Flight No.: 2-34-57 Scheduled Date : September 29, 1964
Pilot: Major R. Rushworth
Purpose : To obtain
data for the following programs:
1. Stability and Control Evaluation - (Glenn Robinson)2. Star Tracker Checkout - (Lovic Thomas)
3. Advanced X-15 Landing Dynamics - (Jim McKay)
Instrumentation
Engineer - Paul Harney
Launch: Mud Lake #1 on magnetic heading 170°, SAS Hi-Lo-Hi (8-4-8), ASAS Armed, heading vernier "Standby," both BCS "ON," RAS "OFF," ventral off.
Launch point coordinates:
38° 05 N; 117° 17.5 W.
No. | Time | Alt | V | a | q | Event |
1. | 0 | 45 | 790 | 0 | 145 | Launch, light engine, increase to 100%T. Rotate at 10° a (» 2g) until q = 30°. |
2. | 27 | 49 | 1900 | 10 | 690 | q = 30°. Maintain q = 30°. |
3. | 37 | 58 | 2280 | 5 | 645 | Pushover to zero g. (H-dot » 900 fps). |
4. | 66 | 82 | 4000 | 0 | 630 | Extend speed brakes to 35°. |
5. | 81 | 92 | 5200 | 0 | 640 | Shut down, retract speed brakes, increase a to 4°. |
6. | 97 | 96 | 5000 | 4 | 485 | Disengage ASAS, disengage pitch damper, perform pitch pulse. Engage pitch damper. |
7. | 119 | 91 | 4800 | 4 | 575 | Disengage yaw and roll dampers. Perform rudder pulse. |
8. | 136 | 85 | 4600 | 4 | 715 | H-dot = -400 fps, increase a to 10°. |
9. | 145 | 84 | 4500 | 10 | 720 | Perform rudder pulse. Engage roll and yaw dampers. Pushover to 5° a. |
10. | 173 | 85 | 4000 | 5 | 540 | Disengage pitch damper, perform pitch pulse, engage pitch damper. |
11. | 196 | 83 | 3800 | 5 | 540 | Disengage yaw and roll dampers, perform rudder pulse, engage roll and yaw dampers. |
12. | 216 | 79 | 3600 | 5 | 590 | Disengage pitch damper, perform pitch pulse, engage pitch damper. |
13. | 238 | 76 | 3400 | 5 | 610 | Disengage yaw and roll dampers, perform rudder pulse, engage roll and yaw dampers. |
14. | 255 | 72 | 3200 | 5 | 650 | Disengage pitch damper, perform pitch pulse, engage pitch damper. |
15. | 269 | 70 | 3000 | 5 | 630 | Disengage yaw and roll dampers, perform rudder pulse. |
16. | 280 | 68 | 2800 | 5 | 605 | Extend speed brakes to 35°, pushover to 2° a. |
17. | 294 | 65 | 2400 | 2 | 510 | Perform rudder pulse. |
18. | 311 | 58 | 2100 | 2 | 545 | Perform rudder pulse. Engage roll and yaw dampers. Arm ASAS, vector to High Key, speed brakes as required. |
19. | High Key - check flap and "squat" circuit breakers in. | |||||
20. | Before APU shutdown, cycle flaps, set stabilizer trim to zero, data off. |
Notes:
2. Emergency Lakes: Grapevine and Cuddeback.
3. Flight duration: Approximately 10 min.
4. Flight plan based on 60,000# thrust - engine #106
Total burn time at 100% = 84 sec.
Launch weight = 34,600#, burnout weight = 16,450#
Ground jettison check
2. Malfunction of any SAS channel.
3. Malfunction of inertial platform.
4. Total ball nose failure.
5. APU gearbox pressurization malfunction.
Failure Action
1. | Radio or Radar | Proceed as planned. | |
2. | Total Pitch Damper | Proceed as planned. Manipulate roll and yaw dampers at pilot's discretion. | |
3. | Total Yaw Damper | Proceed as planned. | |
4. | Total Roll Damper | Proceed as planned, turn yaw damper "off." Manipulate pitch damper at pilot's discretion. | |
5. | Attitude Failure | Use 5° a instead of 30° q at 27 sec. Disengage dampers at pilot's discretion. | |
6. | Ball Nose | Rotate at 2g instead of 10° a. Do not disengage dampers. | |
7. | Delayed engine light | Pushover to "0" g at 52,000 ft. (H-dot = 900 fps). |
8. Inadvertent engine shutdown
0 - 43 sec Delamar
43 - 66 sec Hidden Hills (2500 fps)
66 - 71 sec Cuddeback (4000 fps)
71 - Up sec Edwards
(4400 fps)