special event days are marked in the Editors
  215. as a green cell. Week-end cell are marked blue.
  216.  
  217. A graph displays the time and wage distribution
  218. for a 24 hours period for each hour and the number of
  219. employees scheduled for every 15 Minutes.
  220.  
  221. To make the application more "User friendly", the user
  222. will not have to deal with Directories and SubDirectories.
  223. If details of a technical nature are needed, see the
  224. section entitled "Technical information".
  225.  
  226.  
  227.  
  228.  
  229.  
  230.  
  231.  
  232.  
  233.  
  234. The application is divided in three parts:
  235.  
  236.           1 - The opening screen. It contains functions
  237.               related to the application, Departments and
  238.               Employees.
  239.  
  240.           2 - The (Two) Editors perform the scheduling and
  241.               schedule printing functions.
  242.  
  243.           3 - The Graph will show the Employee, time and
  244.               currency distribution for a 24 Hour period
  245.               with the option to print these statistics.
  246.  
  247. Equipment needed ~
  248. ----------------
  249.  
  250. You will need;
  251.  
  252. o - An IBM or compatible PC (386 or higher)
  253. o - A combination of at least one diskette drive and one
  254.     fixed(hard) disk.
  255. o - Microsoft Windows 3.1 or later.
  256. o - A mouse or pointing device must be attached.
  257. o - A VGA Monitor.
  258. o - A printer to print reports and schedules,
  259.     a laser printer is preferred.
  260.  
  261. Installation ~
  262. ------------
  263.  
  264. Before installing the application, make a backup
  265. copy of the program. Since the program is not copy protected,
  266. you may use the DOS command DISKCOPY or COPY *.*
  267.  
  268. Insert the program diskette in Drive A:
  269. From the Windows Program Manager, select "File", then "Run" and
  270. type a:setup. All the Programs and files will be
  271. installed, you will be prompted for the Disk drive and
  272. Directory that you want these files to be located, a
  273. default path is offered.
  274.  
  275. Display matching ~
  276. ----------------
  277.  
  278. If the display does not match the setup as a VGA display,
  279. change the Video Driver in the Program Manager "Main".
  280. The resolution, should be set at 640x480, the character size
  281. to Normal and Colors to 16.
  282.  
  283. Using the Menus ~
  284. ---------------
  285.  
  286. The Employee Scheduling Assistant for Windows, uses drop-down
  287. menus and buttons on the bottom of the screen. Just point to the
  288. Menu-bar on top and press the left mouse button and a further
  289. selection can then be made.
  290.  
  291.  
  292. The Opening Screen ~
  293. ------------------
  294.  
  295. The purpose of the Opening screen is to;
  296.  
  297.    o - Set up new Departments.
  298.    o - Enter, change or delete Employee records.
  299.    o - Print reports, Invoice and this manual with page numbers.
  300.    o - Set up options for file designation,time
  301.        format and the three year start date.
  302.    o - To enter and change Day types.
  303.    o - To set up and change special event days.
  304.    o - To set up Passwords
  305.    o - Help if needed.
  306.    o - Exit the application.
  307.  
  308. Click on "Schedule" to go to the Editor.
  309.  
  310. The Editors~
  311. -----------
  312.  
  313. Entering and changing schedules is performed in the Editors.
  314. There are two Editors;
  315.                        o - All Employees for a 31 period
  316.                        o - One Employee for one year
  317.  
  318. To switch from the main Editor to the Employee Editor, click
  319. the mouse on the Employee's name on the left of the screen.
  320. To become familiar with the application, some files are added
  321. during the installation process. These files created the
  322. "Example Department" with fictitious names for Employees and
  323. a single Schedule-file based on the date of installation.
  324. The Department represents a typical department with fictitious
  325. employees. Take a look at the screens, make changes, sort
  326. and open cells to enter information.
  327.  
  328. Click on "Show Graph" at the bottom of the screen, and the
  329. distribution for that day will be displayed.
  330. By clicking the mouse "Assignments" you can further
  331. break this information down and even print it.
  332.  
  333. Edit controls ~
  334. -------------
  335. Set the cursor to any cell on the screen by pointing the mouse
  336. and click with the mouse left button.
  337. You may also move the cursor positions with the arrow keys.
  338. By pointing at a cell and pressing the right mouse button,
  339. you will see the "Day detail" function. If you make an entry and click
  340. the mouse on "Save", a red underscore will indicate that that
  341. cell contain day detail information.
  342. To clear a "Day detail", clear the information and "Save".
  343. Twenty two Employees will fit on a screen, the vertical scroll
  344. bar will only be displayed if you have more than that.
  345. To quickly go from to first to the last page, two controls use
  346. on the bottom of the screen marked "First page" and "Last page".
  347.  
  348.  
  349.  
  350. Moving around in the Main Editor~
  351. --------------------------------
  352.  
  353. Picture the screen to move left and right across a three year
  354. period, like a spreadsheet by clicking the screen bottom
  355. plus/minus days and months. By clicking in the center, the
  356. current month or the first date shown will be the current date.
  357.  
  358. You may start this three year period on the first of any month.
  359. The start month and year is set by changing the department setting.
  360. The initial start date is set at 1 January of the current year,
  361. but you may change that.
  362. After the first year of scheduling has passed, you may elect to
  363. make no change in the three year cycle so you can check a schedule
  364. of the previous year and still have the option to schedule for the
  365. next year.
  366.  
  367. Vertical scrolling is done by clicking on the vertical scroll bar.
  368. This bar is only shown if you have more employees the will fit on
  369. the screen.
  370.  
  371. Entering and changing Daytypes in Editors~
  372. ------------------------------------------
  373.  
  374. By clicking on a cell, you may enter a Daytype at that
  375. cursor position.
  376. To clear a Daytype, press the spacebar or delete key.
  377.  
  378. Template~
  379. --------
  380.  
  381. If you have rotating shifts that either repeat themselves
  382. every number of weeks, you may use the Template function
  383. to enter the Daytypes in the Template, set the date that
  384. the cycle start and write it to the Main Editor.
  385. Important!
  386. Daytypes that have already been entered before pasting
  387. the Template will NOT be overwritten! If you have vacations
  388. etc. scheduled, the will remain.
  389. For those shifts that rotate on a multiple week cycle, a
  390. message will notify you if weeks are not full weeks.
  391. If you have permanent shift assignments, you may set the
  392. current shift assignment for up to 99 days ahead.
  393. To duplicate lines on the template:
  394.  
  395.    o - Place the cursor on the line to be duplicated.
  396.    o - Press the right mouse button.
  397.    o - A message will appear that the mouse is holding
  398.        Daytypes.
  399.    o - Place the cursor to the BLANK line to duplicate to.
  400.    o - Press the right button again.
  401.    o - To reset, click on the message box that holds the
  402.        mouse message.
  403.  
  404. When you paste the Template to the Main Editor, you can
  405. check the Main Editor it first before saving it.
  406.  
  407.  
  408. The Time and Wages distribution Graph ~
  409. -------------------------------------
  410.  
  411. By clicking on the "Show Graph" button in the Editor, the Time
  412. and Wages distribution will be shown. Initially, all
  413. assignments will be displayed. By entering each assignment,
  414. the graph will show more detail. Each 15 Minute period
  415. is represented with a graph line. The sequence starting with
  416. the first 15 minutes each hour is Red, White, Blue, Black.
  417. Salaried Employee are excluded from any currency
  418. calculations, only hourly Employees are reflected in the
  419. currency totals, time includes all Employees. A report with
  420. the 15 Minutes stats will print when you click on "Print".
  421.  
  422. Password protection ~
  423. -------------------
  424.  
  425. If you are a registered user, you will have access to the
  426. password function. Passwords, once entered will restrict
  427. access to the employee and schedule files. There are two
  428. levels of password access:
  429.  
  430.                   o - General Manager password
  431.                   o - Department Managers passwords (2)
  432.  
  433. The first password to enter will set the General Manager's
  434. password. The General Manager may enter up to two passwords
  435. per Department, and give them to the Department Managers as
  436. a temporary password. These passwords can then be changed
  437. by the Department Manager. By entering a Department Manager
  438. password, that manager has access to only that department.
  439. The General Manager will retain access to all departments.
  440. If the General Manager makes his/her password a blank, the
  441. password function is bypassed until a new password is
  442. entered. The General Manager may hide all Salaries and
  443. Wages from one or both Department Managers.
  444.  
  445. Reports ~
  446. -------
  447.  
  448. Two types of report are available, one Employee register
  449. that prints the Employee name and other information that is
  450. requested, the other is a requested Weekly Schedule to be
  451. printed.
  452. Any report may be printed and is started by the current
  453. screen in use. Print sequences are printed as they appear on
  454. the screen.
  455.  
  456.  
  457.  
  458.  
  459.  
  460.  
  461.  
  462.  
  463.  
  464.  
  465.  
  466. Print Schedules ~
  467. ---------------
  468.  
  469. Tree printing formats are offered.  One format will print
  470. the schedules vertically with Times and Currencies to the
  471. right and a format that shows the Days from left to right.
  472.  
  473. The three formats needs special font considerations, since
  474. the text must fit the paper to print on. You may select either
  475. Portrait or Landscape from Printer setup before starting the
  476. printing process. For most printers, a Courier font
  477. Pointsize 8 will be fine.  If you select a font that does
  478. not fit, you will be advised with a message.
  479.  
  480. If you print to a Matrix printer, select the Courier 17.1
  481. font. That is the font that used to print condensed in DOS.
  482. A Character based schedule is offered to save time, especially
  483. on Matrix printers, for Laser printers it does not make that
  484. much difference.
  485.  
  486. The Graphic based option has a better appearance. The smaller
  487. the Font size, the more names will print on a single page!
  488. The printer must have enough memory.
  489. The print-order is the same as the schedule displayed on
  490. the screen. As an option you may print Time and or Currency
  491. totals as  part of the output. The daily totals for some
  492. Employees may be off slightly if partial hours are worked,
  493. causing rounding errors.
  494. Time and currency totals do not include any "break times"
  495. that were set up in the Editor.
  496. No adjustments are made for "Overtime", the currency totals
  497. are strictly time scheduled, multiplied by the hourly rate.
  498. At your option you may direct your printing direct or through
  499. the Print Manager in Windows.
  500.  
  501. If you wish to print on another system, connect your printer
  502. from the current printing port (like LPT1:) to FILE via the
  503. Control Panel and name the file to a floppy, then copy the
  504. file to the printer port from the floppy in the new system.
  505.  
  506. Departments ~
  507. -----------
  508.  
  509. To decide the Department size, consider:
  510.  
  511.    A Department should include all the Employees that would be
  512.    the responsibility of a Manager. Employees should consistently
  513.    be a part of that Managers operating unit.
  514.  
  515. You may have up to 99 Department, and up to 60 Employees
  516. per Department.
  517.  
  518.  
  519.  
  520.  
  521.  
  522.  
  523.  
  524. Setting up a new Department ~
  525. ---------------------------
  526.  
  527. To set up a new department, click on "Department" and...
  528.  
  529. o - Fill in the department name.
  530. o - Enter the date that the business year will start. This
  531.     date must start on the first of any month or year, the
  532.     default is January 1, of the current year.
  533. o - Enter the names of the Department Employees, using upper
  534.     and lower case characters. You may alter or update any
  535.     information at any time. Click on "Employees" to start.
  536. o - If you have fixed items that you wish to track for each
  537.     or some days, fill in the activity column and related unit.
  538.     (Example, some organizations keep track of Vacation and
  539.     Sick time by the Hour rather than full or partial days.
  540.     For each day and each employee you may keep track of this
  541.     and use summaries to add for totals between dates. Take a
  542.     look at the "Example Department" to see how this is done).
  543.  
  544. Now we are ready to set up the Daytypes and Special Event days.
  545. and work Start and Stop times.
  546.  
  547. Set or change year to start~
  548. ---------------------------
  549.  
  550. Since the Main Editor covers a three year period, you may
  551. decide to change the start date of that three year cycle.
  552. This is done by changing the date in the department.
  553. Schedules between dates will be lost and you will be advised.
  554. If you wish to retain the schedules, print them out for
  555. save keeping.
  556.  
  557. Setting up Daytypes ~
  558. -------------------
  559.  
  560. Click the mouse on "Manager",
  561. select "DayTypes" and "Add Daytypes".
  562.  
  563. The object is to keep the Editors as readable as
  564. possible with a minimum of clutter causing confusion or
  565. distraction.  Remember, Daytypes are characters representing
  566. daily activities such as V= Vacation, 1= 7am-3pm etc. You may
  567. enter work Start and Stop times. At your option, fill in a
  568. break like a lunch period. If you are not concerned with
  569. working hours and wages, ignore any of the references made to
  570. Start/Stop times and Working Days.
  571.  
  572.  
  573.  
  574.  
  575.  
  576.  
  577.  
  578.  
  579.  
  580.  
  581.  
  582. Examples~
  583. --------
  584.  
  585. Example 1:
  586.  
  587. You are operating an office whose people work Monday through
  588. Friday.
  589. Set the Daytypes as follows:
  590. V= Vacation              00:00 00:00  00:00 00:00
  591. S= School                00:00 00:00  00:00 00:00
  592. Etc.
  593.  
  594. Click the mouse on "Manager",
  595. select "Daytypes" and "Blank Daytype".
  596.  
  597. Set Start/Stop           08:30 12:00  12:45 17:15
  598.  
  599. The Start and Stop times in the Blank Daytype are
  600. the normal work hours including lunch.
  601.  
  602. Example 2:
  603.  
  604. You are operating a store that is open from Monday through
  605. Saturday, the hours are from 9am to 5pm. Some Employees have
  606. the day off during the week to make up for the Saturday worked.
  607.  
  608. Set up Daytypes as follows:
  609.  
  610. L= 1pm - 9pm      13:00 21:00  00:00 00:00
  611. O= Off Day        00:00 00:00  00:00 00:00
  612. V= Vacation       00:00 00:00  00:00 00:00
  613. S= School         00:00 00:00  00:00 00:00
  614. Etc.
  615.  
  616. Blank Daytype     09:00 17:00  00:00 00:00
  617. Mark all the Working days with a "Yes" except Sunday.
  618.  
  619. The Start and Stop times in the Blank Daytype are the normal
  620. work hours, you may add lunch breaks if you wish.
  621.  
  622. Example 3:
  623.  
  624. You manage a hospital ward. Nurses work around the clock. The
  625. operation is 24 Hrs/Day, seven days a week including Special
  626. Event Days.
  627.  
  628. 1= 7am - 3pm      07:00 15:00  00:00 00:00
  629. 2= 3pm - 11pm     15:00 23:00  00:00 00:00
  630. 3= 11pm - 7am     23:00 07:00  00:00 00:00
  631. V= Vacation       00:00 00:00  00:00 00:00
  632. T= Training       00:00 00:00  00:00 00:00
  633. Etc.
  634. Blank Daytype     00:00 00:00  00:00 00:00
  635.  
  636.  
  637.  
  638.  
  639.  
  640. Example 4:
  641.  
  642. Fire Departments, usually have a 48 hour single assignment.
  643. Set the Daytypes as follows:
  644.  
  645. 1= Day 1           13:00 24:00  00:00 00:00
  646. 2= Day 2           00:00 24:00  00:00 00:00
  647. 3= Day 3           00:00 13:00  00:00 00:00
  648. V= Vacation        00:00 00:00  00:00 00:00
  649. T= Training        00:00 00:00  00:00 00:00
  650. Etc.
  651. Blank Daytype      00:00 00:00  00:00 00:00
  652.  
  653. Assignments in the Editors should be three consecutive days
  654. marked 1 2 3.
  655.  
  656. Any combination of circumstances may be adopted. The basic
  657. rule is that if the Blank Daytype working Start and Stop
  658. times are not 00:00, a blank Day Type in both Editors will
  659. represent a working day if marked.
  660.  
  661. Special Event Days~
  662. ------------------
  663.  
  664. Special Events Days are like special dates that are marked
  665. in the Editors as green cells. These dates represent dates
  666. like company Holidays or audit days. You may enter a total
  667. of 60 of those dates.
  668.  
  669. Click the mouse on "Manager", select "Special Event Days"
  670. and "Add Special Event Day".
  671.  
  672. Enter the Date, the name of the Event day and whether work
  673. would be performed if the Daytype is blank for that employee
  674. and the day is marked as a "Working day" in blank Daytype.
  675.  
  676. Employees ~
  677. ---------
  678.  
  679. Employees are entered in the Opening screen. While entering or
  680. changing an Employee record, use the Tab or Enter key to
  681. advance through the Employee screen or hold down the Shift key
  682. and press the Tab key for reverse tabbing.
  683. Instructions on the bottom will help you entering information.
  684. Employees are divided in Active and Inactive Employees.
  685. The Editors will only display Active Employees.  If you display
  686. an old schedule and an Employee on that schedule was deleted
  687. or inactive, when you save the schedule, that Employee will
  688. not be included in the schedule.
  689.  
  690. Hourly and Salaried Employees ~
  691. -----------------------------
  692.  
  693. The rate of pay option is divided between Hourly wages and
  694. Weekly salaries. Salary totals are not related to time worked.
  695. Time worked totals include both Hourly and Weekly Employees.
  696.  
  697.  
  698. About Dates ~
  699. -----------
  700.  
  701. Dates entered in the Employee record, conform to the International
  702. setting in the Windows Control Panel. You may enter: 2 apr 94 or:
  703. 2-Apr-94 or: apr 2, 1994 or any combination for April 2, 1994.
  704. If the year is omitted, the current system year is inserted.
  705. If there is an error in the date format, a message will alert you.
  706.  
  707.  
  708. To start the program after installation ~
  709. ---------------------------------------
  710.  
  711. After installation, you may select the Employee Scheduling
  712. Icon from the Program Manager Window, or select "Run" and
  713. answer Path\ESAFW to the file prompt.
  714.  
  715. Technical information ~
  716. ---------------------
  717.  
  718. This application creates Directories for new Departments as
  719. needed. The "Example Organization" is installed in Directory
  720. ESA1DIR during the install process. Subsequent Directories
  721. will be named automatically when new Departments are installed
  722. like ESA2DIR, ESA3DIR etc. When a Department is deleted, the
  723. Directory will also be deleted and reinstalled as new
  724. Department is created. The associated Directory is displayed
  725. on the Department Window when "Change Department" is
  726. selected from the menu. The files HEADING.DAT, EMPLREST.DAT.
  727. In the WINDOWS\SYSTEM Directory, the following files
  728. must be present:
  729.  
  730. THREED.VBX, CMDIALOG.VBX, VBRUN300.DLL, COMMDLG.DLL
  731.  
  732. Registration ~
  733. ------------
  734.  
  735. The registration fee is $49.50 in US currency. Registrations
  736. will be acknowledged by mail within 30 days of receipt and
  737. confirms the authorized use of the program. A confidential
  738. registration code that may be entered under Options in the
  739. opening menu will alter the opening screen so the shareware
  740. message will no longer be displayed. The registration code
  741. identifies the licensed user and must be protected.
  742. Any updates will be included if INVOICE.DOC is used for
  743. version determination.
  744. Agreements known as "Site License Agreements" providing for
  745. unlimited usage for one location (by address) are in effect
  746. after the registration of three regular registrations
  747. (to the amount of $148.50) have been submitted.
  748. Many recommendations for new features and also operational
  749. improvements come from our users. With your registration,
  750. include any remarks you wish, we will look at and evaluate
  751. every suggestion made and they are always welcome!
  752.  
  753.  
  754.  
  755.  
  756. Technical Support ~
  757. -----------------
  758.  
  759. After the registration has been received by Guia
  760. International, the User is entitled to free telephone or
  761. written support for a period of 90 Days. Any extended support
  762. may be negotiated thereafter but shall at minimum be in
  763. conformance with the regulations of the Association of
  764. Shareware Professionals (ASP).
  765. For assistance, call (404)926-6085.
  766.  
  767. Acknowledgements ~
  768. ----------------
  769.  
  770. PS/1 and PS/2 is a registered trademark of International
  771. Business Machines Corporation, Armonk, NY.
  772. Windows is a registered trademark of Microsoft Corp.
  773. Redmond, WA.
  774.  
  775. Program License Agreement ~
  776. -------------------------
  777.  
  778. Read the following terms and conditions before using the
  779. program. By using or accepting this program, you indicate
  780. that you accept the terms and conditions set forth bellow.
  781.  
  782. Guia International Corp. provides this program and licenses
  783. its use. You assume responsibility for the selection of these
  784. programs to achieve your intended results, and for the
  785. installation, use and results obtained from the programs.
  786.  
  787. The registration code when issued, is for the use of the
  788. registered user only for a single system or multiple systems
  789. in case of a "Site License Agreement".
  790.  
  791. Limited warranty
  792. The programs are provided without warranty either expressed
  793. or implied, including but not limited to the implied
  794. warranties of merchantability and fitness for a particular
  795. purpose. In no event, will Guia International Corp. be liable
  796. to you for any damages, including any lost profits, lost
  797. savings or other lost incidental or consequential damages
  798. arising out of the use or inability to use such programs even
  799. if Guia International Corp. or any of its agents or dealers
  800. had been advised of the possibility of such damages.
  801. When you start using the program as a production tool, the
  802. Opening Window fee is due to Guia International for each
  803. system the program is installed on.  The acknowledgement
  804. returned to you will serve as your license for authorized
  805. usage. You are free to duplicate the application and make
  806. distributions providing that no alterations are made with the
  807. exception of compression to facilitate electronic
  808. transmission. You acknowledge that you have read this
  809. agreement, understand it and agree to be bound by its terms
  810. and conditions.
  811.