Flight No.: 2-26-46 Scheduled Date : August 7, 1962
Pilot: Major R. Rushworth
Subject of Test : Aerodynamic heating rates at low Mach number and high angle of attack, RAS check, and aerodynamic drag.
Launch: Hidden Hills
Lake on magnetic heading 167°, ASAS "Armed," SAS 8-8-8
No. | Time | Alt | V | a | q | Event |
1. | 0 | 45 | 790 | 2 | 145 | Launch, light engine, increase to 100%T, rotate until 2g is attained. |
2. | 21 | 46 | 1700 | 10 | 600 | Maintain 2g until q = 20°. |
3. | 32 | 51 | 2200 | 4 | 700 | Pushover to g = .1 (a» 2°). |
4. | 48 | 59 | 3000 | 2 | 1000 | Roll to 80° right bank. |
5. | 54 | 64 | 3500 | 2 | 1050 | Increase a slowly to 10° (gmax = 4.0). |
6. | 59 | 66 | 3700 | 4 | 1120 | Reduce to 40%T (or as required). |
7. | 72 | 66 | 3800 | 10 | 1250 | Modulate speed brakes if required to maintain constant conditions. |
8. | 98 | 68 | 4000 | 10 | 1225 | Burnout - turn as required to vector to Edwards (maintain a» 10°). |
9. | 146 | 83 | 2600 | »8 | 256 | At q = 10°, pushover-pullup to a» 8, 0, 10. |
10. | 154 | 84 | 2500 | 225 | Peak Altitude. | |
11. | 180 | 81 | 2200 | 10 | 225 | Disengage and reengage yaw channel twice (no control inputs). |
13. Start jettison (H2O2 "OFF").
14. High key, check ventral armed, pressurize tanks, perform pushover-pullup maneuver (a» 10, 0, 10) when at M » 0.8, push-to-test ball nose.
14. Before APU shutdown,
cycle controls, retract flaps, set stabilizer trim to zero. Data off.
2. q vernier will be set at 30°, a crosspointer will null at 10°.
3. Emergency Lakes: Hidden Hills, Silver and Three Sisters.
2. Malfunction of inertial system attitudes.
3. Malfunction of ball nose.
2. For delayed engine light, add 3 sec. to pushover time.
3. If radar or radio fail, proceed as planned.
4. For total pitch or roll damper failure, do not increase a above 8°.
5. For ball nose or attitude failure, vector to Edwards for landing.
6. For inadvertent engine shutdown:
0 - 35 sec Hidden Hills
35 - 54 sec Silver
54 - 70 sec Three Sisters
70 - Up sec Edwards