IP Over Cable Data Network WG (ipcdn) Wednesday April 9 at 1415-1515 ============================== AGENDA: Intro and Agenda Bashing - 10 Minutes MCNS Status - 15 Minutes RF MIB Submission - 15 Minutes (MCNS submission) Architecture Bashing - Multi ISP over single cable system issues. 15 Minutes Wrapup and action Items - 5 minutes. For the architecture bashing on multi ISP over cable system - think about and be prepared to discuss how you might let two ISPs coexist on the same cable system. Is there a difference in how you would treat an IPCDN system vs something like an ADSL system? Where do you draw provisioning and management lines? How do you manage VPN services in a multi ISP system. (For another view of this, think about how you would get multiple ISPs to share subscribers on a single physical ethernet? On a switched ethernet? On a cell switched system? On a physically switched system?)