FLIGHT NO: 3-53-79 DATE OF REPORT: 8-18-66
PILOT: William H. Dana DATE OF FLIGHT: 8-4-66
CARRIER AIRCRAFT: B-52 #008 LAUNCH LAKE: Mud Lake
ENGINE NO: S/N 111 APU #1 14AN APU #2 23AN
PURPOSE OF FLIGHT: 1. Pilot Checkout
I. Discussion of Previous Operations2. Heat Transfer Panel3. Cockpit Display
4. Horizontal Tail Loads
5. Boundary Layer Noise
6. Optical Background (#25)
B. The cockpit pressure dump-valve was changed because of some peculiarities in cockpit pressure during flight.
C. One of the gyro heaters was found to have an intermittent thermoswitch and was repaired.
D. The lower RH and rudder BLN panels were installed.
B. The upper and lower bugeye cameras were installed and wired for cine operation. This was to photograph the third skid with the lower bugeye and checkout the upper bugeye.
C. The BLN installation was completed.
B. The aircraft was closed out and mated to B-52 #008 on 8/3/66.
Perry V. Row Vincent N. Capasso
X-15 Senior Project Engineer X-15 Project Engineer