X-15 FLIGHT REQUEST

Flight No.: 2-31-52 (Revised) Scheduled Date : November 7, 1962

Pilot: John B. McKay

Subject of Test : Ventral off stability and aerodynamic boundary layer investigations

Launch: Mud Lake on magnetic heading 177°, SAS 6-4-8, ASAS Armed, R. C. "ON," RAS "OFF."
 
 
 No.   Time  Alt  V a  q   Event
             
1. 0 45 790 2 145 Launch - light engine, advance to 100%T - rotate until 2 g is attained.
             
2. 20 50 1400 11 450 Maintain 2g until q = 30° - maintain q = 30°.
             
3. 37 62 2400 5 600 Pushover to "0" g.
             
4. 65 87 4300 0 550 Extend speed brakes to 20°.
             
5. 79 93 5550 0 600 Shutdown.
             
6. 85 95 5450 0 570 Pullup to a = 20°, perform da pulses.
             
7. 100 100 4900 20 340 Retract speed brakes, readjust a to 20°, perform da pulses.
             
8. 109 106 4600 20 220 Pushover to "0" g.
             
9. 150 125 4200 0 80 Peak altitude - engage RAS, dh and da pulses. Disengage RAS.
             
10. 201 85 4200 0 600 Pullup to 3.5g ( 11°).
             
11. 234 65 3500 »11 900 Pushover to "0" g.
             
12. 250 75 3100 0 520 Pullup to 10°, perform dv pulses.

X-15 FLIGHT REQUEST

Flight No.: 2-31-52 Scheduled Date : November 1, 1962

Pilot: John B. McKay

Subject of Test : Ventral off stability and aerodynamic boundary layer investigations

Launch: Mud Lake on magnetic heading 177°, SAS 6-4-8, ASAS Armed, R. C. "ON," RAS "OFF."
 
 
No. Time Alt V a Event
             
1. 0 45 790 2 145 Launch - light engine, advance to 100%T - rotate until 2 g is attained.
             
2. 20 50 1400 11 450 Maintain 2g until q = 30° - maintain q = 30°.
             
3. 35 60 2200 5 525 Pushover to "0" g.
             
4. 70 87 4600 0 570 Extend speed brakes to 20°.
             
5. 79 93 5550 0 600 Shutdown.
             
6. 85 95 5450 0 570 Pullup to a = 20°, perform da pulses.
             
7. 100 100 4900 20 340 Retract speed brakes, readjust a to 20°, perform da pulses.
             
8. 109 106 4600 20 220 Pushover to "0" g.
             
9. 150 125 4200 0 80 Peak altitude - engage RAS (if available), perform dh and da pulses. Disengage RAS.
             
10. 201 85 4200 0 600 Pullup to 3.5g ( 11°).
             
11. 234 65 3500 »11 900 Pushover to "0" g.
             
12. 250 75 3100 0 520 Pullup to 10°, perform dv pulses.
             
13. 275 75 2700 »10 320 Pushover to "0" g.
             
14. 330 70 2300 0   Vector to high key.
             
15. 358 45 1900   600 Pushover to "0" g for approximately 5 sec. Start jettison (H2O2 OFF).

16. High key, pressurize tanks.

17. Before APU shutdown, cycle controls, retract flaps, set stabilizer trim to zero. Data off.

Notes: 1. Duration of flight approximately 10 min.

2. q vernier will be set at 30°, a crosspointer will null at 0°.

3. Emergency Lakes: Grapevine and Cuddeback.

Alternate Situations After Launch: 1. For radio or radar failure, proceed as planned.

2. If engine light cannot be accomplished within 30 sec. jettison propellants and land at Mud Lake.

3. For delayed engine light, proceed as planned.

4. For total pitch damper failure, proceed, do not retract speed brakes at 20° a.

5. For total roll damper failure, turn yaw damper off, proceed, do not exceed 18° a.

6. For yaw damper failure during power portion, fly a = 2°, after power portion proceed as planned.

7. For ball nose failure, fly 1g proceed to Edwards for landing.

8. For attitude failure, proceed, do not exceed 15° a.