Add Timesheet

Resource: IAN_NEEDS
Date: Monday, 14/09/98
Activity: DESIGN, Design System
Project:
Hours:
Overtime
Cost:
Default
Specify
Overide cost rate amount
Charge:
Non-Chargeable
Default
Chargeable
Overide charge rate amount
Notes:

Save or Cancel Timesheet