Below are the streets that will be repaved between July and October. Streets noted with an asterisk will have TV camera sewer inspection because of possible sanitary sewer main problems. If sewer mains are determined to have major defects, these streets will not be resurfaced until the necessary reparis are made.
Street | Section | Street | Section | |
---|---|---|---|---|
11th Street | Hopper Ave. to Fair Lawn Ave. | Elden Place | Menow St. to Dead End | |
20th Street | Berdan Ave. to Fair Lawn Ave. | Eugene Street | Entire | |
26th Street | Berkshire Rd. To Pellack Dr. | Everett Terrace | Entire | |
26th Street | Dead End to Berkshire Rd. | Floral Ave. | Entire | |
29th Street | Broadway to Rosalie | *High Street | Hunter Place to Jordan Road | |
35th Street | Entire | *Hillery Street | Entire | |
*Aberdeen Pl. | Entire | *Jasper Road | Entire | |
Alexander Ave. | 12th Street to Dead End | Legion Place | Entire | |
Arlington Pl. | Entire | Menow Street | Entire | |
Arnold St. | Entire | Pine Avenue | Entire | |
Beekman Pl. | Entire | *Plaza Road | Rosalie St. to Ramapo Terr. | |
Bergen Ave. | River Rd. to George St. | *Plaza Road North | High St. to Owen Ave. | |
Berkshire Rd. | 30th St. to Fair Lawn Pkwy. | Radburn Rd. | Fair Lawn Ave. to Garwood | |
Bristol Pl. | Entire | *Raphael Street | Plaza Rd. to 32nd St. | |
Burbank St. | Alexander Ave. to Berdan Ave. | Sycamore Drive | Turnbridge Rd. to Blue Hill | |
Burnham Pl. | Entire | Turnbridge Rd. | Entire | |
Cadmus Pl. | Entire | *Victoria Road | Entire | |
Dobrin Court | Entire | Virginia Drive | Entire |