Distributed Management WG (disman) Monday April, 4 at 0930 - 1130 Tuesday April, 4 at 1530 - 1730 =============================== AGENDA: Preparation: Please read the following drafts in preparation for the meeting. Monitor the mailing list for updates and additional documents prior to the internet-draft cutoff date. New documents and updates have been promised; notices will be posted to the mailling list. ftp://ftp.ietf.org/internet-drafts/draft-ietf-disman-script-mib-01.txt ftp://ftp.ietf.org/internet-drafts/draft-ietf-disman-framework-00.txt (several more drafts from Bob Stewart are on their way) Presentations: PLEASE - read http://www.ietf.org/instructions/instructions.html for guidelines for presentation/overhead material for inclusion in the hardcopy/electronic proceedings. The guidelines have CHANGED from what you may remember. Agenda: 1. Administrative issues 1.1 Review of agenda 1.2 Mailing List Information 1.3 Charter Revision 1.3.1 Personnel changes 1.3.2 FTP site changes 1.3.3 Schedule adjustments 1.4 New revision of stdguide and security requirements 1.5 Allocation of time for discussions 2. Technical Presentations 2.1 Andy Bierman MLM trap dispatching (see email of 1997-03-06) 2.2 Juergen Schoenwaelder implementation experience and script security 2.3 Bob Stewart on the Expression MIB (and more) 3. General Technical Discussion 3.1 Framework issues 3.1.1 review of current draft 3.1.2 accomodate threshold monitoring and expression MIB work in future 3.1.3 naming 3.1.4 selection 3.1.4.1 explaing what's there 3.1.4.2 other mechanisms? 3.1.5 granularity 3.1.6 filter rules 3.1.7 schedule moved from script work 3.1.8 dispatch 3.1.8.1 event dispatch 3.1.8.2 trap dispatch 3.1.9 implementability 3.2 Script MIB issues 3.2.1 review of current draft 3.2.2 representing stored script owner 3.2.3 representing executing script initiator 3.2.4 implementability 3.3 Expression evaluation MIB issues 3.3.1 review of current draft 3.3.2 representing stored expression owner 3.3.3 representing executing expression initiator 3.3.4 implementability 3.4 Common issues 3.4.1 integration with other mibs 3.4.2 conformance issues 3.4.3 representing ownership 3.4.4 security considerations 3.4.5 implementability 3.4.6 deployability 4. Future work 4.1 Presentations on future topics for work 4.2 Discussion of future work 4.2.1 threshold monitoring 4.2.2 SNMPng issues 4.2.3 logging work with applmib 4.2.4 relationship to ptopo 5. Closing 5.1 Review of action items 5.1.1 items for next draft of framework 5.1.2 items for next draft of script MIB 5.1.3 additional action items 5.2 Discussion of next meeting