FLIGHT NO: 1-60-99 DATE OF REPORT: 10/26/65
PILOT: Capt. W. Knight DATE OF FLIGHT: 9/30/65
CARRIER AIRCRAFT: B-52 #003 LAUNCH LAKE: Hidden Hills
ENGINE SERIAL: 108 APU #1 16 APU #2 20
PURPOSE OF FLIGHT: 1. Pilot Checkout
2. I. R. Scanner (HRB Singer)
I. Discussion of Previous Operations
B. Satisfactory APU runs were accomplished on 9/27/65; the BCS was not preflighted.
C. A pilot-checkout fit check was accomplished on 9/28/65 to determine proper seat hardware for Captain Knight. A simulated flight with canopy closed, X-15 suit vent supply and X-15 oxygen supply was made to familiarize the pilot with switch location and sequence as part of the flight checklist.
D. Replacement of the SAS Hi-Lo-Hi gain box and a roll channel malfunction detector module was necessary after the preflight was accomplished. A malfunction occurred in the SAS in-flight test sequence during the pilot simulated flight. The parts were replaced, and a satisfactory checkout followed.
E. Some delays occurred during the IFDS post closeout operation resulting in completion at 0200, 9/30/65. Aircraft mating was then accomplished, the B-52 moved to the X-15 service area, and propellant service for flight was commenced.
Perry V. Row Ronald S. Waite
X-15 Senior Project Engineer X-15 Project Engineer